A comparison of strategies to dampen nervousness in MRP systems
-
Blackburn, J.D., Kropp, D.H., and Millen, R.A. (1986), "A comparison of strategies to dampen nervousness in MRP systems", Management Science 32, 413-429.
-
(1986)
Management Science
, vol.32
, pp. 413-429
-
-
Blackburn, J.D.1
Kropp, D.H.2
Millen, R.A.3
-
2
-
-
0023532189
-
Alternative approaches to schedule instability: A comparative analysis
-
Blackburn, J.D., Kropp, D.H., and Millen, R.A. (1987), "Alternative approaches to schedule instability: A comparative analysis", International Journal of Production Research 25, 1739-1749.
-
(1987)
International Journal of Production Research
, vol.25
, pp. 1739-1749
-
-
Blackburn, J.D.1
Kropp, D.H.2
Millen, R.A.3
-
3
-
-
0003572913
-
Computational results for a dam problem with variable release rate and service level contraints
-
De Kok, A.G. (1985), "Computational results for a dam problem with variable release rate and service level contraints", Communications in Statistics-Stochastic Models 1, 291-315.
-
(1985)
Communications in Statistics-Stochastic Models
, vol.1
, pp. 291-315
-
-
De Kok, A.G.1
-
5
-
-
0000491653
-
Nervousness in inventory control: Analytical results
-
Inderfurth, K. (1994), "Nervousness in inventory control: Analytical results", OR Spektrum 16, 113-123.
-
(1994)
OR Spektrum
, vol.16
, pp. 113-123
-
-
Inderfurth, K.1
-
6
-
-
0027624161
-
Measuring and improving planning stability of reorder-point lot-sizing policies
-
Jensen, T. (1993), "Measuring and improving planning stability of reorder-point lot-sizing policies", International Journal of Production Economics 30-31, 167-178.
-
(1993)
International Journal of Production Economics
, vol.30-31
, pp. 167-178
-
-
Jensen, T.1
-
8
-
-
0029389855
-
Alternative approaches for reducing schedule instability in multistage manufacturing under demand uncertainty
-
Kadipasaoglu, S.N., and Sridharan, V. (1995), "Alternative approaches for reducing schedule instability in multistage manufacturing under demand uncertainty", International Journal of Operations Management 13, 193-211.
-
(1995)
International Journal of Operations Management
, vol.13
, pp. 193-211
-
-
Kadipasaoglu, S.N.1
Sridharan, V.2
-
10
-
-
0021373333
-
A lot-sizing algorithm for reducing nervousness in MRP systems
-
Kropp, D.H., and Carlson, R.C. (1984), "A lot-sizing algorithm for reducing nervousness in MRP systems", Management Science 30, 240-244.
-
(1984)
Management Science
, vol.30
, pp. 240-244
-
-
Kropp, D.H.1
Carlson, R.C.2
-
11
-
-
84989427471
-
Heuristic lot-sizing approaches for dealing with MRP system nervousness
-
Kropp, D.H., Carlson, R.C., and Jucker, J.V. (1983), "Heuristic lot-sizing approaches for dealing with MRP system nervousness", Decision Science 14, 156-169.
-
(1983)
Decision Science
, vol.14
, pp. 156-169
-
-
Kropp, D.H.1
Carlson, R.C.2
Jucker, J.V.3
-
12
-
-
0027642329
-
Optimal positioning of safety stocks in MRP
-
Lagodimos, A.G., and Anderson, E.J. (1993), "Optimal positioning of safety stocks in MRP", International Journal of Production Research 31, 1797-1813.
-
(1993)
International Journal of Production Research
, vol.31
, pp. 1797-1813
-
-
Lagodimos, A.G.1
Anderson, E.J.2
-
13
-
-
0025206966
-
Interaction effects on MRP nervousness
-
Minifie, J.R., and Davis, R.A. (1990), "Interaction effects on MRP nervousness", International Journal of Production Research 28, 173-183.
-
(1990)
International Journal of Production Research
, vol.28
, pp. 173-183
-
-
Minifie, J.R.1
Davis, R.A.2
-
14
-
-
84985855322
-
Measuring master production schedule stability under rolling planning horizons
-
Sridharan, S.V., Berry, W.L., and Udayabhanu, V. (1988), "Measuring master production schedule stability under rolling planning horizons", Decision Science 19, 147-166.
-
(1988)
Decision Science
, vol.19
, pp. 147-166
-
-
Sridharan, S.V.1
Berry, W.L.2
Udayabhanu, V.3
-
15
-
-
0025399203
-
Master production scheduling make-to-stock products: A framework analysis
-
Sridharan, S.V., and Berry, W.L. (1990), "Master production scheduling make-to-stock products: A framework analysis", International Journal of Production Research 28, 541-558.
-
(1990)
International Journal of Production Research
, vol.28
, pp. 541-558
-
-
Sridharan, S.V.1
Berry, W.L.2
-
16
-
-
0000470092
-
The impact of safety stock on schedule stability, cost, and service
-
Sridharan, S.V., and LaForge, R.L. (1989), "The impact of safety stock on schedule stability, cost, and service", Journal of Operations Management 8, 327-347.
-
(1989)
Journal of Operations Management
, vol.8
, pp. 327-347
-
-
Sridharan, S.V.1
LaForge, R.L.2
-
17
-
-
0002684530
-
An analysis of alternative policies to achieve schedule stability
-
Sridharan, S.V., and LaForge, R.L. (1990), "An analysis of alternative policies to achieve schedule stability", Journal of Manufacturing and Operations Management 3, 53-73.
-
(1990)
Journal of Manufacturing and Operations Management
, vol.3
, pp. 53-73
-
-
Sridharan, S.V.1
LaForge, R.L.2
-
19
-
-
0003929853
-
-
Irwin, Homewood, IL
-
Vollmann, T.E., Berry, W.L., and Whybark, D.C. (1988), Manufacturing Planning and Control Systems, 2nd Ed., Irwin, Homewood, IL.
-
(1988)
Manufacturing Planning and Control Systems, 2nd Ed.
-
-
Vollmann, T.E.1
Berry, W.L.2
Whybark, D.C.3
-
20
-
-
0023288994
-
Interaction between frequency of rescheduling and the role of safety stock in material requirements planning systems
-
Yano, C.A., and Carlson, R.C. (1987), "Interaction between frequency of rescheduling and the role of safety stock in material requirements planning systems" International Journal of Production Research 25, 221-232.
-
(1987)
International Journal of Production Research
, vol.25
, pp. 221-232
-
-
Yano, C.A.1
Carlson, R.C.2
|