-
1
-
-
84866081428
-
Applicability of engineering design theories on manufacturing system design in the context of concurrent engineering
-
Aganovic, D., Bjelkemyr, M., and Lindberg, B. (2004). "Applicability of Engineering Design Theories on Manufacturing System Design in the Context of Concurrent Engineering." Methods and Tools for Co-Operative and Integrated Design, 145-158.
-
(2004)
Methods and Tools for Co-Operative and Integrated Design
, pp. 145-158
-
-
Aganovic, D.1
Bjelkemyr, M.2
Lindberg, B.3
-
4
-
-
33645512097
-
Implementing a B2B e-work system to the approval process of rebar design and estimation
-
Castro-Lacouture, D. and Skibniewski, M.J. (2006). "Implementing a B2B e-Work System to the Approval Process of Rebar Design and Estimation." ASCE, J. Comp. in Civ. Engrg., 20(1), 28-37.
-
(2006)
ASCE, J. Comp. in Civ. Engrg.
, vol.20
, Issue.1
, pp. 28-37
-
-
Castro-Lacouture, D.1
Skibniewski, M.J.2
-
5
-
-
34249965807
-
A Review of research in mechanical engineering design. Part I: Descriptive, prescriptive, and computer-based models of design processes
-
Finger, S. and Dixon, J.R. (1989a). "A Review of Research in Mechanical Engineering Design. Part I: Descriptive, Prescriptive, and Computer-Based Models of Design Processes." Res. Eng. Des., 1(1), 51-67.
-
(1989)
Res. Eng. Des.
, vol.1
, Issue.1
, pp. 51-67
-
-
Finger, S.1
Dixon, J.R.2
-
6
-
-
1842593142
-
Review of research in mechanical engineering design. Part II. Representations, analysis, and design for the life cycle
-
Finger, S. and Dixon, J.R. (1989b). "Review of research in mechanical engineering design. Part II. Representations, analysis, and design for the life cycle." Res. Eng. Des., 1(2), 121-137.
-
(1989)
Res. Eng. Des.
, vol.1
, Issue.2
, pp. 121-137
-
-
Finger, S.1
Dixon, J.R.2
-
7
-
-
18544365530
-
Adapting real options to new product development by modelling the second toyota paradox
-
Ford, D.N. and Sobek II, D.K. (2005). "Adapting Real Options to New Product Development by Modelling the Second Toyota Paradox." IEEE Transactions on Engineering Management, 52(2), 175-185.
-
(2005)
IEEE Transactions on Engineering Management
, vol.52
, Issue.2
, pp. 175-185
-
-
Ford, D.N.1
Sobek, D.K.2
-
8
-
-
0030148492
-
Involving suppliers in product development in the United States and Japan: Evidence for set-based concurrent engineering
-
Liker, J.K., Sobek II, D.K., Ward, A., and Cristiano, J.J. (1996). "Involving suppliers in product development in the United States and Japan: evidence for set-based concurrent engineering." IEEE Transactions on Engrg. Mgmt., 43(2), 165-178.
-
(1996)
IEEE Transactions on Engrg. Mgmt.
, vol.43
, Issue.2
, pp. 165-178
-
-
Liker, J.K.1
Sobek, D.K.2
Ward, A.3
Cristiano, J.J.4
-
9
-
-
0032624160
-
Constraint-based support for collaboration in design and construction
-
Lottaz, C., Clement, D.E., Faltings, B.V., and Smith, I.F.C. (1999). "Constraint-Based Support for Collaboration in Design and Construction." ASCE, J. Comp. in Civ. Engrg., 13(1), 23-35.
-
(1999)
ASCE, J. Comp. in Civ. Engrg.
, vol.13
, Issue.1
, pp. 23-35
-
-
Lottaz, C.1
Clement, D.E.2
Faltings, B.V.3
Smith, I.F.C.4
-
10
-
-
33744521815
-
A new 3D-CAD system for set-based parametric design
-
Nahm, Y. and Ishikawa, H. (2006). "A new 3D-CAD system for set-based parametric design." Int. J. Adv. Manuf. Technol., 29(1-2), 137-150.
-
(2006)
Int. J. Adv. Manuf. Technol.
, vol.29
, Issue.1-2
, pp. 137-150
-
-
Nahm, Y.1
Ishikawa, H.2
-
11
-
-
0001817489
-
Toyota's principles of set-based concurrent engineering
-
Sobek II, D.K., Ward, A., and Liker, J.K. (1999). "Toyota's Principles of Set-Based Concurrent Engineering." Sloan Management Review, 40(2), 67-83.
-
(1999)
Sloan Management Review
, vol.40
, Issue.2
, pp. 67-83
-
-
Sobek, D.K.1
Ward, A.2
Liker, J.K.3
-
13
-
-
27644465689
-
Restructuring the rebar supply system
-
San Diego, CA, 5-7 April, ASCE, Reston, VA
-
Tommelein, I.D. and Ballard, G. (2005) "Restructuring the Rebar Supply System." Proc. Constr. Research Congress, San Diego, CA, 5-7 April, ASCE, Reston, VA, 10 pp.
-
(2005)
Proc. Constr. Research Congress
, pp. 10
-
-
Tommelein, I.D.1
Ballard, G.2
-
15
-
-
0002533915
-
The second toyota paradox: How delaying decisions can make better cars faster
-
Ward, A., Liker, J.K., Cristiano, J.J., and Sobek II, D.K. (1995). "The Second Toyota Paradox: How Delaying Decisions Can Make Better Cars Faster." Sloan Management Review, 36(3), 43-61.
-
(1995)
Sloan Management Review
, vol.36
, Issue.3
, pp. 43-61
-
-
Ward, A.1
Liker, J.K.2
Cristiano, J.J.3
Sobek, D.K.4
|