메뉴 건너뛰기




Volumn 4, Issue 1, 2009, Pages 1-18

Collective efficacy and manufacturing schedule instability: A study in Hong Kong and the Pearl River Delta region

Author keywords

Collective efficacy; Manufacturing logistics; Schedule nervousness; Supply chain

Indexed keywords

MANUFACTURE; PUBLIC RELATIONS; SALES; SUPPLY CHAINS;

EID: 57349148226     PISSN: 17485037     EISSN: 17485045     Source Type: Journal    
DOI: 10.1504/IJISE.2009.021676     Document Type: Article
Times cited : (11)

References (39)
  • 1
    • 0032258584 scopus 로고    scopus 로고
    • Simulation analysis of a manufacturing supply chain
    • Bhaskaran, S. (1998) 'Simulation analysis of a manufacturing supply chain', Decision Sciences, Vol. 29, No. 3, pp.633-657.
    • (1998) Decision Sciences , vol.29 , Issue.3 , pp. 633-657
    • Bhaskaran, S.1
  • 3
    • 0022693736 scopus 로고
    • A comparison of strategies to dampen nervousness in MRP systems
    • Blackburn, J.D., Kropp, D.H. and Millen, R.A. (1986) 'A comparison of strategies to dampen nervousness in MRP systems', Management Science Vol. 32, No. 4, pp.413-429.
    • (1986) Management Science , vol.32 , Issue.4 , pp. 413-429
    • Blackburn, J.D.1    Kropp, D.H.2    Millen, R.A.3
  • 5
    • 57349104882 scopus 로고    scopus 로고
    • China's manufacturing growth catches government's eye
    • January
    • Boisvert, M.M. (2005) 'China's manufacturing growth catches government's eye', SMT Magazine, January.
    • (2005) SMT Magazine
    • Boisvert, M.M.1
  • 6
    • 0018507737 scopus 로고
    • Less nervousness MRP systems: A dynamic economic lot-sizing approach
    • Carlson, C.J., Jucker, J.V. and Kropp, D.H. (1979) 'Less nervousness MRP systems: A dynamic economic lot-sizing approach', Management Science Vol. 25, No. 8, pp.754-761.
    • (1979) Management Science , vol.25 , Issue.8 , pp. 754-761
    • Carlson, C.J.1    Jucker, J.V.2    Kropp, D.H.3
  • 7
    • 0032659102 scopus 로고    scopus 로고
    • Strategically managed buyer-supplier relationships and performance outcomes
    • Carr, A.S. and Pearson, J.N. (1999) 'Strategically managed buyer-supplier relationships and performance outcomes', Journals of Operations Management, Vol. 17, pp.497-519.
    • (1999) Journals of Operations Management , vol.17 , pp. 497-519
    • Carr, A.S.1    Pearson, J.N.2
  • 8
    • 18844430559 scopus 로고    scopus 로고
    • Competitive strategies and manufacturing logistics- an empirical study of Hong Kong manufacturers
    • Chan, J.W.K. (2003) 'Competitive strategies and manufacturing logistics- an empirical study of Hong Kong manufacturers', International Journal of Physical Distribution and Logistics Management, 2005, Vol. 35, No. 1, p.20.
    • (2003) International Journal of Physical Distribution and Logistics Management , vol.35 , Issue.1 , pp. 20
    • Chan, J.W.K.1
  • 9
    • 0031271989 scopus 로고    scopus 로고
    • Nervousness in inventory management: Comparison of basic control rules
    • De Kok, T. and Inderfurth, K. (1997) 'Nervousness in inventory management: Comparison of basic control rules', European Journal of Operational Research, Vol. 103, pp.55-82.
    • (1997) European Journal of Operational Research , vol.103 , pp. 55-82
    • De Kok, T.1    Inderfurth, K.2
  • 10
    • 0000812836 scopus 로고    scopus 로고
    • Effects of leader role, team-set goal difficulty, efficacy, and tactics on team effectiveness
    • Durham, C.C., Don, K. and Edwin, A.L. (1997) 'Effects of leader role, team-set goal difficulty, efficacy, and tactics on team effectiveness', Organizational Behavior and Human Decision Processes, Vol. 72, No. 2, pp.203-231.
    • (1997) Organizational Behavior and Human Decision Processes , vol.72 , Issue.2 , pp. 203-231
    • Durham, C.C.1    Don, K.2    Edwin, A.L.3
  • 11
    • 0001896737 scopus 로고
    • A managerial guideline for the development and implementation of purchasing partnerships
    • Ellram, L.M. (1991) 'A managerial guideline for the development and implementation of purchasing partnerships', International Journal of Purchasing and Materials Management, Vol. 27, No. 2, pp.2-8.
    • (1991) International Journal of Purchasing and Materials Management , vol.27 , Issue.2 , pp. 2-8
    • Ellram, L.M.1
  • 12
    • 0035979625 scopus 로고    scopus 로고
    • Comparison of (s, S) and (s, nQ) inventory control rules with respect to planning stability
    • Heisig, G. (2001) 'Comparison of (s, S) and (s, nQ) inventory control rules with respect to planning stability', International Journal of Production Economics, Vol. 73, pp.59-82.
    • (2001) International Journal of Production Economics , vol.73 , pp. 59-82
    • Heisig, G.1
  • 13
    • 0031236227 scopus 로고    scopus 로고
    • Using judgmental anchors to establish challenging self-set goals without jeopardizing commitment
    • September, pp
    • Hinsz, V.B., Kalnbach, L.R. and Lorentz, N.R. (1997) 'Using judgmental anchors to establish challenging self-set goals without jeopardizing commitment', Organizational Behavior and Human Decision Processes, Vol. 71, No. 3, September, pp.287-308.
    • (1997) Organizational Behavior and Human Decision Processes , vol.71 , Issue.3 , pp. 287-308
    • Hinsz, V.B.1    Kalnbach, L.R.2    Lorentz, N.R.3
  • 14
    • 0031164721 scopus 로고    scopus 로고
    • The causes of schedule instability in an automotive supply chain
    • Inman, R.R. and Gonsalvez, D.J. (1997) 'The causes of schedule instability in an automotive supply chain', Production and Inventory Management Journal, Vol. 38, No. 2, pp.26-32.
    • (1997) Production and Inventory Management Journal , vol.38 , Issue.2 , pp. 26-32
    • Inman, R.R.1    Gonsalvez, D.J.2
  • 15
    • 0027624161 scopus 로고
    • Measuring and improving planning stability of reorder-point lot-sizing policies
    • Vols
    • Jensen, T. (1993) 'Measuring and improving planning stability of reorder-point lot-sizing policies', International Journal of Production Economics, Vols. 30-31, pp.167-178.
    • (1993) International Journal of Production Economics , vol.30-31 , pp. 167-178
    • Jensen, T.1
  • 16
    • 57349154858 scopus 로고    scopus 로고
    • An improved metric for measuring multi-item multi-level schedule instability under rolling schedules
    • In Press
    • Kabak, K.E. and Ornek, A.M. (2007) 'An improved metric for measuring multi-item multi-level schedule instability under rolling schedules', Computers & Industrial Engineering, (In Press).
    • (2007) Computers & Industrial Engineering
    • Kabak, K.E.1    Ornek, A.M.2
  • 17
    • 0029389855 scopus 로고
    • Alternative approaches for reducing schedule instability in multistage manufacturing under demand uncertainty
    • Kadipasaoglu, S. and Sridharan, V. (1995) 'Alternative approaches for reducing schedule instability in multistage manufacturing under demand uncertainty', Journal of Operations Management, Vol. 3, pp.193-211.
    • (1995) Journal of Operations Management , vol.3 , pp. 193-211
    • Kadipasaoglu, S.1    Sridharan, V.2
  • 18
    • 0029371175 scopus 로고
    • The effect of freezing the master production schedule on cost in multilevel MRP systems
    • Kadipasaoglu, S.N (1995) 'The effect of freezing the master production schedule on cost in multilevel MRP systems', Production and Inventory Management Journal, Vol. 36, No. 3, p.30.
    • (1995) Production and Inventory Management Journal , vol.36 , Issue.3 , pp. 30
    • Kadipasaoglu, S.N.1
  • 19
    • 0034333693 scopus 로고    scopus 로고
    • New lot-sizing formulations for less nervous production schedules
    • Kazan, O., Nagi, R. and Rump, C.M. (2000) 'New lot-sizing formulations for less nervous production schedules', Computers and Operations Research, Vol. 27, pp.1325-1345.
    • (2000) Computers and Operations Research , vol.27 , pp. 1325-1345
    • Kazan, O.1    Nagi, R.2    Rump, C.M.3
  • 21
    • 57349113464 scopus 로고    scopus 로고
    • Stability measures for rolling schedule with applications to capacity expansion planning, master production scheduling and lot sizing
    • Kimms, A (1998) 'Stability measures for rolling schedule with applications to capacity expansion planning, master production scheduling and lot sizing', International Journal of Management Science, Vol. 6, pp.355-366.
    • (1998) International Journal of Management Science , vol.6 , pp. 355-366
    • Kimms, A.1
  • 22
    • 19944400423 scopus 로고    scopus 로고
    • Responding to schedule changes in build-to-order supply chains
    • Krajewski, L., Wei, J.C. and Tang, L. (2005) 'Responding to schedule changes in build-to-order supply chains', Journal of Operations Management, Vol. 23, pp.452-469.
    • (2005) Journal of Operations Management , vol.23 , pp. 452-469
    • Krajewski, L.1    Wei, J.C.2    Tang, L.3
  • 24
    • 10444270256 scopus 로고    scopus 로고
    • The impact of setup cost, commonality, and capacity on schedule instability: An exploratory study
    • Meixell, M. (2005) 'The impact of setup cost, commonality, and capacity on schedule instability: An exploratory study', International Journal of Production Economics, Vol. 95, pp.95-107.
    • (2005) International Journal of Production Economics , vol.95 , pp. 95-107
    • Meixell, M.1
  • 25
    • 0027908825 scopus 로고
    • A method for achieving better customer service, lower costs, and less instability in master production schedules
    • Metters, R.D. (1993) 'A method for achieving better customer service, lower costs, and less instability in master production schedules', Production and Inventory Management Journal, Vol. 34, No. 4, pp.61-66.
    • (1993) Production and Inventory Management Journal , vol.34 , Issue.4 , pp. 61-66
    • Metters, R.D.1
  • 26
    • 34447296449 scopus 로고    scopus 로고
    • Stability-oriented evaluation of rescheduling strategies, by using simulation
    • paper accepted in 2006, In print
    • Pfeiffer, A., Kadar, B. and Monostori, L. (paper accepted in 2006) 'Stability-oriented evaluation of rescheduling strategies, by using simulation', Computers in Industry (In print).
    • Computers in Industry
    • Pfeiffer, A.1    Kadar, B.2    Monostori, L.3
  • 27
    • 0030547466 scopus 로고    scopus 로고
    • A motivational investigation of group effectiveness using social-cognitive theory
    • Washington, April, p
    • Prussia, G.E and Kinicki, A.J. (1996) 'A motivational investigation of group effectiveness using social-cognitive theory', Journal of Applied Psychology, Washington, Vol. 81, No. 2, April, p.187.
    • (1996) Journal of Applied Psychology , vol.81 , Issue.2 , pp. 187
    • Prussia, G.E.1    Kinicki, A.J.2
  • 28
    • 4444220587 scopus 로고    scopus 로고
    • Schedule nervousness in a manufacturing system: A case study
    • Pujawan, I.N. (2004) 'Schedule nervousness in a manufacturing system: A case study', Production Planning and Control, Vol. 15, No. 5, pp.515-524.
    • (2004) Production Planning and Control , vol.15 , Issue.5 , pp. 515-524
    • Pujawan, I.N.1
  • 30
    • 0000470092 scopus 로고
    • The impact of safety stock on schedule instability, cost, and service
    • Sridharan, V. and Laforge, R.L. (1989) 'The impact of safety stock on schedule instability, cost, and service', Journal of Operations Management, Vol. 8, No. 4, pp.327-347.
    • (1989) Journal of Operations Management , vol.8 , Issue.4 , pp. 327-347
    • Sridharan, V.1    Laforge, R.L.2
  • 33
    • 84965459141 scopus 로고
    • Meta-analysis of the antecedents of personal goal level
    • September, p
    • Wofford, J.C., Goodwin, V.L. and Premack, S. (1992) 'Meta-analysis of the antecedents of personal goal level', Journal of Management, Vol. 18, No. 3, September, p.595.
    • (1992) Journal of Management , vol.18 , Issue.3 , pp. 595
    • Wofford, J.C.1    Goodwin, V.L.2    Premack, S.3
  • 35
    • 2042547387 scopus 로고    scopus 로고
    • Impact of forecasting error on the performance of capacitated multi-item production systems
    • Xie, J., Lee, T.S. and Zhao, X. (2004) 'Impact of forecasting error on the performance of capacitated multi-item production systems', Computers and Industrial Engineering, Vol. 46, pp.205-219.
    • (2004) Computers and Industrial Engineering , vol.46 , pp. 205-219
    • Xie, J.1    Lee, T.S.2    Zhao, X.3
  • 36
    • 0037464628 scopus 로고    scopus 로고
    • Freezing the master production schedule under single resource constraint and demand uncertainty
    • Xie, J., Zhao, X. and Lee, T.S. (2003) 'Freezing the master production schedule under single resource constraint and demand uncertainty', International Journal of Production Economics. Vol. 83, pp.65-84.
    • (2003) International Journal of Production Economics , vol.83 , pp. 65-84
    • Xie, J.1    Zhao, X.2    Lee, T.S.3
  • 37
    • 0027612429 scopus 로고
    • Freezing the master production schedule for material requirements planning systems under demand uncertainty
    • Zhao, X. and Lee, T.S. (1993) 'Freezing the master production schedule for material requirements planning systems under demand uncertainty', Journal of Operations Management, Vol. 11, No. 2, p.185.
    • (1993) Journal of Operations Management , vol.11 , Issue.2 , pp. 185
    • Zhao, X.1    Lee, T.S.2
  • 38
    • 84884343507 scopus 로고
    • Lot-sizing rules and freezing the master production schedule in material requirements planning systems under demand uncertainty
    • Zhao, X., Goodale, J.C. and Lee, T.S. (1995) 'Lot-sizing rules and freezing the master production schedule in material requirements planning systems under demand uncertainty', International Journal of Production Research, Vol. 33, No. 8, pp.2241-2276.
    • (1995) International Journal of Production Research , vol.33 , Issue.8 , pp. 2241-2276
    • Zhao, X.1    Goodale, J.C.2    Lee, T.S.3
  • 39
    • 0012315837 scopus 로고    scopus 로고
    • Lot-sizing rule and freezing the master production schedule under capacity constraint and deterministic demand
    • Zhao, X., Xie, J. and Jiang, Q. (2001) 'Lot-sizing rule and freezing the master production schedule under capacity constraint and deterministic demand', Production and Operations Management, Vol. 10, No. 1, pp.45-67.
    • (2001) Production and Operations Management , vol.10 , Issue.1 , pp. 45-67
    • Zhao, X.1    Xie, J.2    Jiang, Q.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.