-
2
-
-
0037332769
-
A virtual construction environment for preconstruction planning
-
Waly A.F., and Thabet W.Y. A virtual construction environment for preconstruction planning. Automation in Construction 12 (2002) 139-154
-
(2002)
Automation in Construction
, vol.12
, pp. 139-154
-
-
Waly, A.F.1
Thabet, W.Y.2
-
4
-
-
0037400797
-
Implementation of visualization as planning and scheduling tool in construction
-
Chau K.W., Anson M., and Zhang J.P. Implementation of visualization as planning and scheduling tool in construction. Building and Environment 38 (2003) 713-719
-
(2003)
Building and Environment
, vol.38
, pp. 713-719
-
-
Chau, K.W.1
Anson, M.2
Zhang, J.P.3
-
6
-
-
0032642926
-
Optimization of resource allocation and leveling using genetic algorithms
-
Hegazy T. Optimization of resource allocation and leveling using genetic algorithms. Journal of Construction Engineering and Management 125 3 (1999) 167-175
-
(1999)
Journal of Construction Engineering and Management
, vol.125
, Issue.3
, pp. 167-175
-
-
Hegazy, T.1
-
8
-
-
5244262334
-
Using improved genetic algorithms to facilitate time-cost optimization
-
Li H., and Love P. Using improved genetic algorithms to facilitate time-cost optimization. Journal of Construction Engineering and Management 123 3 (1997) 233-237
-
(1997)
Journal of Construction Engineering and Management
, vol.123
, Issue.3
, pp. 233-237
-
-
Li, H.1
Love, P.2
-
9
-
-
6344281398
-
Resource optimization using combined simulation and genetic algorithms
-
Hegazy T., and Kassab M. Resource optimization using combined simulation and genetic algorithms. Journal of Construction Engineering and Management 129 6 (2003) 698-705
-
(2003)
Journal of Construction Engineering and Management
, vol.129
, Issue.6
, pp. 698-705
-
-
Hegazy, T.1
Kassab, M.2
-
10
-
-
3142565144
-
4D dynamic management for construction planning and resource utilization
-
Wang H.J., Zhang J.P., Chau K.W., and Anson M. 4D dynamic management for construction planning and resource utilization. Automation in Construction 13 (2004) 575-589
-
(2004)
Automation in Construction
, vol.13
, pp. 575-589
-
-
Wang, H.J.1
Zhang, J.P.2
Chau, K.W.3
Anson, M.4
-
11
-
-
45949103855
-
Integrating design and construction through virtual prototyping
-
Li H., Huang T., Kong C.W., Guo H.L., Baldwin A., Chan N., and Wong J. Integrating design and construction through virtual prototyping. Automation in Construction 17 (2008) 915-922
-
(2008)
Automation in Construction
, vol.17
, pp. 915-922
-
-
Li, H.1
Huang, T.2
Kong, C.W.3
Guo, H.L.4
Baldwin, A.5
Chan, N.6
Wong, J.7
-
12
-
-
34147115212
-
A virtual prototyping system for simulating construction processes
-
Huang T., Kong C.W., Guo H.L., Baldwin A., and Li H. A virtual prototyping system for simulating construction processes. Automation in Construction 16 (2007) 576-585
-
(2007)
Automation in Construction
, vol.16
, pp. 576-585
-
-
Huang, T.1
Kong, C.W.2
Guo, H.L.3
Baldwin, A.4
Li, H.5
-
13
-
-
0043253368
-
Formalization and automation of time-space conflict analysis
-
Akinci B., Fischer M., Levitt R., and Carlson R. Formalization and automation of time-space conflict analysis. Journal of Computing in Civil Engineering 16 2 (2000) 124-134
-
(2000)
Journal of Computing in Civil Engineering
, vol.16
, Issue.2
, pp. 124-134
-
-
Akinci, B.1
Fischer, M.2
Levitt, R.3
Carlson, R.4
-
14
-
-
0041805006
-
Automated generation of work spaces required by construction activities
-
Akinci B., Fischer M., Levitt R., and Carlson R. Automated generation of work spaces required by construction activities. Journal of Construction Engineering and Management 128 4 (2000) 306-315
-
(2000)
Journal of Construction Engineering and Management
, vol.128
, Issue.4
, pp. 306-315
-
-
Akinci, B.1
Fischer, M.2
Levitt, R.3
Carlson, R.4
-
15
-
-
0028401574
-
Modeling work space to schedule repetitive floors in multistory buildings
-
Thabet W., and Beliveau Y. Modeling work space to schedule repetitive floors in multistory buildings. Journal of Construction Engineering and Management 120 1 (1994) 96-116
-
(1994)
Journal of Construction Engineering and Management
, vol.120
, Issue.1
, pp. 96-116
-
-
Thabet, W.1
Beliveau, Y.2
-
17
-
-
33746350454
-
Integrating 3D visualization and simulation for tower crane operations on construction sites
-
Al-Hussein M., Niaz M.A., Yu H., and Kim H. Integrating 3D visualization and simulation for tower crane operations on construction sites. Automation in Construction 15 (2006) 554-562
-
(2006)
Automation in Construction
, vol.15
, pp. 554-562
-
-
Al-Hussein, M.1
Niaz, M.A.2
Yu, H.3
Kim, H.4
-
18
-
-
37249020345
-
Simulation-based identification of possible locations for mobile cranes on construction sites
-
Tantisevi K., and Akinci B. Simulation-based identification of possible locations for mobile cranes on construction sites. Journal of computing in civil engineering 22 (2008) 21-30
-
(2008)
Journal of computing in civil engineering
, vol.22
, pp. 21-30
-
-
Tantisevi, K.1
Akinci, B.2
-
23
-
-
13244275240
-
Application of 4D for dynamic site layout and management of construction projects
-
Ma Z.Y., Shen Q.P., and Zhang J.P. Application of 4D for dynamic site layout and management of construction projects. Automation in Construction 14 (2005) 369-381
-
(2005)
Automation in Construction
, vol.14
, pp. 369-381
-
-
Ma, Z.Y.1
Shen, Q.P.2
Zhang, J.P.3
|