Owner/contractor work structure process handbook
-
Construction Industry Institute, Austin, Tex.
-
Anderson, S. D. (1997). "Owner/contractor work structure process handbook." Implementation Resource 111-2, Construction Industry Institute, Austin, Tex.
-
(1997)
Implementation Resource
, vol.111
, Issue.2
-
-
Anderson, S.D.1
-
2
-
-
12244292489
-
Work structuring
-
Lean Construction Institute, Ketchum, Id (12 June)
-
Ballard, G. (1999). "Work structuring." White Paper-5, Lean Construction Institute, Ketchum, Id., 〈http://www.leanconstruction.org/pdf/ WP5-WorkStructuring.pdf〉 (12 June).
-
(1999)
White Paper-5
-
-
Ballard, G.1
-
3
-
-
3242716315
-
Lean project delivery system
-
Lean Construction Institute, Ketchum, Id (23 Sept)
-
Ballard, G. (2000). "Lean project delivery system." White Paper-8 (Revision 1), Lean Construction Institute, Ketchum, Id., 〈http://www.leanconstruction.org/pdf/WP8-LPDS.pdf〉 (23 Sept).
-
(2000)
White Paper-8 (Revision 1)
-
-
Ballard, G.1
-
4
-
-
84856637562
-
Production system design: Work structuring revisited
-
Lean Construction Institute, Ketchum, Id
-
Ballard, G., Koskela, L., Howell, G., and Zabelle, T. (2001). "Production system design: Work structuring revisited." White Paper-11, Lean Construction Institute, Ketchum, Id.
-
(2001)
White Paper-11
-
-
Ballard, G.1
Koskela, L.2
Howell, G.3
Zabelle, T.4
-
5
-
-
24944578131
-
Project delivery systems: CM at risk, design-build, design-bid-build
-
Construction Industry Institute, Austin, Tex.
-
Champagne, A. F. (1997). "Project delivery systems: CM at risk, design-build, design-bid-build." Research Summary 133-1, Construction Industry Institute, Austin, Tex.
-
(1997)
Research Summary
, vol.133
, Issue.1
-
-
Champagne, A.F.1
-
6
-
-
1442336458
-
UNIFORMAT II: Elemental classification for building specifications, cost estimating, and cost analysis
-
NIST, Gaithersburg, Md.
-
Charette, R. P., and Marshall, H. E. (1999). "UNIFORMAT II: Elemental classification for building specifications, cost estimating, and cost analysis." Natl. Inst. of Standards and Technology Internal Rep. (NISTIR) No. 6389, NIST, Gaithersburg, Md.
-
(1999)
Natl. Inst. of Standards and Technology Internal Rep. (NISTIR) No. 6389
, vol.6389
-
-
Charette, R.P.1
Marshall, H.E.2
-
7
-
-
0043124559
-
-
Office of Secretary of DOD and NASA, Washington, D.C.
-
Dept. of Defense-Natl. Aeronautics and Space Administration (DOD-NASA). (1962). DOD and NASA guide to PERT/COST systems design. Office of Secretary of DOD and NASA, Washington, D.C.
-
(1962)
DOD and NASA Guide to PERT/COST Systems Design
-
-
-
8
-
-
84860087711
-
-
U.S. Department of Justice, Washington, D.C. (7 Aug)
-
Dept. of Justice (DOJ). (1997). "Prison construction: keeping pace with population growth." U.S. Department of Justice, Washington, D.C., 〈http://www.ojp.usdoj.gov/bjs/pub/press/csfcf95.pr〉 (7 Aug).
-
(1997)
Prison Construction: Keeping Pace with Population Growth
-
-
-
9
-
-
84860089948
-
-
Daily Reporter Publishing Company, Milwaukee (Nov. 25, 2002)
-
Doyle, C. (2000a). "Where, oh where? Would-be, public-sector design/build customers say they wouldn't rush to limited bidding." Daily Reporter Publishing Company, Milwaukee, 〈http://dailyreporter.com/special/ db/where.html〉 (Nov. 25, 2002).
-
(2000)
Where, Oh Where? Would-be, Public-sector Design/build Customers Say They Wouldn't Rush to Limited Bidding
-
-
Doyle, C.1
-
11
-
-
84860087587
-
Top 400 contractors
-
New York (Nov. 25)
-
Engineering News Record (ENR). (2002). "Top 400 contractors." Engineering News Record, New York, 〈http://enr.construction.com/people/ topLists/topContractor/topCont_A-Z.asp〉 (Nov. 25).
-
(2002)
Engineering News Record
-
-
-
12
-
-
13944253430
-
MNL-117-96, Division 7-product tolerances
-
Precast/Prestressed Concrete Institute, Chicago
-
Freedman, S. (1996). "MNL-117-96, Division 7-Product tolerances." Manual for quality control for plants and production of architectural precast concrete products, 3rd Ed., Precast/Prestressed Concrete Institute, Chicago, 159-166.
-
(1996)
Manual for Quality Control for Plants and Production of Architectural Precast Concrete Products, 3rd Ed.
, pp. 159-166
-
-
Freedman, S.1
-
13
-
-
84860083186
-
Contribution of specialty contractor knowledge to early design
-
Univ.of Sussex, Brighton, U.K. (Nov. 25, 2002)
-
Gil, N., Tommelein, I. D., Kirkendall, B., and Ballard, G. (2000). "Contribution of specialty contractor knowledge to early design." Proc., 8th Annual Conf. Int'l. Group for Lean Constr., Univ.of Sussex, Brighton, U.K. 〈http://www.ce.berkeley.edu/~tommelein/IGLC8-GilEtAl.pdf〉 (Nov. 25, 2002).
-
(2000)
Proc., 8th Annual Conf. Int'l. Group for Lean Constr.
-
-
Gil, N.1
Tommelein, I.D.2
Kirkendall, B.3
Ballard, G.4
-
14
-
-
6644224836
-
Work packaging for project control management
-
Construction Industry Institute, Austin, Tex.
-
Halpin, D. W., Escalona, A. L., and Szmurlo, P. M. (1987). "Work packaging for project control management." Source Document 28, Construction Industry Institute, Austin, Tex.
-
(1987)
Source Document
, vol.28
-
-
Halpin, D.W.1
Escalona, A.L.2
Szmurlo, P.M.3
-
15
-
-
13944271169
-
Work structuring in automated manufacturing systems exemplified by use of industrial robots for body assembly
-
Pergamon, Oxford
-
Heizmann, J. (1983). "Work structuring in automated manufacturing systems exemplified by use of industrial robots for body assembly." Design of Work in Automated Manufacturing Systems, Pergamon, Oxford, 109-114.
-
(1983)
Design of Work in Automated Manufacturing Systems
, pp. 109-114
-
-
Heizmann, J.1
-
16
-
-
3242706356
-
Design of construction operations
-
Lean Construction Institute (Jan. 9)
-
Howell, G., and Ballard, G. (1999). "Design of construction operations." White Paper-4, Lean Construction Institute, 〈http://www.leanconstruction.org/pdf/WP4-OperationsDesign.pdf〉 (Jan. 9).
-
(1999)
White Paper-4
-
-
Howell, G.1
Ballard, G.2
-
17
-
-
0027805668
-
Interaction between subcycles: One key to improved methods
-
Howell, G., Laufer, A., and Ballard, G. (1993). "Interaction between subcycles: One key to improved methods." J. Constr. Eng. Manage., 119(4), 714-728.
-
(1993)
J. Constr. Eng. Manage.
, vol.119
, Issue.4
, pp. 714-728
-
-
Howell, G.1
Laufer, A.2
Ballard, G.3
-
18
-
-
0015025314
-
A profile of the future construction system
-
Kellogg, J. C. (1971). "A profile of the future construction system." J. Constr. Div., Am. Soc. Civ. Eng., 97(C01), 147-161.
-
(1971)
J. Constr. Div., Am. Soc. Civ. Eng.
, vol.97
, Issue.C01
, pp. 147-161
-
-
Kellogg, J.C.1
-
19
-
-
84860089993
-
Model GP-2HD hand operated grout pump: Ideal for grouting metal door frames
-
Nov. 25
-
Kenrich Products. (2002). "Model GP-2HD hand operated grout pump: Ideal for grouting metal door frames." Kenrich Products webpage, 〈http://www.kenrichproducts.com/ModelGP2HD.html〉 (Nov. 25).
-
(2002)
Kenrich Products Webpage
-
-
-
20
-
-
0032207592
-
Comparison of U.S. project delivery systems
-
Konchar, M., and Sanvido, V. (1998). "Comparison of U.S. project delivery systems." J. Constr. Eng. Manage., 124(6), 435-444.
-
(1998)
J. Constr. Eng. Manage.
, vol.124
, Issue.6
, pp. 435-444
-
-
Konchar, M.1
Sanvido, V.2
-
22
-
-
84860091632
-
Implementable research: A prerequisite for implementation of research results
-
Construction Industry Institute and Natl. Science Foundation, Austin, Tex.
-
Laufer, A. (1997). "Implementable research: A prerequisite for implementation of research results." Proc., "How do we do research to improve the engineering and construction industry" workshop, Construction Industry Institute and Natl. Science Foundation, Austin, Tex.
-
(1997)
Proc., "How Do We Do Research to Improve the Engineering and Construction Industry" Workshop
-
-
Laufer, A.1
-
23
-
-
0010039648
-
-
Western Ed., R. S. Means Company, Inc., Kingston, Mass.
-
Means, R. S. (1997). Building construction cost data 1997, Western Ed., R. S. Means Company, Inc., Kingston, Mass.
-
(1997)
Building Construction Cost Data 1997
-
-
Means, R.S.1
-
24
-
-
84860082459
-
CSI reverses course on proposed revision to Masterformat
-
Nov. 24
-
Mechanical Contractors Association of America (MCAA). (2003). "CSI reverses course on proposed revision to Masterformat." The MCAA National Update, 〈http://www.mcaa.org/update/archives/nul12403.cfm〉 (Nov. 24).
-
(2003)
The MCAA National Update
-
-
-
25
-
-
0032119946
-
Building operations management theory through case and field research
-
Meredith, J. (1998). "Building operations management theory through case and field research." J. Operations Manage., 16(4), 441-454.
-
(1998)
J. Operations Manage.
, vol.16
, Issue.4
, pp. 441-454
-
-
Meredith, J.1
-
26
-
-
84860082352
-
Top design firms ranked by total billings for projects completed in Illinois, Indiana, and Wisconsin
-
McGraw-Hill, Chicago; (Nov. 25)
-
Midwest Construction. (2002). "Top design firms ranked by total billings for projects completed in Illinois, Indiana, and Wisconsin." Midwest Construction website, McGraw-Hill, Chicago, 〈http://midwest. construction.com/people/toplists/02_TopDesignFirms.pdf〉 (Nov. 25).
-
(2002)
Midwest Construction Website
-
-
-
27
-
-
2342420277
-
Role of tolerances and process capability data in product and process design integration
-
ASCE, Reston, Va.; (Oct. 12)
-
Milberg, C. and Tommelein, I. D. (2003). "Role of tolerances and process capability data in product and process design integration," Proc., Construction Research Congress, ASCE, Reston, Va., 〈http://www.ce.berkeley. edu/~tommelein/papers/CRC03-Milberg&Tommelein-40671-011-004.pdf〉 (Oct. 12).
-
(2003)
Proc., Construction Research Congress
-
-
Milberg, C.1
Tommelein, I.D.2
-
28
-
-
84860092275
-
Alliance lean design/construct on a small high tech project
-
Nov. 25, 2002
-
Miles, R. S. (1998). "Alliance lean design/construct on a small high tech project." Proc., 6th Annual Conf. Intl. Group for Lean Construction,http://www.ce.berkeley.edu/~tommelein/IGLC-6/Miles.pdf〉 (Nov. 25, 2002).
-
(1998)
Proc., 6th Annual Conf. Intl. Group for Lean Construction
-
-
Miles, R.S.1
-
29
-
-
0032208060
-
Model for public sector design-build project selection
-
Molenaar, K. R. and Songer, A. D. (1998). "Model for public sector design-build project selection." J. Constr. Eng. Manage., 124(6), 467-479.
-
(1998)
J. Constr. Eng. Manage.
, vol.124
, Issue.6
, pp. 467-479
-
-
Molenaar, K.R.1
Songer, A.D.2
-
30
-
-
0009353362
-
-
Publication 6-6, Construction Industry Institute, Austin, Tex.
-
Nell, J. (1988). "Work packaging for project control." Publication 6-6, Construction Industry Institute, Austin, Tex.
-
(1988)
Work Packaging for Project Control
-
-
Nell, J.1
-
31
-
-
0004158431
-
-
McGraw-Hill, Boston
-
Oglesby, C. H., Parker, H. W., and Howell, G. A. (1989). Productivity improvement in construction, McGraw-Hill, Boston.
-
(1989)
Productivity Improvement in Construction
-
-
Oglesby, C.H.1
Parker, H.W.2
Howell, G.A.3
-
33
-
-
0017135463
-
Designing to reduce construction costs
-
Paulson, B. C. (1976). "Designing to reduce construction costs." J. Constr. Div., Am. Soc. Civ. Eng., 102(C04), 587-592.
-
(1976)
J. Constr. Div., Am. Soc. Civ. Eng.
, vol.102
, Issue.C04
, pp. 587-592
-
-
Paulson, B.C.1
-
34
-
-
84860084625
-
-
Daily Reporter Publishing Company, Milwaukee; (Nov. 25, 2002)
-
Ryan, S. (2000). "Options open: Would-be, public-sector design/build customers say they wouldn't rush to limited bidding," Daily Reporter Publishing Company, Milwaukee, 〈http://www.dailyreporter.com/special/db/ options.html〉 (Nov. 25, 2002).
-
(2000)
Options Open: Would-be, Public-sector Design/build Customers Say They Wouldn't Rush to Limited Bidding
-
-
Ryan, S.1
-
35
-
-
0010075840
-
Project delivery systems: CM at risk, design-build, and design-bid-build
-
Construction Industry Institute, Austin, Tex.
-
Sanvido, V. E., and Konchar, M. D. (1998). "Project delivery systems: CM at risk, design-build, and design-bid-build." Research Rep. No. 133, Construction Industry Institute, Austin, Tex.
-
(1998)
Research Rep. No. 133
, vol.133
-
-
Sanvido, V.E.1
Konchar, M.D.2
-
37
-
-
84860077594
-
-
Daily Reporter Publishing Co., Milwaukee (Nov. 25, 2002)
-
Schultz, S. (2000a). "Top educators say defining design/build is all academic." Daily Reporter Publishing Co., Milwaukee, 〈http://www. dailyreporter.com/special/db/educate.html〉 (Nov. 25, 2002).
-
(2000)
Top Educators Say Defining Design/build Is All Academic
-
-
Schultz, S.1
-
39
-
-
0027658817
-
Builders as sources of construction innovation
-
Slaughter, E. S. (1993). "Builders as sources of construction innovation." J. Constr. Eng. Manage., 119(3), 532-549.
-
(1993)
J. Constr. Eng. Manage.
, vol.119
, Issue.3
, pp. 532-549
-
-
Slaughter, E.S.1
-
40
-
-
84860074807
-
-
Daily Reporter Publishing Company, Milwaukee; (Nov. 25, 2002)
-
Snow, D. (2000). "Design/build always demands definition: There is nothing, absolutely nothing, good about design/build." Daily Reporter Publishing Company, Milwaukee, 〈http://www.dailyreporter.com/special/db/ snow2000.html〉 (Nov. 25, 2002).
-
(2000)
Design/build Always Demands Definition: There Is Nothing, Absolutely Nothing, Good about Design/build
-
-
Snow, D.1
-
42
-
-
13944261370
-
Coordinating specialists
-
Constr. Engrg. Mgmt. Prog., Dept. of Civil and Environmental Engineering, Univ. of Calif., Berkeley, Calif.
-
Tommelein, I. D., and Ballard, G. (1997). "Coordinating specialists." Technical Rep. No. 97-8, Constr. Engrg. Mgmt. Prog., Dept. of Civil and Environmental Engineering, Univ. of Calif., Berkeley, Calif.
-
(1997)
Technical Rep. No. 97-8
, vol.97
, Issue.8
-
-
Tommelein, I.D.1
Ballard, G.2
-
43
-
-
0032645520
-
Parade game: Impact of work flow variability on trade performance
-
Tommelein, I. D., Riley, D., and Howell, G. A. (1999). "Parade game: Impact of work flow variability on trade performance." J. Constr. Eng. Manage., 125(5), 304-310.
-
(1999)
J. Constr. Eng. Manage.
, vol.125
, Issue.5
, pp. 304-310
-
-
Tommelein, I.D.1
Riley, D.2
Howell, G.A.3
-
44
-
-
27144450471
-
Improving capital projects supply chain performance
-
Construction Industry Institute, Austin, Tex.
-
Tommelein, I. D., Walsh, K. D., and Hershauer, J. C. (2003). "Improving capital projects supply chain performance." Research Rep. PT172-11, Construction Industry Institute, Austin, Tex.
-
(2003)
Research Rep.
, vol.PT172-11
-
-
Tommelein, I.D.1
Walsh, K.D.2
Hershauer, J.C.3
-
45
-
-
69949094691
-
Case study for work structuring: Installation of metal door frames
-
Univ. of Sussex, Brighton, UK. (Nov. 25, 2002)
-
Tsao, C. C. Y., Tommelein, I. D., Swanlund, E., and Howell, G. A. (2000a). "Case study for work structuring: Installation of metal door frames." Proc., 8th Conf., Int. Group Lean Constr., Univ. of Sussex, Brighton, UK., 〈http://www.ce.berkeley.edu/~tornmelein/IGLC8-TsaoEtAl.pdf) (Nov. 25, 2002).
-
(2000)
Proc., 8th Conf., Int. Group Lean Constr.
-
-
Tsao, C.C.Y.1
Tommelein, I.D.2
Swanlund, E.3
Howell, G.A.4
-
46
-
-
13944283475
-
Towards work structuring: Five whys applied to installation of metal door frames
-
Constr. Engrg. Mgmt. Prog., Dept. of Civil and Environmental Engineering, Univ. of California, Berkeley, Calif.
-
Tsao, C. C. Y., Tommelein, I. D., Swanlund, E., and Howell, G. A. (2000b). "Towards work structuring: Five whys applied to installation of metal door frames." Technical Rep. No. 2000-03, Constr. Engrg. Mgmt. Prog., Dept. of Civil and Environmental Engineering, Univ. of California, Berkeley, Calif.
-
(2000)
Technical Rep. No. 2000-03
, vol.2000
, Issue.3
-
-
Tsao, C.C.Y.1
Tommelein, I.D.2
Swanlund, E.3
Howell, G.A.4
-
47
-
-
0003680449
-
-
ASQ Quality Press, Milwaukee
-
Wilson, P. F., Dell, L. D., and Anderson, G. F. (1993). Root cause analysis: A tool for total quality management, ASQ Quality Press, Milwaukee.
-
(1993)
Root Cause Analysis: A Tool for Total Quality Management
-
-
Wilson, P.F.1
Dell, L.D.2
Anderson, G.F.3
|