-
1
-
-
0004213239
-
The impact of supply chain integration on operating performance
-
Armistead, C.G. and Mapes, J., 1993. The impact of supply chain integration on operating performance. Logistics Information Management, 6 (4), 9-14.
-
(1993)
Logistics Information Management
, vol.6
, Issue.4
, pp. 9-14
-
-
Armistead, C.G.1
Mapes, J.2
-
2
-
-
0000357545
-
Estimating non-response bias in mail surveys
-
Armstrong, J.S. and Overton, T.S., 1977. Estimating non-response bias in mail surveys. Journal of Marketing Research, 14 (3), 396-400.
-
(1977)
Journal of Marketing Research
, vol.14
, Issue.3
, pp. 396-400
-
-
Armstrong, J.S.1
Overton, T.S.2
-
3
-
-
41549154121
-
The role of forecasting on bullwhip effect for E-SCM applications
-
Bayraktar, E, et al., 2008. The role of forecasting on bullwhip effect for E-SCM applications. International Journal of Production Economics, 113 (1), 193-204.
-
(2008)
International Journal of Production Economics
, vol.113
, Issue.1
, pp. 193-204
-
-
Bayraktar, E.1
-
4
-
-
0025397298
-
Comparative fit indexes in structural models
-
Bentler, P.M., 1990. Comparative fit indexes in structural models. Psychological Bulletin, 107 (2), 238-246.
-
(1990)
Psychological Bulletin
, vol.107
, Issue.2
, pp. 238-246
-
-
Bentler, P.M.1
-
5
-
-
0032258584
-
Simulation analysis of a manufacturing supply chain
-
Bhaskaran, S., 1998. Simulation analysis of a manufacturing supply chain. Decision Sciences, 29 (3), 633-657.
-
(1998)
Decision Sciences
, vol.29
, Issue.3
, pp. 633-657
-
-
Bhaskaran, S.1
-
6
-
-
0021410122
-
MRP system nervousness: Causes and cures
-
Blackburn, J.D., Kropp, D.H., and Millen, R.A., 1985. MRP system nervousness: causes and cures. Engineering Costs and Production Economics, 9 (1-3), 141-146.
-
(1985)
Engineering Costs and Production Economics
, vol.9
, Issue.1-3
, pp. 141-146
-
-
Blackburn, J.D.1
Kropp, D.H.2
Millen, R.A.3
-
7
-
-
0022693736
-
A comparison of strategies to dampen nervousness in MRP systems
-
Blackburn, J.D., Kropp, D.H., and Millen, R.A., 1986. A comparison of strategies to dampen nervousness in MRP systems. Management Science, 32 (4), 413-429.
-
(1986)
Management Science
, vol.32
, Issue.4
, pp. 413-429
-
-
Blackburn, J.D.1
Kropp, D.H.2
Millen, R.A.3
-
8
-
-
0023532189
-
A comparison of strategies to dampen nervousness in MRP systems
-
Blackburn, J.D., Kropp, D.H., and Millen, R.A., 1987. A comparison of strategies to dampen nervousness in MRP systems. International Journal of Production Research, 25 (12), 1739-1749.
-
(1987)
International Journal of Production Research
, vol.25
, Issue.12
, pp. 1739-1749
-
-
Blackburn, J.D.1
Kropp, D.H.2
Millen, R.A.3
-
10
-
-
0032659102
-
Strategically managed buyer-supplier relationships and performance outcomes
-
Carr, A.S. and Pearson, J.N., 1999. Strategically managed buyer-supplier relationships and performance outcomes. Journal of Operations Management, 17 (5), 497-519.
-
(1999)
Journal of Operations Management
, vol.17
, Issue.5
, pp. 497-519
-
-
Carr, A.S.1
Pearson, J.N.2
-
11
-
-
18844430559
-
Competitive strategies and manufacturing logistics - An empirical study of Hong Kong manufacturers
-
Chan, J.W.K., 2005. Competitive strategies and manufacturing logistics - an empirical study of Hong Kong manufacturers. International Journal of Physical Distribution & Logistics Management, 35 (1), 20-43.
-
(2005)
International Journal of Physical Distribution & Logistics Management
, vol.35
, Issue.1
, pp. 20-43
-
-
Chan, J.W.K.1
-
12
-
-
0035342309
-
Supply networks and complex adaptive systems: Control versus emergence
-
Choi, T.Y., Dooley, K.J., and Rungtusanatham, M., 2001. Supply networks and complex adaptive systems: control versus emergence. Journal of Operations Management, 19 (3), 351-366
-
(2001)
Journal of Operations Management
, vol.19
, Issue.3
, pp. 351-366
-
-
Choi, T.Y.1
Dooley, K.J.2
Rungtusanatham, M.3
-
13
-
-
0001878819
-
A paradigm for developing better measures of marketing constructs
-
Churchill, G.A., 1979. A paradigm for developing better measures of marketing constructs. Journal of Marketing Research, 16 (1), 64-72.
-
(1979)
Journal of Marketing Research
, vol.16
, Issue.1
, pp. 64-72
-
-
Churchill, G.A.1
-
14
-
-
77955681607
-
-
Commission on Strategic Development Executive Committee Hong Kong Government. Available from: [Accessed 30 June 2008]
-
Commission on Strategic Development Executive Committee, 2006. Report, paper ref.: CSD/EC/ 6/2007. Hong Kong Government. Available from: http://www.cpu.gov.hk/english/documents/ csd/csd-ec-7-2006.pdf [Accessed 30 June 2008].
-
(2006)
Report, Paper Ref.: CSD/EC/ 6/2007
-
-
-
15
-
-
77955704556
-
-
Datamonitor Taiwan: Department of Statistics, Ministry of Economic Affairs
-
Datamonitor, 2007a. Industry profile (consumer electronics) in Asia-Pacific. Taiwan: Department of Statistics, Ministry of Economic Affairs.
-
(2007)
Industry Profile (Consumer Electronics) in Asia-Pacific
-
-
-
16
-
-
77955671286
-
-
Datamonitor, Taiwan: Department of Statistics, Ministry of Economic Affairs
-
Datamonitor, 2007b. Industry profile (consumer electronics) in China. Taiwan: Department of Statistics, Ministry of Economic Affairs.
-
(2007)
Industry Profile (Consumer Electronics) in China
-
-
-
17
-
-
77955701484
-
-
Datamonitor Taiwan: Department of Statistics, Ministry of Economic Affairs
-
Datamonitor, 2007c. Industry profile (consumer electronics) in Taiwan. Taiwan: Department of Statistics, Ministry of Economic Affairs.
-
(2007)
Industry Profile (Consumer Electronics) in Taiwan
-
-
-
18
-
-
0031271989
-
Nervousness in inventory management: Comparison of basic control rules
-
De Kok, T. and Inderfurth, K., 1997. Nervousness in inventory management: comparison of basic control rules. European Journal of Operational Research, 103 (1), 55-82.
-
(1997)
European Journal of Operational Research
, vol.103
, Issue.1
, pp. 55-82
-
-
De Kok, T.1
Inderfurth, K.2
-
19
-
-
0002545868
-
Mail and other self-administered questionnaires
-
P.H. Rossi, J.D. Wright and A.B. Anderson, eds. San Diego, CA: Academic Press
-
Dillman, D.A., 1983. Mail and other self-administered questionnaires, In: P.H. Rossi, J.D. Wright and A.B. Anderson, eds. Handbook of survey research. San Diego, CA: Academic Press, 359-377.
-
(1983)
Handbook of Survey Research
, pp. 359-377
-
-
Dillman, D.A.1
-
21
-
-
0000812836
-
Effects of leader role, team-set goal difficulty, efficacy, and tactics on team effectiveness
-
Durham, C.C, Knight, D., and Locke, E.A., 1997. Effects of leader role, team-set goal difficulty, efficacy, and tactics on team effectiveness. Organizational Behaviour and Human Decision Processes, 72 (2), 203-231.
-
(1997)
Organizational Behaviour and Human Decision Processes
, vol.72
, Issue.2
, pp. 203-231
-
-
Durham, C.C.1
Knight, D.2
Locke, E.A.3
-
22
-
-
0001896737
-
A managerial guideline for the development and implementation of purchasing partnerships
-
Ellram, L.M., 1991. A managerial guideline for the development and implementation of purchasing partnerships. International Journal of Purchasing and Materials Management, 27 (2), 2-8.
-
(1991)
International Journal of Purchasing and Materials Management
, vol.27
, Issue.2
, pp. 2-8
-
-
Ellram, L.M.1
-
23
-
-
45149135940
-
Empirical research methods in operations management
-
Flynn, B.B., et al., 1990. Empirical research methods in operations management. Journal of Operations Management, 9 (2), 250-285.
-
(1990)
Journal of Operations Management
, vol.9
, Issue.2
, pp. 250-285
-
-
Flynn, B.B.1
-
24
-
-
84993065107
-
Supplier-customer relationships and company performance
-
Groves, G. and Valsamakis, V., 1998. Supplier-customer relationships and company performance. International Journal of Logistics Management, 9 (2), 51-64.
-
(1998)
International Journal of Logistics Management
, vol.9
, Issue.2
, pp. 51-64
-
-
Groves, G.1
Valsamakis, V.2
-
25
-
-
19844377525
-
Build-to-order supply chain management: A literature review and framework for development
-
Gunasekaran, A. and Ngai, E.W.T., 2005. Build-to-order supply chain management: a literature review and framework for development. Journal of Operations Management, 23 (5), 423-451.
-
(2005)
Journal of Operations Management
, vol.23
, Issue.5
, pp. 423-451
-
-
Gunasekaran, A.1
Ngai, E.W.T.2
-
27
-
-
0035979625
-
Comparison of (s, S) and (s, nQ) inventory control rules with respect to planning stability
-
Heisig, G., 2001. Comparison of (s, S) and (s, nQ) inventory control rules with respect to planning stability. International Journal of Production Economics, 73 (1), 59-82.
-
(2001)
International Journal of Production Economics
, vol.73
, Issue.1
, pp. 59-82
-
-
Heisig, G.1
-
28
-
-
0031164721
-
The causes of schedule instability in an automotive supply chain
-
Inman, R.R. and Gonsalvez, D.J., 1997. The causes of schedule instability in an automotive supply chain. Production and Inventory Management Journal, 38 (2), 26-32.
-
(1997)
Production and Inventory Management Journal
, vol.38
, Issue.2
, pp. 26-32
-
-
Inman, R.R.1
Gonsalvez, D.J.2
-
30
-
-
0029389855
-
Alternative approaches for reducing schedule instability in multistage manufacturing under demand uncertainty
-
Kadipasaoglu, S. and Sridharan, V., 1995. Alternative approaches for reducing schedule instability in multistage manufacturing under demand uncertainty. Journal of Operations Management, 13 (3), 193-211.
-
(1995)
Journal of Operations Management
, vol.13
, Issue.3
, pp. 193-211
-
-
Kadipasaoglu, S.1
Sridharan, V.2
-
31
-
-
0031101669
-
Measurement of instability in multi-level MRP systems
-
Kadipasaoglu, S.N. and Sridharan, S.V., 1997. Measurement of instability in multi-level MRP systems. International Journal of Production Research, 35 (3), 713-737.
-
(1997)
International Journal of Production Research
, vol.35
, Issue.3
, pp. 713-737
-
-
Kadipasaoglu, S.N.1
Sridharan, S.V.2
-
32
-
-
3543130792
-
Transition to just-in-time purchasing
-
Kelle, P. and Miller, P.A., 1998. Transition to just-in-time purchasing. International Journal of Operations and Production Management, 18 (1), 53-65.
-
(1998)
International Journal of Operations and Production Management
, vol.18
, Issue.1
, pp. 53-65
-
-
Kelle, P.1
Miller, P.A.2
-
34
-
-
19944400423
-
Responding to schedule changes in build-to-order supply chains
-
Krajewski, L., Wei, J.C., and Tang, L., 2005. Responding to schedule changes in build-to-order supply chains. Journal of Operations Management, 23 (5), 452-469.
-
(2005)
Journal of Operations Management
, vol.23
, Issue.5
, pp. 452-469
-
-
Krajewski, L.1
Wei, J.C.2
Tang, L.3
-
35
-
-
57349148226
-
Collective efficacy and schedule instability - A study in Hong Kong and the Pearl River Delta Region
-
Law, K.M.Y. and Pujawan, N., 2009. Collective efficacy and schedule instability - a study in Hong Kong and the Pearl River Delta Region. International Journal of Industrial & Systems Engineering, 4 (1), 1-18.
-
(2009)
International Journal of Industrial & Systems Engineering
, vol.4
, Issue.1
, pp. 1-18
-
-
Law, K.M.Y.1
Pujawan, N.2
-
37
-
-
0030528170
-
Marketing and discontinuous innovation: The probe and learn process
-
Lynn, G.S., Morone, J.G., and Paulson, A.S., 1996. Marketing and discontinuous innovation: the probe and learn process. California Management Review, 38 (3), 8-21.
-
(1996)
California Management Review
, vol.38
, Issue.3
, pp. 8-21
-
-
Lynn, G.S.1
Morone, J.G.2
Paulson, A.S.3
-
38
-
-
10444270256
-
The impact of setup cost, commonality, and capacity on schedule instability: An exploratory study
-
Meixell, M., 2005. The impact of setup cost, commonality, and capacity on schedule instability: an exploratory study. International Journal of Production Economics, 95 (1), 95-107.
-
(2005)
International Journal of Production Economics
, vol.95
, Issue.1
, pp. 95-107
-
-
Meixell, M.1
-
39
-
-
0027908825
-
A method for achieving better customer service, lower costs, and less instability in master production schedules
-
Metters, R.D., 1993. A method for achieving better customer service, lower costs, and less instability in master production schedules. Production and Inventory Management Journal, 34 (4), 61-66.
-
(1993)
Production and Inventory Management Journal
, vol.34
, Issue.4
, pp. 61-66
-
-
Metters, R.D.1
-
40
-
-
0000003783
-
The entry mode choice of MNEs: An evolutionary approach
-
Mutinellia, M. and Piscitello, L., 2002. The entry mode choice of MNEs: an evolutionary approach. Research Policy, 27 (5), 491-506.
-
(2002)
Research Policy
, vol.27
, Issue.5
, pp. 491-506
-
-
Mutinellia, M.1
Piscitello, L.2
-
41
-
-
0032270677
-
Causal linkages in supply chain management: An exploratory study of North American manufacturing firms
-
Narasimhan, R. and Jayaram, J., 1998. Causal linkages in supply chain management: an exploratory study of North American manufacturing firms. Decision Sciences, 29 (3), 579-605.
-
(1998)
Decision Sciences
, vol.29
, Issue.3
, pp. 579-605
-
-
Narasimhan, R.1
Jayaram, J.2
-
42
-
-
34447296449
-
Stability-oriented evaluation of rescheduling strategies, by using simulation
-
Pfeiffer, A., Kadar, B., and Monostori, L., 2007. Stability-oriented evaluation of rescheduling strategies, by using simulation. Computers in Industry, 58 (7), 630-643.
-
(2007)
Computers in Industry
, vol.58
, Issue.7
, pp. 630-643
-
-
Pfeiffer, A.1
Kadar, B.2
Monostori, L.3
-
43
-
-
0030547466
-
A motivational investigation of group effectiveness using social-cognitive theory
-
Prussia, G.E and Kinicki, A.J., 1996. A motivational investigation of group effectiveness using social-cognitive theory. Journal of Applied Psychology, 81 (2), 187-198.
-
(1996)
Journal of Applied Psychology
, vol.81
, Issue.2
, pp. 187-198
-
-
Prussia, G.E.1
Kinicki, A.J.2
-
44
-
-
4444332583
-
System nervousness and inventory locations
-
Orlando, Florida
-
Pujawan, I.N. and Kingsman, B.G., 2000. System nervousness and inventory locations. In: Proceedings of the 31st Decision Science Institute national meeting, Orlando, Florida, 1174-1176.
-
(2000)
Proceedings of the 31st Decision Science Institute National Meeting
, pp. 1174-1176
-
-
Pujawan, I.N.1
Kingsman, B.G.2
-
45
-
-
4444220587
-
Schedule nervousness in a manufacturing system: A case study
-
Pujawan, I.N., 2004. Schedule nervousness in a manufacturing system: a case study. Production Planning and Control, 15 (5), 515-524.
-
(2004)
Production Planning and Control
, vol.15
, Issue.5
, pp. 515-524
-
-
Pujawan, I.N.1
-
46
-
-
2642546411
-
Internationalization and Performance: An organizational learning perspective
-
Ruigrok, W. and Wagner, H., 2003. Internationalization and Performance: an organizational learning perspective. Management International Review, 43 (1), 63-83.
-
(2003)
Management International Review
, vol.43
, Issue.1
, pp. 63-83
-
-
Ruigrok, W.1
Wagner, H.2
-
47
-
-
0142010548
-
Supply-chain linkages and operational performance, a resourcebased-view perspective
-
Rungtusanatham, M., et al., 2003. Supply-chain linkages and operational performance, a resourcebased-view perspective. International Journal of Operations and Production Management, 23 (9), 1084-1099.
-
(2003)
International Journal of Operations and Production Management
, vol.23
, Issue.9
, pp. 1084-1099
-
-
Rungtusanatham, M.1
-
48
-
-
0035609782
-
Supply chain interactions and time-related performances: An operations management perspective
-
Salvador, F., et al., 2001. Supply chain interactions and time-related performances: an operations management perspective. International Journal of Operations and Production Management, 21 (4), 461-475
-
(2001)
International Journal of Operations and Production Management
, vol.21
, Issue.4
, pp. 461-475
-
-
Salvador, F.1
-
49
-
-
35348946517
-
A strategic model for agile virtual enterprises partner selection
-
Sarkis, J., Talluri, S., and Gunasekaran, A., 2007. A strategic model for agile virtual enterprises partner selection. International Journal of Operations and Production Management, 27 (11), 1213-1234.
-
(2007)
International Journal of Operations and Production Management
, vol.27
, Issue.11
, pp. 1213-1234
-
-
Sarkis, J.1
Talluri, S.2
Gunasekaran, A.3
-
50
-
-
0003217948
-
Challenges of managing the development of breakthrough products in Japan
-
Song, X.M. and Parry, M.E., 1999. Challenges of managing the development of breakthrough products in Japan. Journal of Operations Management, 17 (6), 665-688.
-
(1999)
Journal of Operations Management
, vol.17
, Issue.6
, pp. 665-688
-
-
Song, X.M.1
Parry, M.E.2
-
51
-
-
0000470092
-
The impact of safety stock on schedule instability, cost, and service
-
Sridharan, V. and Laforge, R.L., 1989. The impact of safety stock on schedule instability, cost, and service. Journal of Operations Management, 8 (4), 327-347.
-
(1989)
Journal of Operations Management
, vol.8
, Issue.4
, pp. 327-347
-
-
Sridharan, V.1
Laforge, R.L.2
-
52
-
-
0039180801
-
On using buffer stock to combat schedule instability
-
Sridharan, V. and Laforge, R.L., 1990. On using buffer stock to combat schedule instability. International Journal of Operations and Production Management, 10 (7), 37-46.
-
(1990)
International Journal of Operations and Production Management
, vol.10
, Issue.7
, pp. 37-46
-
-
Sridharan, V.1
Laforge, R.L.2
-
53
-
-
77955676911
-
A high-tech adventure
-
Taiwan Review January
-
Taiwan Review, 2004. A high-tech adventure. Taiwan Review, 54 (1), 3, January.
-
(2004)
Taiwan Review
, vol.54
, Issue.1
, pp. 3
-
-
-
54
-
-
77955705832
-
-
[ Accessed August 2008]Trade Development Council Available from:
-
Trade Development Council, 2007. Available from: www.hktdc.com [Accessed August 2008].
-
(2007)
-
-
-
55
-
-
84986141864
-
Supplier development programs: An empirical analysis
-
Watts, C.A. and Hahn, C.K., 1993. Supplier development programs: an empirical analysis. International Journal of Purchasing and Materials Management, 29 (2), 11-17.
-
(1993)
International Journal of Purchasing and Materials Management
, vol.29
, Issue.2
, pp. 11-17
-
-
Watts, C.A.1
Hahn, C.K.2
-
56
-
-
84965459141
-
Meta-analysis of the antecedents of personal goal level
-
Wofford, J.C., Goodwin, V.L., and Premack, S., 1992. Meta-analysis of the antecedents of personal goal level. Journal of Management, 18 (3), 595-615.
-
(1992)
Journal of Management
, vol.18
, Issue.3
, pp. 595-615
-
-
Wofford, J.C.1
Goodwin, V.L.2
Premack, S.3
-
57
-
-
0036903279
-
Modularity strategic flexibility, and firm performance: A study of the home appliance industry
-
Worren, N., Morre, K., and Cardona, P., 2002. Modularity strategic flexibility, and firm performance: a study of the home appliance industry. Strategic Management Journal, 23 (12), 1123-1140.
-
(2002)
Strategic Management Journal
, vol.23
, Issue.12
, pp. 1123-1140
-
-
Worren, N.1
Morre, K.2
Cardona, P.3
-
58
-
-
77955678713
-
-
[online]. National Science Foundation Workshop on Research Directions and Opportunities in Manufacturing Logistics, Lehigh University, [Accessed July 2008]Bethlehem, PA. Available from:
-
Wu, S.D., et al., 1997. Manufacturing logistics research: taxonomy and directions [online]. National Science Foundation Workshop on Research Directions and Opportunities in Manufacturing Logistics, Lehigh University, Bethlehem, PA. Available from: http://www.lehigh.edu/-sdwl/ nsfws.pdf [Accessed July 2008].
-
(1997)
Manufacturing Logistics Research: Taxonomy and Directions
-
-
Wu, S.D.1
-
59
-
-
0037464628
-
Freezing the master production schedule under single resource constraint and demand uncertainty
-
Xie, J., Zhao, X., and Lee, T.S., 2003. Freezing the master production schedule under single resource constraint and demand uncertainty. International Journal of Production Economics, 83 (1), 65-84.
-
(2003)
International Journal of Production Economics
, vol.83
, Issue.1
, pp. 65-84
-
-
Xie, J.1
Zhao, X.2
Lee, T.S.3
-
60
-
-
2042547387
-
Impact of forecasting error on the performance of capacitated multi-item production systems
-
Xie, J., Lee, T.S., and Zhao, X., 2004. Impact of forecasting error on the performance of capacitated multi-item production systems. Computers and Industrial Engineering, 46 (2), 205-219.
-
(2004)
Computers and Industrial Engineering
, vol.46
, Issue.2
, pp. 205-219
-
-
Xie, J.1
Lee, T.S.2
Zhao, X.3
-
61
-
-
0027612429
-
Freezing the master production schedule for material requirements planning systems under demand uncertainty
-
Zhao, X. and Lee, T.S., 1993. Freezing the master production schedule for material requirements planning systems under demand uncertainty. Journal of Operations Management, 11 (2), 185-205.
-
(1993)
Journal of Operations Management
, vol.11
, Issue.2
, pp. 185-205
-
-
Zhao, X.1
Lee, T.S.2
-
62
-
-
0012315837
-
Lot-sizing rule and freezing the master production schedule under capacity constraint and deterministic demand
-
Zhao, X., Xie, J., and Jiang, Q., 2001a. Lot-sizing rule and freezing the master production schedule under capacity constraint and deterministic demand. Production and Operations Management, 10 (1), 45-67.
-
(2001)
Production and Operations Management
, vol.10
, Issue.1
, pp. 45-67
-
-
Zhao, X.1
Xie, J.2
Jiang, Q.3
-
63
-
-
0035782485
-
Evaluation of safety stock methods in multilevel materials requirements planning (MRP) system
-
Zhao, X., Lai, F., and Lee, T.S., 2001b. Evaluation of safety stock methods in multilevel materials requirements planning (MRP) system. Production Planning and Control, 12 (8), 798-803.
-
(2001)
Production Planning and Control
, vol.12
, Issue.8
, pp. 798-803
-
-
Zhao, X.1
Lai, F.2
Lee, T.S.3
|