Work structuring to achieve integrated product-process design

Author keywords

Constructability; Design build; Fabrication; Installation; Lean construction; Tolerances

Indexed keywords

CONSTRUCTABILITY; DESIGN/BUILD; LEAN CONSTRUCTION; TRADE BOUNDARIES;

EID: 13944269909     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0733-9364(2004)130:6(780)     Document Type: Article
Times cited : (68)

References (47)
  • 1
    • 2342442617 scopus 로고    scopus 로고
    • Owner/contractor work structure process handbook
    • Construction Industry Institute, Austin, Tex.
    • Anderson, S. D. (1997). "Owner/contractor work structure process handbook." Implementation Resource 111-2, Construction Industry Institute, Austin, Tex.
    • (1997) Implementation Resource , vol.111 , Issue.2
    • Anderson, S.D.1
  • 2
    • 12244292489 scopus 로고    scopus 로고
    • Work structuring
    • Lean Construction Institute, Ketchum, Id (12 June)
    • Ballard, G. (1999). "Work structuring." White Paper-5, Lean Construction Institute, Ketchum, Id., 〈http://www.leanconstruction.org/pdf/ WP5-WorkStructuring.pdf〉 (12 June).
    • (1999) White Paper-5
    • Ballard, G.1
  • 3
    • 3242716315 scopus 로고    scopus 로고
    • Lean project delivery system
    • Lean Construction Institute, Ketchum, Id (23 Sept)
    • Ballard, G. (2000). "Lean project delivery system." White Paper-8 (Revision 1), Lean Construction Institute, Ketchum, Id., 〈http://www.leanconstruction.org/pdf/WP8-LPDS.pdf〉 (23 Sept).
    • (2000) White Paper-8 (Revision 1)
    • Ballard, G.1
  • 4
    • 84856637562 scopus 로고    scopus 로고
    • Production system design: Work structuring revisited
    • Lean Construction Institute, Ketchum, Id
    • Ballard, G., Koskela, L., Howell, G., and Zabelle, T. (2001). "Production system design: Work structuring revisited." White Paper-11, Lean Construction Institute, Ketchum, Id.
    • (2001) White Paper-11
    • Ballard, G.1    Koskela, L.2    Howell, G.3    Zabelle, T.4
  • 5
    • 24944578131 scopus 로고    scopus 로고
    • Project delivery systems: CM at risk, design-build, design-bid-build
    • Construction Industry Institute, Austin, Tex.
    • Champagne, A. F. (1997). "Project delivery systems: CM at risk, design-build, design-bid-build." Research Summary 133-1, Construction Industry Institute, Austin, Tex.
    • (1997) Research Summary , vol.133 , Issue.1
    • Champagne, A.F.1
  • 6
    • 1442336458 scopus 로고    scopus 로고
    • UNIFORMAT II: Elemental classification for building specifications, cost estimating, and cost analysis
    • NIST, Gaithersburg, Md.
    • Charette, R. P., and Marshall, H. E. (1999). "UNIFORMAT II: Elemental classification for building specifications, cost estimating, and cost analysis." Natl. Inst. of Standards and Technology Internal Rep. (NISTIR) No. 6389, NIST, Gaithersburg, Md.
    • (1999) Natl. Inst. of Standards and Technology Internal Rep. (NISTIR) No. 6389 , vol.6389
    • Charette, R.P.1    Marshall, H.E.2
  • 7
    • 0043124559 scopus 로고
    • Office of Secretary of DOD and NASA, Washington, D.C.
    • Dept. of Defense-Natl. Aeronautics and Space Administration (DOD-NASA). (1962). DOD and NASA guide to PERT/COST systems design. Office of Secretary of DOD and NASA, Washington, D.C.
    • (1962) DOD and NASA Guide to PERT/COST Systems Design
  • 8
    • 84860087711 scopus 로고    scopus 로고
    • U.S. Department of Justice, Washington, D.C. (7 Aug)
    • Dept. of Justice (DOJ). (1997). "Prison construction: keeping pace with population growth." U.S. Department of Justice, Washington, D.C., 〈http://www.ojp.usdoj.gov/bjs/pub/press/csfcf95.pr〉 (7 Aug).
    • (1997) Prison Construction: Keeping Pace with Population Growth
  • 11
    • 84860087587 scopus 로고    scopus 로고
    • Top 400 contractors
    • New York (Nov. 25)
    • Engineering News Record (ENR). (2002). "Top 400 contractors." Engineering News Record, New York, 〈http://enr.construction.com/people/ topLists/topContractor/topCont_A-Z.asp〉 (Nov. 25).
    • (2002) Engineering News Record
  • 13
    • 84860083186 scopus 로고    scopus 로고
    • Contribution of specialty contractor knowledge to early design
    • Univ.of Sussex, Brighton, U.K. (Nov. 25, 2002)
    • Gil, N., Tommelein, I. D., Kirkendall, B., and Ballard, G. (2000). "Contribution of specialty contractor knowledge to early design." Proc., 8th Annual Conf. Int'l. Group for Lean Constr., Univ.of Sussex, Brighton, U.K. 〈http://www.ce.berkeley.edu/~tommelein/IGLC8-GilEtAl.pdf〉 (Nov. 25, 2002).
    • (2000) Proc., 8th Annual Conf. Int'l. Group for Lean Constr.
    • Gil, N.1    Tommelein, I.D.2    Kirkendall, B.3    Ballard, G.4
  • 14
    • 6644224836 scopus 로고
    • Work packaging for project control management
    • Construction Industry Institute, Austin, Tex.
    • Halpin, D. W., Escalona, A. L., and Szmurlo, P. M. (1987). "Work packaging for project control management." Source Document 28, Construction Industry Institute, Austin, Tex.
    • (1987) Source Document , vol.28
    • Halpin, D.W.1    Escalona, A.L.2    Szmurlo, P.M.3
  • 15
    • 13944271169 scopus 로고
    • Work structuring in automated manufacturing systems exemplified by use of industrial robots for body assembly
    • Pergamon, Oxford
    • Heizmann, J. (1983). "Work structuring in automated manufacturing systems exemplified by use of industrial robots for body assembly." Design of Work in Automated Manufacturing Systems, Pergamon, Oxford, 109-114.
    • (1983) Design of Work in Automated Manufacturing Systems , pp. 109-114
    • Heizmann, J.1
  • 16
    • 3242706356 scopus 로고    scopus 로고
    • Design of construction operations
    • Lean Construction Institute (Jan. 9)
    • Howell, G., and Ballard, G. (1999). "Design of construction operations." White Paper-4, Lean Construction Institute, 〈http://www.leanconstruction.org/pdf/WP4-OperationsDesign.pdf〉 (Jan. 9).
    • (1999) White Paper-4
    • Howell, G.1    Ballard, G.2
  • 17
    • 0027805668 scopus 로고
    • Interaction between subcycles: One key to improved methods
    • Howell, G., Laufer, A., and Ballard, G. (1993). "Interaction between subcycles: One key to improved methods." J. Constr. Eng. Manage., 119(4), 714-728.
    • (1993) J. Constr. Eng. Manage. , vol.119 , Issue.4 , pp. 714-728
    • Howell, G.1    Laufer, A.2    Ballard, G.3
  • 18
    • 0015025314 scopus 로고
    • A profile of the future construction system
    • Kellogg, J. C. (1971). "A profile of the future construction system." J. Constr. Div., Am. Soc. Civ. Eng., 97(C01), 147-161.
    • (1971) J. Constr. Div., Am. Soc. Civ. Eng. , vol.97 , Issue.C01 , pp. 147-161
    • Kellogg, J.C.1
  • 19
    • 84860089993 scopus 로고    scopus 로고
    • Model GP-2HD hand operated grout pump: Ideal for grouting metal door frames
    • Nov. 25
    • Kenrich Products. (2002). "Model GP-2HD hand operated grout pump: Ideal for grouting metal door frames." Kenrich Products webpage, 〈http://www.kenrichproducts.com/ModelGP2HD.html〉 (Nov. 25).
    • (2002) Kenrich Products Webpage
  • 20
    • 0032207592 scopus 로고    scopus 로고
    • Comparison of U.S. project delivery systems
    • Konchar, M., and Sanvido, V. (1998). "Comparison of U.S. project delivery systems." J. Constr. Eng. Manage., 124(6), 435-444.
    • (1998) J. Constr. Eng. Manage. , vol.124 , Issue.6 , pp. 435-444
    • Konchar, M.1    Sanvido, V.2
  • 22
    • 84860091632 scopus 로고    scopus 로고
    • Implementable research: A prerequisite for implementation of research results
    • Construction Industry Institute and Natl. Science Foundation, Austin, Tex.
    • Laufer, A. (1997). "Implementable research: A prerequisite for implementation of research results." Proc., "How do we do research to improve the engineering and construction industry" workshop, Construction Industry Institute and Natl. Science Foundation, Austin, Tex.
    • (1997) Proc., "How Do We Do Research to Improve the Engineering and Construction Industry" Workshop
    • Laufer, A.1
  • 24
    • 84860082459 scopus 로고    scopus 로고
    • CSI reverses course on proposed revision to Masterformat
    • Nov. 24
    • Mechanical Contractors Association of America (MCAA). (2003). "CSI reverses course on proposed revision to Masterformat." The MCAA National Update, 〈http://www.mcaa.org/update/archives/nul12403.cfm〉 (Nov. 24).
    • (2003) The MCAA National Update
  • 25
    • 0032119946 scopus 로고    scopus 로고
    • Building operations management theory through case and field research
    • Meredith, J. (1998). "Building operations management theory through case and field research." J. Operations Manage., 16(4), 441-454.
    • (1998) J. Operations Manage. , vol.16 , Issue.4 , pp. 441-454
    • Meredith, J.1
  • 26
    • 84860082352 scopus 로고    scopus 로고
    • Top design firms ranked by total billings for projects completed in Illinois, Indiana, and Wisconsin
    • McGraw-Hill, Chicago; (Nov. 25)
    • Midwest Construction. (2002). "Top design firms ranked by total billings for projects completed in Illinois, Indiana, and Wisconsin." Midwest Construction website, McGraw-Hill, Chicago, 〈http://midwest. construction.com/people/toplists/02_TopDesignFirms.pdf〉 (Nov. 25).
    • (2002) Midwest Construction Website
  • 27
    • 2342420277 scopus 로고    scopus 로고
    • Role of tolerances and process capability data in product and process design integration
    • ASCE, Reston, Va.; (Oct. 12)
    • Milberg, C. and Tommelein, I. D. (2003). "Role of tolerances and process capability data in product and process design integration," Proc., Construction Research Congress, ASCE, Reston, Va., 〈http://www.ce.berkeley. edu/~tommelein/papers/CRC03-Milberg&Tommelein-40671-011-004.pdf〉 (Oct. 12).
    • (2003) Proc., Construction Research Congress
    • Milberg, C.1    Tommelein, I.D.2
  • 28
    • 84860092275 scopus 로고    scopus 로고
    • Alliance lean design/construct on a small high tech project
    • Nov. 25, 2002
    • Miles, R. S. (1998). "Alliance lean design/construct on a small high tech project." Proc., 6th Annual Conf. Intl. Group for Lean Construction,http://www.ce.berkeley.edu/~tommelein/IGLC-6/Miles.pdf〉 (Nov. 25, 2002).
    • (1998) Proc., 6th Annual Conf. Intl. Group for Lean Construction
    • Miles, R.S.1
  • 29
    • 0032208060 scopus 로고    scopus 로고
    • Model for public sector design-build project selection
    • Molenaar, K. R. and Songer, A. D. (1998). "Model for public sector design-build project selection." J. Constr. Eng. Manage., 124(6), 467-479.
    • (1998) J. Constr. Eng. Manage. , vol.124 , Issue.6 , pp. 467-479
    • Molenaar, K.R.1    Songer, A.D.2
  • 30
    • 0009353362 scopus 로고
    • Publication 6-6, Construction Industry Institute, Austin, Tex.
    • Nell, J. (1988). "Work packaging for project control." Publication 6-6, Construction Industry Institute, Austin, Tex.
    • (1988) Work Packaging for Project Control
    • Nell, J.1
  • 33
    • 0017135463 scopus 로고
    • Designing to reduce construction costs
    • Paulson, B. C. (1976). "Designing to reduce construction costs." J. Constr. Div., Am. Soc. Civ. Eng., 102(C04), 587-592.
    • (1976) J. Constr. Div., Am. Soc. Civ. Eng. , vol.102 , Issue.C04 , pp. 587-592
    • Paulson, B.C.1
  • 35
    • 0010075840 scopus 로고    scopus 로고
    • Project delivery systems: CM at risk, design-build, and design-bid-build
    • Construction Industry Institute, Austin, Tex.
    • Sanvido, V. E., and Konchar, M. D. (1998). "Project delivery systems: CM at risk, design-build, and design-bid-build." Research Rep. No. 133, Construction Industry Institute, Austin, Tex.
    • (1998) Research Rep. No. 133 , vol.133
    • Sanvido, V.E.1    Konchar, M.D.2
  • 37
    • 84860077594 scopus 로고    scopus 로고
    • Daily Reporter Publishing Co., Milwaukee (Nov. 25, 2002)
    • Schultz, S. (2000a). "Top educators say defining design/build is all academic." Daily Reporter Publishing Co., Milwaukee, 〈http://www. dailyreporter.com/special/db/educate.html〉 (Nov. 25, 2002).
    • (2000) Top Educators Say Defining Design/build Is All Academic
    • Schultz, S.1
  • 39
    • 0027658817 scopus 로고
    • Builders as sources of construction innovation
    • Slaughter, E. S. (1993). "Builders as sources of construction innovation." J. Constr. Eng. Manage., 119(3), 532-549.
    • (1993) J. Constr. Eng. Manage. , vol.119 , Issue.3 , pp. 532-549
    • Slaughter, E.S.1
  • 42
    • 13944261370 scopus 로고    scopus 로고
    • Coordinating specialists
    • Constr. Engrg. Mgmt. Prog., Dept. of Civil and Environmental Engineering, Univ. of Calif., Berkeley, Calif.
    • Tommelein, I. D., and Ballard, G. (1997). "Coordinating specialists." Technical Rep. No. 97-8, Constr. Engrg. Mgmt. Prog., Dept. of Civil and Environmental Engineering, Univ. of Calif., Berkeley, Calif.
    • (1997) Technical Rep. No. 97-8 , vol.97 , Issue.8
    • Tommelein, I.D.1    Ballard, G.2
  • 43
    • 0032645520 scopus 로고    scopus 로고
    • Parade game: Impact of work flow variability on trade performance
    • Tommelein, I. D., Riley, D., and Howell, G. A. (1999). "Parade game: Impact of work flow variability on trade performance." J. Constr. Eng. Manage., 125(5), 304-310.
    • (1999) J. Constr. Eng. Manage. , vol.125 , Issue.5 , pp. 304-310
    • Tommelein, I.D.1    Riley, D.2    Howell, G.A.3
  • 44
    • 27144450471 scopus 로고    scopus 로고
    • Improving capital projects supply chain performance
    • Construction Industry Institute, Austin, Tex.
    • Tommelein, I. D., Walsh, K. D., and Hershauer, J. C. (2003). "Improving capital projects supply chain performance." Research Rep. PT172-11, Construction Industry Institute, Austin, Tex.
    • (2003) Research Rep. , vol.PT172-11
    • Tommelein, I.D.1    Walsh, K.D.2    Hershauer, J.C.3
  • 45
    • 69949094691 scopus 로고    scopus 로고
    • Case study for work structuring: Installation of metal door frames
    • Univ. of Sussex, Brighton, UK. (Nov. 25, 2002)
    • Tsao, C. C. Y., Tommelein, I. D., Swanlund, E., and Howell, G. A. (2000a). "Case study for work structuring: Installation of metal door frames." Proc., 8th Conf., Int. Group Lean Constr., Univ. of Sussex, Brighton, UK., 〈http://www.ce.berkeley.edu/~tornmelein/IGLC8-TsaoEtAl.pdf) (Nov. 25, 2002).
    • (2000) Proc., 8th Conf., Int. Group Lean Constr.
    • Tsao, C.C.Y.1    Tommelein, I.D.2    Swanlund, E.3    Howell, G.A.4
  • 46
    • 13944283475 scopus 로고    scopus 로고
    • Towards work structuring: Five whys applied to installation of metal door frames
    • Constr. Engrg. Mgmt. Prog., Dept. of Civil and Environmental Engineering, Univ. of California, Berkeley, Calif.
    • Tsao, C. C. Y., Tommelein, I. D., Swanlund, E., and Howell, G. A. (2000b). "Towards work structuring: Five whys applied to installation of metal door frames." Technical Rep. No. 2000-03, Constr. Engrg. Mgmt. Prog., Dept. of Civil and Environmental Engineering, Univ. of California, Berkeley, Calif.
    • (2000) Technical Rep. No. 2000-03 , vol.2000 , Issue.3
    • Tsao, C.C.Y.1    Tommelein, I.D.2    Swanlund, E.3    Howell, G.A.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.