메뉴 건너뛰기




Volumn 20, Issue 1, 2009, Pages 113-121

Multi-criteria decision making for assembly line balancing

Author keywords

Assembly line balancing; COMSOAL; Data envelopment analysis; Multi criteria decision

Indexed keywords

ASSEMBLY MACHINES; DATA ENVELOPMENT ANALYSIS; LINEAR PROGRAMMING;

EID: 58549107798     PISSN: 09565515     EISSN: 15728145     Source Type: Journal    
DOI: 10.1007/s10845-008-0107-3     Document Type: Article
Times cited : (17)

References (24)
  • 1
    • 40849130689 scopus 로고
    • COMSOAL: A computer method of sequencing operations for assembly lines
    • L. Arcus A. 1966 COMSOAL: a computer method of sequencing operations for assembly lines International Journal of Production Research 30 259 277
    • (1966) International Journal of Production Research , vol.30 , pp. 259-277
    • Arcus, A.L.1
  • 2
    • 0021497874 scopus 로고
    • Some models for the estimation of technical and scale inefficiencies in Data Envelopment Analysis
    • R.D. Banker A. Charnes W.W. Cooper 1984 Some models for the estimation of technical and scale inefficiencies in Data Envelopment Analysis Management Science 30 1078 1092
    • (1984) Management Science , vol.30 , pp. 1078-1092
    • Banker, R.D.1    Charnes, A.2    Cooper, W.W.3
  • 3
    • 25144450992 scopus 로고    scopus 로고
    • A survey on problems and methods in generalized assembly line balancing
    • 3
    • C. Becker A. Scholl 2006 A survey on problems and methods in generalized assembly line balancing European Journal of Operational Research 168 3 694 715
    • (2006) European Journal of Operational Research , vol.168 , pp. 694-715
    • Becker, C.1    Scholl, A.2
  • 4
    • 0022768294 scopus 로고
    • A survey of exact algorithms for the simple assembly line balancing problem
    • I. Baybars 1986 A survey of exact algorithms for the simple assembly line balancing problem Management Science 32 909 932
    • (1986) Management Science , vol.32 , pp. 909-932
    • Baybars, I.1
  • 7
    • 0016556599 scopus 로고
    • Solving large single-model assembly line balancing problems-A comparative study
    • E.M. Dar-El 1975 Solving large single-model assembly line balancing problems-A comparative study AIIE Transactions 7 302 310
    • (1975) AIIE Transactions , vol.7 , pp. 302-310
    • Dar-El, E.M.1
  • 8
    • 0034296450 scopus 로고    scopus 로고
    • Applying the COMSOAL computer heuristic to the constrained resource allocation problem
    • G.W. DePuy G.E. Whitehouse 2000 Applying the COMSOAL computer heuristic to the constrained resource allocation problem Computers & Industrial Engineering 38 413 422
    • (2000) Computers & Industrial Engineering , vol.38 , pp. 413-422
    • Depuy, G.W.1    Whitehouse, G.E.2
  • 10
    • 0035250642 scopus 로고    scopus 로고
    • The definition of assembly line balancing difficulty and evaluation of balance solution quality
    • J. Driscoll D. Thilakawardana 2001 The definition of assembly line balancing difficulty and evaluation of balance solution quality Robotics and Computer Integrated Manufacturing 17 S81 86
    • (2001) Robotics and Computer Integrated Manufacturing , vol.17 , pp. 81-86
    • Driscoll, J.1    Thilakawardana, D.2
  • 11
    • 0032117097 scopus 로고    scopus 로고
    • A survey of the assembly line balancing procedures
    • E. Erel S.C. Sarin 1998 A survey of the assembly line balancing procedures Production Planning and Control 9 414 434
    • (1998) Production Planning and Control , vol.9 , pp. 414-434
    • Erel, E.1    Sarin, S.C.2
  • 12
    • 0000096392 scopus 로고
    • Measuring the technical efficiency of production
    • 1
    • R. Färe C.A. Knox Lovell 1978 Measuring the technical efficiency of production Journal of Economic Theory 19 1 150 162
    • (1978) Journal of Economic Theory , vol.19 , pp. 150-162
    • Färe, R.1    Knox Lovell, C.A.2
  • 16
    • 0032709489 scopus 로고    scopus 로고
    • Computing lower bounds by destructive improvement-An application to resource-constrained project scheduling
    • R. Klein A. Scholl 1999 Computing lower bounds by destructive improvement-An application to resource-constrained project scheduling European Journal of Operational Research 112 322 346
    • (1999) European Journal of Operational Research , vol.112 , pp. 322-346
    • Klein, R.1    Scholl, A.2
  • 18
    • 0033469223 scopus 로고    scopus 로고
    • Using simulation and data envelopment analysis to compare assembly line balancing solutions
    • P.R. McMullen G.V. Frazier 1998 Using simulation and data envelopment analysis to compare assembly line balancing solutions Journal of Productivity Analysis 11 149 168
    • (1998) Journal of Productivity Analysis , vol.11 , pp. 149-168
    • McMullen, P.R.1    Frazier, G.V.2
  • 19
    • 0002569892 scopus 로고
    • A heuristic method of assembly line balancing for assumptions of constant or variable work element times
    • C.L. Moodie H.H. Young 1965 A heuristic method of assembly line balancing for assumptions of constant or variable work element times Journal of Industrial Engineering 16 23 29
    • (1965) Journal of Industrial Engineering , vol.16 , pp. 23-29
    • Moodie, C.L.1    Young, H.H.2
  • 24
    • 25144482035 scopus 로고    scopus 로고
    • State-of-the-art exact and heuristic solution procedures for simple assembly line balancing
    • 3
    • A. Scholl C. Becker 2006 State-of-the-art exact and heuristic solution procedures for simple assembly line balancing European Journal of Operational Research 168 3 666 693
    • (2006) European Journal of Operational Research , vol.168 , pp. 666-693
    • Scholl, A.1    Becker, C.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.