-
1
-
-
2342436357
-
-
" Construction Research Congress, Honolulu.
-
Akinci, B., Tantisevi, K., and Ergen, E. (2003). " Assessment of the capabilities of a commercial 4D CAD system to visualize equipment space requirements on construction sites.." Construction Research Congress, Honolulu, 989-995.
-
(2003)
Assessment of the Capabilities of A Commercial 4D CAD System to Visualize Equipment Space Requirements on Construction Sites
, pp. 989-995
-
-
Akinci, B.1
Tantisevi, K.2
Ergen, E.3
-
2
-
-
1842832075
-
-
Constr. Manage. Econ., (2).
-
Heesom, D., and Mahdjoubi, L. (2004). " Trends of 4D CAD applications for construction planning.." Constr. Manage. Econ., 22 (2), 171-182.
-
(2004)
Trends of 4D CAD Applications for Construction Planning
, vol.22
, pp. 171-182
-
-
Heesom, D.1
Mahdjoubi, L.2
-
3
-
-
0034227635
-
-
J. Constr. Eng. Manage., (4).
-
Koo, B., and Fischer, M. (2000). " Feasibility study of 4D CAD in commercial construction.." J. Constr. Eng. Manage., 126 (4), 251-260.
-
(2000)
Feasibility Study of 4D CAD in Commercial Construction
, vol.126
, pp. 251-260
-
-
Koo, B.1
Fischer, M.2
-
4
-
-
61849089809
-
-
" ICCCBE-XI: 11th Int. Conf. on Computing in Civil and Building Engineering, Montreal.
-
Ma, H., Ha, K. M. E., Chung, C. K. J., and Amor, R. (2006). " Testing semantic interoperability.." ICCCBE-XI: 11th Int. Conf. on Computing in Civil and Building Engineering, Montreal, 1216-1225.
-
(2006)
Testing Semantic Interoperability
, pp. 1216-1225
-
-
Ma, H.1
Ha, K.M.E.2
Chung, C.K.J.3
Amor, R.4
-
5
-
-
0032165225
-
-
Autom. in Constr., (6).
-
McKinney, K., and Fischer, M. (1998). " Generating, evaluating and visualizing construction schedules with 4D-CAD tools.." Autom. in Constr., 7 (6), 433-447.
-
(1998)
Generating, Evaluating and Visualizing Construction Schedules with 4D-CAD Tools
, vol.7
, pp. 433-447
-
-
McKinney, K.1
Fischer, M.2
-
6
-
-
0036457310
-
-
" Proc., Computing in Civil Engineering, ASCE, Reston, Va..
-
Messner, J., Yerrapathruni, S. C., Baratta, A., and Riley, D. R. (2003). " Cost and schedule reduction of nuclear power plant construction using 4D CAD and immersive display technologies.." Proc., Computing in Civil Engineering, ASCE, Reston, Va., 136-144.
-
(2003)
Cost and Schedule Reduction of Nuclear Power Plant Construction Using 4D CAD and Immersive Display Technologies
, pp. 136-144
-
-
Messner, J.1
Yerrapathruni, S.C.2
Baratta, A.3
Riley, D.R.4
-
8
-
-
58849112151
-
-
Construction Research Congress VI, Orlando, Fla..
-
Russell, A. D., and Udaipurwala, A. (2000). " Assessing the quality of a construction schedule.." Construction Research Congress VI, Orlando, Fla., 928-937.
-
(2000)
Assessing the Quality of A Construction Schedule
, pp. 928-937
-
-
Russell, A.D.1
Udaipurwala, A.2
-
10
-
-
42649088278
-
-
" Joint 2006 CIB W065/W055/W086 Int. Sym Proc. Construction in the XXI Century: Local and Global Challenges, Rome, Italy.
-
Russell, A. D., Udaipurwala, A., and Wong, W. (2006). " Unifying CPM and linear scheduling: A definitive treatment.." Joint 2006 CIB W065/W055/W086 Int. Symp. Proc. Construction in the XXI Century: Local and Global Challenges, Rome, Italy.
-
(2006)
Unifying CPM and Linear Scheduling: A Definitive Treatment
-
-
Russell, A.D.1
Udaipurwala, A.2
Wong, W.3
-
11
-
-
0027607475
-
-
J. Constr. Eng. Manage., (2).
-
Russell, A. D., and Wong, W. C. M. (1993). " New-generation of planning structures.." J. Constr. Eng. Manage., 119 (2), 196-214.
-
(1993)
New-generation of Planning Structures
, vol.119
, pp. 196-214
-
-
Russell, A.D.1
Wong, W.C.M.2
-
12
-
-
70349286473
-
-
Structural engineering world wide, Elsevier Science Ltd., Amsterdam, The Netherlands, T191-1.
-
Staub, S., and Fischer, M. (1998). " Constructability reasoning based on a 4D facility model.." Structural engineering world wide, Elsevier Science Ltd., Amsterdam, The Netherlands, T191-1.
-
(1998)
Constructability Reasoning Based on A 4D Facility Model
-
-
Staub, S.1
Fischer, M.2
-
13
-
-
0042861949
-
-
" Technical Re No. 122, Center for Integrated Facility Engineering (CIFE), Stanford University, Stanford, Calif.
-
Staub-French, S., and Fischer, M., (2001). " Industrial case study of electronic design, cost, and schedule integration.." Technical Rep. No. 122, Center for Integrated Facility Engineering (CIFE), Stanford University, Stanford, Calif.
-
(2001)
Industrial Case Study of Electronic Design, Cost, and Schedule Integration
-
-
Staub-French, S.1
Fischer, M.2
-
14
-
-
34249807025
-
-
Can. J. Civ. Eng., (12).
-
Tabesh, A., and Staub-French, S. (2006). " Modeling and coordinating building systems in 3D: A case study.." Can. J. Civ. Eng., 33 (12), 1490-1504.
-
(2006)
Modeling and Coordinating Building Systems in 3D: A Case Study
, vol.33
, pp. 1490-1504
-
-
Tabesh, A.1
Staub-French, S.2
|