-
2
-
-
0031094483
-
Methods engineering: Using rapid prototype and virtual reality technique
-
Arzi, Y., Methods engineering: using rapid prototype and virtual reality technique. Human Factors & Ergon. in Manuf., 1997, 7, 79-95.
-
(1997)
Human Factors & Ergon. in Manuf.
, vol.7
, pp. 79-95
-
-
Arzi, Y.1
-
3
-
-
0037054881
-
Human performance modelling as an aid in the process of manufacturing system design: A pilot study
-
Baines, T.S. and Kay, J.M., Human performance modelling as an aid in the process of manufacturing system design: a pilot study. Int. J. Prod. Res., 2002, 40, 2321-2334.
-
(2002)
Int. J. Prod. Res.
, vol.40
, pp. 2321-2334
-
-
Baines, T.S.1
Kay, J.M.2
-
4
-
-
0036532809
-
The ergonomic design of work stations using virtual manufacturing and response surface methodology
-
Ben-Gal, I. and Rukchin, J., The ergonomic design of work stations using virtual manufacturing and response surface methodology. IIE Trans., 2002, 34, 375-391.
-
(2002)
IIE Trans.
, vol.34
, pp. 375-391
-
-
Ben-Gal, I.1
Rukchin, J.2
-
5
-
-
0030214201
-
Computer aided planning and design of manual assembly systems
-
Braun, W.J., Rebollar, R. and Schiller, E.F., Computer aided planning and design of manual assembly systems. Int. J. Prod. Res., 1996, 34, 2317-2333.
-
(1996)
Int. J. Prod. Res.
, vol.34
, pp. 2317-2333
-
-
Braun, W.J.1
Rebollar, R.2
Schiller, E.F.3
-
6
-
-
0036466886
-
Mixed model assembly line design in a make-to-order environment
-
Bukchin, J., Dar-El, E.M. and Rubinovitz, J., Mixed model assembly line design in a make-to-order environment. Computers & Indust. Eng., 2002, 41, 405-421.
-
(2002)
Computers & Indust. Eng.
, vol.41
, pp. 405-421
-
-
Bukchin, J.1
Dar-El, E.M.2
Rubinovitz, J.3
-
7
-
-
0034428117
-
Estimating the variance of production cost using a stochastic load model
-
Chiang, J.Y., Breipohl, A.M., Lee, F.N. and Adapa, R., Estimating the variance of production cost using a stochastic load model. IEEE Trans. Power Syst., 2000, 15, 1212-1217.
-
(2000)
IEEE Trans. Power Syst.
, vol.15
, pp. 1212-1217
-
-
Chiang, J.Y.1
Breipohl, A.M.2
Lee, F.N.3
Adapa, R.4
-
8
-
-
0034247308
-
A virtual reality-based experimentation environment for the verification of human-related factors in assembly processes
-
Chryssolouris, G., Mavrikios, D., Fragos, D. and Karabatsou, V., A virtual reality-based experimentation environment for the verification of human-related factors in assembly processes. Robotics & Computer Integ. Manuf., 2000, 16, 267-276.
-
(2000)
Robotics & Computer Integ. Manuf.
, vol.16
, pp. 267-276
-
-
Chryssolouris, G.1
Mavrikios, D.2
Fragos, D.3
Karabatsou, V.4
-
9
-
-
0344719184
-
Virtual reality as a tool for verification of assembly and maintenance processes
-
de Sa, A.G. and Zachmann, G., Virtual reality as a tool for verification of assembly and maintenance processes. Computers & Graphics, 1999, 23, 389-403.
-
(1999)
Computers & Graphics
, vol.23
, pp. 389-403
-
-
De Sa, A.G.1
Zachmann, G.2
-
10
-
-
0036778710
-
Optimal design of stochastic production lines: A dynamic programming approach
-
Donohue, K.L., Hopp, W.J. and Spearman, M.L., Optimal design of stochastic production lines: a dynamic programming approach. IIE Trans., 2002, 34, 891-903.
-
(2002)
IIE Trans.
, vol.34
, pp. 891-903
-
-
Donohue, K.L.1
Hopp, W.J.2
Spearman, M.L.3
-
11
-
-
0036498097
-
Optimal leadtimes planning in serial production systems with earliness and tardiness costs
-
Elhafsi, M., Optimal leadtimes planning in serial production systems with earliness and tardiness costs. IIE Trans., 2002, 34, 233-243.
-
(2002)
IIE Trans.
, vol.34
, pp. 233-243
-
-
Elhafsi, M.1
-
12
-
-
0036532881
-
Performance analysis and optimisation of cyclic production lines
-
Han, M.S. and Park, D.J., Performance analysis and optimisation of cyclic production lines. IIE Trans., 2002, 34, 411-422.
-
(2002)
IIE Trans.
, vol.34
, pp. 411-422
-
-
Han, M.S.1
Park, D.J.2
-
13
-
-
1642392310
-
Hybrid analytic and simulation models for assembly line design and production planning
-
Hsieh, S.J., Hybrid analytic and simulation models for assembly line design and production planning. Simul. Model. Prac. Theory, 2002, 10, 87-108.
-
(2002)
Simul. Model. Prac. Theory
, vol.10
, pp. 87-108
-
-
Hsieh, S.J.1
-
14
-
-
0035480396
-
A flexible simulation tool for manufacturing-cell design. I: Model structure, operation, and case study
-
Irisarry, M.D.L.A., Wilson, J.R. and Trevino, J., A flexible simulation tool for manufacturing-cell design. I: model structure, operation, and case study. IIE Trans., 2001, 33, 827-836.
-
(2001)
IIE Trans.
, vol.33
, pp. 827-836
-
-
Irisarry, M.D.L.A.1
Wilson, J.R.2
Trevino, J.3
-
15
-
-
0042323835
-
Virtual assembly using virtual reality techniques
-
Jayaram, S., Connacher, H.I. and Lyons, K.W., Virtual assembly using virtual reality techniques. CAD, 1997, 29, 575-584.
-
(1997)
CAD
, vol.29
, pp. 575-584
-
-
Jayaram, S.1
Connacher, H.I.2
Lyons, K.W.3
-
16
-
-
0036467014
-
A knowledge based design methodology for manufacturing assembly lines
-
Khan, A. and Day, A.J., A knowledge based design methodology for manufacturing assembly lines. Computers & Indust. Eng., 2002, 41, 441-467.
-
(2002)
Computers & Indust. Eng.
, vol.41
, pp. 441-467
-
-
Khan, A.1
Day, A.J.2
-
17
-
-
0035400547
-
Design of collaboration framework for distributed CIM data activities
-
Kim, C.O. and Nof, S.Y., Design of collaboration framework for distributed CIM data activities. IIE Trans., 2001, 33, 535-546.
-
(2001)
IIE Trans.
, vol.33
, pp. 535-546
-
-
Kim, C.O.1
Nof, S.Y.2
-
18
-
-
0037053052
-
Modular simulation tool for modelling JIT manufacturing
-
Martinez, F.M. and Bedia, L.M.A., Modular simulation tool for modelling JIT manufacturing. Int. J. Prod. Res., 2002, 40, 1529-1547.
-
(2002)
Int. J. Prod. Res.
, vol.40
, pp. 1529-1547
-
-
Martinez, F.M.1
Bedia, L.M.A.2
-
19
-
-
0028531312
-
The U-line line balancing problem
-
Miltenburg, G.J. and Wijingaard, J., The U-line line balancing problem. Manage. Sci., 1994, 40, 1378-1388.
-
(1994)
Manage. Sci.
, vol.40
, pp. 1378-1388
-
-
Miltenburg, G.J.1
Wijingaard, J.2
-
20
-
-
80051939808
-
First order analysis for automotive body structure design
-
DETC2000/DAC-14533
-
Nishigaki, H., Nishiwaki, S., Amago, T. and Kikuchi, N., First order analysis for automotive body structure design, in Proceedings of DETC2000, ASME 2000 Design Engineering Technical Conferences and Computers and Information in Engineering Conference, DETC2000/DAC-14533, 2000.
-
(2000)
Proceedings of DETC2000, ASME 2000 Design Engineering Technical Conferences and Computers and Information in Engineering Conference
-
-
Nishigaki, H.1
Nishiwaki, S.2
Amago, T.3
Kikuchi, N.4
-
21
-
-
3543052335
-
JIT Quality matrices for strategic planning and implementation
-
Prasad, B., JIT Quality matrices for strategic planning and implementation. Int. J. Op. & Prod. Manage., 1995, 15, 116-142.
-
(1995)
Int. J. Op. & Prod. Manage
, vol.15
, pp. 116-142
-
-
Prasad, B.1
-
24
-
-
34248539177
-
Flexibility manufacturing: A survey
-
Sethi, A.K. and Sethi, S.P., Flexibility manufacturing: a survey. Int. J. Flexible Manuf. Syst., 1990, 2, 289-328.
-
(1990)
Int. J. Flexible Manuf. Syst.
, vol.2
, pp. 289-328
-
-
Sethi, A.K.1
Sethi, S.P.2
-
25
-
-
14044264303
-
Factory planning - Round the table
-
1.2000, Fraunhofer Gesellschaft
-
Weiner, M., Factory planning - round the table. Fraunhofer Magazine, 1.2000, Fraunhofer Gesellschaft, 2000, 38-39.
-
(2000)
Fraunhofer Magazine
, pp. 38-39
-
-
Weiner, M.1
-
26
-
-
0036165350
-
Concurrent process planning and scheduling in distributed virtual manufacturing
-
Wu, S.H., Fuh, J.Y.H. and Nee, A.Y.C., Concurrent process planning and scheduling in distributed virtual manufacturing. IIE Trans., 2002, 34, 77-89.
-
(2002)
IIE Trans.
, vol.34
, pp. 77-89
-
-
Wu, S.H.1
Fuh, J.Y.H.2
Nee, A.Y.C.3
|