메뉴 건너뛰기




Volumn 44, Issue 6, 2006, Pages 1171-1192

A rapid analysis method for production line design

Author keywords

Collaborative design; Conceptual design; Manual assembly line; Production line; Rapid analysis; Volume flexibility

Indexed keywords

COMPUTER AIDED SOFTWARE ENGINEERING; DATA REDUCTION; DECISION MAKING; PRODUCTION ENGINEERING; VIRTUAL REALITY;

EID: 32644454392     PISSN: 00207543     EISSN: None     Source Type: Journal    
DOI: 10.1080/00207540500336355     Document Type: Article
Times cited : (14)

References (26)
  • 2
    • 0031094483 scopus 로고    scopus 로고
    • Methods engineering: Using rapid prototype and virtual reality technique
    • Arzi, Y., Methods engineering: using rapid prototype and virtual reality technique. Human Factors & Ergon. in Manuf., 1997, 7, 79-95.
    • (1997) Human Factors & Ergon. in Manuf. , vol.7 , pp. 79-95
    • Arzi, Y.1
  • 3
    • 0037054881 scopus 로고    scopus 로고
    • Human performance modelling as an aid in the process of manufacturing system design: A pilot study
    • Baines, T.S. and Kay, J.M., Human performance modelling as an aid in the process of manufacturing system design: a pilot study. Int. J. Prod. Res., 2002, 40, 2321-2334.
    • (2002) Int. J. Prod. Res. , vol.40 , pp. 2321-2334
    • Baines, T.S.1    Kay, J.M.2
  • 4
    • 0036532809 scopus 로고    scopus 로고
    • The ergonomic design of work stations using virtual manufacturing and response surface methodology
    • Ben-Gal, I. and Rukchin, J., The ergonomic design of work stations using virtual manufacturing and response surface methodology. IIE Trans., 2002, 34, 375-391.
    • (2002) IIE Trans. , vol.34 , pp. 375-391
    • Ben-Gal, I.1    Rukchin, J.2
  • 5
    • 0030214201 scopus 로고    scopus 로고
    • Computer aided planning and design of manual assembly systems
    • Braun, W.J., Rebollar, R. and Schiller, E.F., Computer aided planning and design of manual assembly systems. Int. J. Prod. Res., 1996, 34, 2317-2333.
    • (1996) Int. J. Prod. Res. , vol.34 , pp. 2317-2333
    • Braun, W.J.1    Rebollar, R.2    Schiller, E.F.3
  • 6
    • 0036466886 scopus 로고    scopus 로고
    • Mixed model assembly line design in a make-to-order environment
    • Bukchin, J., Dar-El, E.M. and Rubinovitz, J., Mixed model assembly line design in a make-to-order environment. Computers & Indust. Eng., 2002, 41, 405-421.
    • (2002) Computers & Indust. Eng. , vol.41 , pp. 405-421
    • Bukchin, J.1    Dar-El, E.M.2    Rubinovitz, J.3
  • 7
    • 0034428117 scopus 로고    scopus 로고
    • Estimating the variance of production cost using a stochastic load model
    • Chiang, J.Y., Breipohl, A.M., Lee, F.N. and Adapa, R., Estimating the variance of production cost using a stochastic load model. IEEE Trans. Power Syst., 2000, 15, 1212-1217.
    • (2000) IEEE Trans. Power Syst. , vol.15 , pp. 1212-1217
    • Chiang, J.Y.1    Breipohl, A.M.2    Lee, F.N.3    Adapa, R.4
  • 8
    • 0034247308 scopus 로고    scopus 로고
    • A virtual reality-based experimentation environment for the verification of human-related factors in assembly processes
    • Chryssolouris, G., Mavrikios, D., Fragos, D. and Karabatsou, V., A virtual reality-based experimentation environment for the verification of human-related factors in assembly processes. Robotics & Computer Integ. Manuf., 2000, 16, 267-276.
    • (2000) Robotics & Computer Integ. Manuf. , vol.16 , pp. 267-276
    • Chryssolouris, G.1    Mavrikios, D.2    Fragos, D.3    Karabatsou, V.4
  • 9
    • 0344719184 scopus 로고    scopus 로고
    • Virtual reality as a tool for verification of assembly and maintenance processes
    • de Sa, A.G. and Zachmann, G., Virtual reality as a tool for verification of assembly and maintenance processes. Computers & Graphics, 1999, 23, 389-403.
    • (1999) Computers & Graphics , vol.23 , pp. 389-403
    • De Sa, A.G.1    Zachmann, G.2
  • 10
    • 0036778710 scopus 로고    scopus 로고
    • Optimal design of stochastic production lines: A dynamic programming approach
    • Donohue, K.L., Hopp, W.J. and Spearman, M.L., Optimal design of stochastic production lines: a dynamic programming approach. IIE Trans., 2002, 34, 891-903.
    • (2002) IIE Trans. , vol.34 , pp. 891-903
    • Donohue, K.L.1    Hopp, W.J.2    Spearman, M.L.3
  • 11
    • 0036498097 scopus 로고    scopus 로고
    • Optimal leadtimes planning in serial production systems with earliness and tardiness costs
    • Elhafsi, M., Optimal leadtimes planning in serial production systems with earliness and tardiness costs. IIE Trans., 2002, 34, 233-243.
    • (2002) IIE Trans. , vol.34 , pp. 233-243
    • Elhafsi, M.1
  • 12
    • 0036532881 scopus 로고    scopus 로고
    • Performance analysis and optimisation of cyclic production lines
    • Han, M.S. and Park, D.J., Performance analysis and optimisation of cyclic production lines. IIE Trans., 2002, 34, 411-422.
    • (2002) IIE Trans. , vol.34 , pp. 411-422
    • Han, M.S.1    Park, D.J.2
  • 13
    • 1642392310 scopus 로고    scopus 로고
    • Hybrid analytic and simulation models for assembly line design and production planning
    • Hsieh, S.J., Hybrid analytic and simulation models for assembly line design and production planning. Simul. Model. Prac. Theory, 2002, 10, 87-108.
    • (2002) Simul. Model. Prac. Theory , vol.10 , pp. 87-108
    • Hsieh, S.J.1
  • 14
    • 0035480396 scopus 로고    scopus 로고
    • A flexible simulation tool for manufacturing-cell design. I: Model structure, operation, and case study
    • Irisarry, M.D.L.A., Wilson, J.R. and Trevino, J., A flexible simulation tool for manufacturing-cell design. I: model structure, operation, and case study. IIE Trans., 2001, 33, 827-836.
    • (2001) IIE Trans. , vol.33 , pp. 827-836
    • Irisarry, M.D.L.A.1    Wilson, J.R.2    Trevino, J.3
  • 15
    • 0042323835 scopus 로고    scopus 로고
    • Virtual assembly using virtual reality techniques
    • Jayaram, S., Connacher, H.I. and Lyons, K.W., Virtual assembly using virtual reality techniques. CAD, 1997, 29, 575-584.
    • (1997) CAD , vol.29 , pp. 575-584
    • Jayaram, S.1    Connacher, H.I.2    Lyons, K.W.3
  • 16
    • 0036467014 scopus 로고    scopus 로고
    • A knowledge based design methodology for manufacturing assembly lines
    • Khan, A. and Day, A.J., A knowledge based design methodology for manufacturing assembly lines. Computers & Indust. Eng., 2002, 41, 441-467.
    • (2002) Computers & Indust. Eng. , vol.41 , pp. 441-467
    • Khan, A.1    Day, A.J.2
  • 17
    • 0035400547 scopus 로고    scopus 로고
    • Design of collaboration framework for distributed CIM data activities
    • Kim, C.O. and Nof, S.Y., Design of collaboration framework for distributed CIM data activities. IIE Trans., 2001, 33, 535-546.
    • (2001) IIE Trans. , vol.33 , pp. 535-546
    • Kim, C.O.1    Nof, S.Y.2
  • 18
    • 0037053052 scopus 로고    scopus 로고
    • Modular simulation tool for modelling JIT manufacturing
    • Martinez, F.M. and Bedia, L.M.A., Modular simulation tool for modelling JIT manufacturing. Int. J. Prod. Res., 2002, 40, 1529-1547.
    • (2002) Int. J. Prod. Res. , vol.40 , pp. 1529-1547
    • Martinez, F.M.1    Bedia, L.M.A.2
  • 19
    • 0028531312 scopus 로고
    • The U-line line balancing problem
    • Miltenburg, G.J. and Wijingaard, J., The U-line line balancing problem. Manage. Sci., 1994, 40, 1378-1388.
    • (1994) Manage. Sci. , vol.40 , pp. 1378-1388
    • Miltenburg, G.J.1    Wijingaard, J.2
  • 21
    • 3543052335 scopus 로고
    • JIT Quality matrices for strategic planning and implementation
    • Prasad, B., JIT Quality matrices for strategic planning and implementation. Int. J. Op. & Prod. Manage., 1995, 15, 116-142.
    • (1995) Int. J. Op. & Prod. Manage , vol.15 , pp. 116-142
    • Prasad, B.1
  • 25
    • 14044264303 scopus 로고    scopus 로고
    • Factory planning - Round the table
    • 1.2000, Fraunhofer Gesellschaft
    • Weiner, M., Factory planning - round the table. Fraunhofer Magazine, 1.2000, Fraunhofer Gesellschaft, 2000, 38-39.
    • (2000) Fraunhofer Magazine , pp. 38-39
    • Weiner, M.1
  • 26
    • 0036165350 scopus 로고    scopus 로고
    • Concurrent process planning and scheduling in distributed virtual manufacturing
    • Wu, S.H., Fuh, J.Y.H. and Nee, A.Y.C., Concurrent process planning and scheduling in distributed virtual manufacturing. IIE Trans., 2002, 34, 77-89.
    • (2002) IIE Trans. , vol.34 , pp. 77-89
    • Wu, S.H.1    Fuh, J.Y.H.2    Nee, A.Y.C.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.