Volumn 15, Issue 5, 2004, Pages 515-524

Schedule nervousness in a manufacturing system: A case study

Author keywords

Case study; Rescheduling; Schedule nervousness; Supply chain

Indexed keywords

ACCIDENT PREVENTION; BEHAVIORAL RESEARCH; COST BENEFIT ANALYSIS; MANUFACTURE; PROCESS CONTROL; SCHEDULING; STRATEGIC PLANNING;

EID: 4444220587     PISSN: 09537287     EISSN: 13665871     Source Type: Journal    
DOI: 10.1080/09537280410001726320     Document Type: Article
Times cited : (51)

References (23)
  • 3
    • 0018507737 scopus 로고
    • Less nervousness MRP systems: A dynamic economic lotsizing approach
    • Carlson, C. J., Jucker, J. V., and Kropp, D. H., 1979, Less nervousness MRP systems: a dynamic economic lotsizing approach.Management Science,25(8), 754-761.
    • (1979) Management Science , vol.25 , Issue.8 , pp. 754-761
    • Carlson, C.J.1    Jucker, J.V.2    Kropp, D.H.3
  • 4
    • 0005783163 scopus 로고
    • An examination of a distribution resource planning problem: DRP system nervousness
    • Ho, C. J., 1992, An examination of a distribution resource planning problem: DRP system nervousness.Journal ofBusiness Logistics,13(2), 125-152.
    • (1992) Journal ofBusiness Logistics , vol.13 , Issue.2 , pp. 125-152
    • Ho, C.J.1
  • 5
    • 0037143048 scopus 로고    scopus 로고
    • Evaluating dampening effects of alternative lot-sizing rules to reduce MRP system nervousness
    • Ho, C. J., 2002, Evaluating dampening effects of alternative lot-sizing rules to reduce MRP system nervousness.International Journal of Production Research,40(11), 2633-2652.
    • (2002) International Journal of Production Research , vol.40 , Issue.11 , pp. 2633-2652
    • Ho, C.J.1
  • 6
    • 0032143246 scopus 로고    scopus 로고
    • Correlating MRP system nervousness with forecast errors
    • Ho, C. J., and IRELAND, T. C., 1998, Correlating MRP system nervousness with forecast errors.International Journalof Production Research,36(8), 2285-2299.
    • (1998) International Journalof Production Research , vol.36 , Issue.8 , pp. 2285-2299
    • Ho, C.J.1    Ireland, T.C.2
  • 7
    • 0031164721 scopus 로고    scopus 로고
    • The causes of schedule instability in an automotive supply chain
    • Inman, R. R., and GONSALVEZ, D. J., 1997, The causes of schedule instability in an automotive supply chain.Production and Inventory Management Journal,38(2), 26-32.
    • (1997) Production and Inventory Management Journal , vol.38 , Issue.2 , pp. 26-32
    • Inman, R.R.1    Gonsalvez, D.J.2
  • 8
    • 0029389855 scopus 로고
    • Alternative approaches for reducing schedule instability in multistagemanufacturing under demand uncertainty
    • Kadipasaoglu, S., and SRIDHARAN, V., 1995, Alternative approaches for reducing schedule instability in multistagemanufacturing under demand uncertainty.Journal ofOperations Management,13, 193-211.
    • (1995) Journal ofOperations Management , vol.13 , pp. 193-211
    • Kadipasaoglu, S.1    Sridharan, V.2
  • 10
    • 0034333693 scopus 로고    scopus 로고
    • New lot sizing formulations for less nervous production schedules
    • Kazan, O., Nagi, R., and Rump, C. M., 2000, New lot sizing formulations for less nervous production schedules.Computersand Operations Research,27, 1325-1345.
    • (2000) Computersand Operations Research , vol.27 , pp. 1325-1345
    • Kazan, O.1    Nagi, R.2    Rump, C.M.3
  • 11
    • 0001694846 scopus 로고    scopus 로고
    • Stability measures for rolling schedules with applications to capacity expansion planning, master production scheduling, and lot sizing
    • Kimms, A., 1998, Stability measures for rolling schedules with applications to capacity expansion planning, master production scheduling, and lot sizing.Omega,26(3), 355-366.
    • (1998) Omega , vol.26 , Issue.3 , pp. 355-366
    • Kimms, A.1
  • 12
    • 0018517735 scopus 로고
    • Use of dynamic lot sizing to avoid system nervousnessin material requirements planning systems
    • Kropp, D. H., Carlson, R. C., and Jucker, J. V., 1979, Use of dynamic lot sizing to avoid system nervousnessin material requirements planning systems.Production andInventory Management,20(3), 49-58.
    • (1979) Production andInventory Management , vol.20 , Issue.3 , pp. 49-58
    • Kropp, D.H.1    Carlson, R.C.2    Jucker, J.V.3
  • 13
    • 0017417271 scopus 로고
    • Reschedule the reschedules you just rescheduled-way of life for MRP?
    • MATHER, H., 1977, Reschedule the reschedules you just rescheduled-way of life for MRP?Production and InventoryManagement,18(1), 60-79.
    • (1977) Production and InventoryManagement , vol.18 , Issue.1 , pp. 60-79
    • Mather, H.1
  • 14
    • 0027908825 scopus 로고
    • A method for achieving better customer service, lower costs, and less instability in master productionschedules
    • METTERS, R. D., 1993, A method for achieving better customer service, lower costs, and less instability in master productionschedules.Production and Inventory Management Journal,34(4),61-66.
    • (1993) Production and Inventory Management Journal , vol.34 , Issue.4 , pp. 61-66
    • Metters, R.D.1
  • 15
    • 0006038152 scopus 로고    scopus 로고
    • A comparison of production scheduling policies on costs, service levels, and schedule changes
    • METTERS, R. D., and VARGAS, V., 1999, A comparison of production scheduling policies on costs, service levels, and schedule changes.Production and Operations Management,8(1), 76-91.
    • (1999) Production and Operations Management , vol.8 , Issue.1 , pp. 76-91
    • Metters, R.D.1    Vargas, V.2
  • 17
    • 0000470092 scopus 로고
    • The impact of safety stock on schedule instability, cost, and service
    • SRIDHARAN, V., and LaForge, R. L., 1989, The impact of safety stock on schedule instability, cost, and service.Journal of Operations Management,8(4), 327-347.
    • (1989) Journal of Operations Management , vol.8 , Issue.4 , pp. 327-347
    • Sridharan, V.1    Laforge, R.L.2
  • 19
    • 0023404035 scopus 로고
    • Freezing the master production schedule under rollingplanning horizons
    • SRIDHARAN, V., BERRY, W., and UDAYABANU, V., 1987, Freezing the master production schedule under rollingplanning horizons.Management Science,33(9), 1137-1149.
    • (1987) Management Science , vol.33 , Issue.9 , pp. 1137-1149
    • Sridharan, V.1    Berry, W.2    Udayabanu, V.3
  • 20
    • 0016843112 scopus 로고
    • The nervous MRP system: How to do battle
    • STEELE, D. c., 1975, The nervous MRP system: how to do battle.Production and Inventory Management,16(4), 83-89.
    • (1975) Production and Inventory Management , vol.16 , Issue.4 , pp. 83-89
    • Steele, D.C.1
  • 21
    • 84989412809 scopus 로고
    • Materials requirements planning under uncertainty
    • Wybark, D. c., and WILLIAMS, J. G., 1976, Materials requirements planning under uncertainty.Decision Sciences,7(4), 595-606.
    • (1976) Decision Sciences , vol.7 , Issue.4 , pp. 595-606
    • Wybark, D.C.1    Williams, J.G.2
  • 22
    • 84884343507 scopus 로고
    • Lot sizing rules and freezing the master production schedulein material requirements planning systems under demanduncertainty
    • Zhao, X., Goodale, J. C., and Lee, T. S., 1995, Lot sizing rules and freezing the master production schedulein material requirements planning systems under demanduncertainty.International Journal of Production Research,33(8), 2241-2276.
    • (1995) International Journal of Production Research , vol.33 , Issue.8 , pp. 2241-2276
    • Zhao, X.1    Goodale, J.C.2    Lee, T.S.3
  • 23
    • 0035782485 scopus 로고    scopus 로고
    • Evaluation of safety stock methods in multilevel materials requirementsplanning (MRP) systems
    • Zhao, X., Lai, F., and Lee, T. S., 2001, Evaluation of safety stock methods in multilevel materials requirementsplanning (MRP) systems.Production Planning and Control,12(8), 798-803.
    • (2001) Production Planning and Control , vol.12 , Issue.8 , pp. 798-803
    • Zhao, X.1    Lai, F.2    Lee, T.S.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.