메뉴 건너뛰기




Volumn 38, Issue 6, 2010, Pages 522-527

Batching for work and rework processes on dedicated facilities to minimize the makespan

Author keywords

Batching; Production; Reverse logistics; Rework

Indexed keywords

INSPECTION; LINEAR PROGRAMMING;

EID: 77952548983     PISSN: 03050483     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.omega.2010.01.002     Document Type: Article
Times cited : (18)

References (29)
  • 2
    • 0000994184 scopus 로고
    • A comparative study of lot streaming procedures
    • Baker K.R., Jia D. A comparative study of lot streaming procedures. Omega 1993, 21:561-566.
    • (1993) Omega , vol.21 , pp. 561-566
    • Baker, K.R.1    Jia, D.2
  • 3
    • 33747026665 scopus 로고    scopus 로고
    • Optimizing a production system with rework and equal sized batch shipments
    • Buscher U., Lindner G. Optimizing a production system with rework and equal sized batch shipments. Computers and Operations Research 2007, 34:515-535.
    • (2007) Computers and Operations Research , vol.34 , pp. 515-535
    • Buscher, U.1    Lindner, G.2
  • 4
    • 15344350131 scopus 로고    scopus 로고
    • Cost models for lot streaming in a multistage flow shop
    • Chiu H.N., Chang J.H. Cost models for lot streaming in a multistage flow shop. Omega 2005, 33:435-450.
    • (2005) Omega , vol.33 , pp. 435-450
    • Chiu, H.N.1    Chang, J.H.2
  • 5
    • 34247863936 scopus 로고    scopus 로고
    • Optimal production lot sizing with rework, scrap rate, and service level constraint
    • Chiu S.W., Ting C.-K., Chiu Y.-S.P. Optimal production lot sizing with rework, scrap rate, and service level constraint. Mathematical and Computer Modelling 2007, 46:535-549.
    • (2007) Mathematical and Computer Modelling , vol.46 , pp. 535-549
    • Chiu, S.W.1    Ting, C.-K.2    Chiu, Y.-S.P.3
  • 9
    • 0034394639 scopus 로고    scopus 로고
    • A characterisation of logistics networks for product recovery
    • Fleischmann M., Krikke H.R., Dekker R., Flapper S.D.P. A characterisation of logistics networks for product recovery. Omega 2000, 28:653-666.
    • (2000) Omega , vol.28 , pp. 653-666
    • Fleischmann, M.1    Krikke, H.R.2    Dekker, R.3    Flapper, S.D.P.4
  • 10
    • 85168789411 scopus 로고
    • Gitlow H, Gitlow S, Oppenheim A, Oppenheim R. Tools and methods for the improvement of quality. Boston: Irwin;
    • Gitlow H, Gitlow S, Oppenheim A, Oppenheim R. Tools and methods for the improvement of quality. Boston: Irwin; 1989.
    • (1989)
  • 12
    • 0346307242 scopus 로고    scopus 로고
    • Employee scheduling and makespan minimization in a flow shop with multi-processor work stations: a case study
    • Huq F., Cutright K., Martin C. Employee scheduling and makespan minimization in a flow shop with multi-processor work stations: a case study. Omega 2004, 32:121-129.
    • (2004) Omega , vol.32 , pp. 121-129
    • Huq, F.1    Cutright, K.2    Martin, C.3
  • 14
    • 37849187306 scopus 로고    scopus 로고
    • Cost minimizing scheduling of work and rework processes on a single facility under deterioration of reworkables
    • Inderfurth K., Kovalyov M.Y., Ng C.T., Werner F. Cost minimizing scheduling of work and rework processes on a single facility under deterioration of reworkables. International Journal of Production Economics 2007, 105:345-356.
    • (2007) International Journal of Production Economics , vol.105 , pp. 345-356
    • Inderfurth, K.1    Kovalyov, M.Y.2    Ng, C.T.3    Werner, F.4
  • 15
    • 27344460910 scopus 로고    scopus 로고
    • Production planning and control of closed-loop supply chains
    • Carnegie Mellon University Press, V.D.R. Guide, L.N. van Wassenhove (Eds.)
    • Inderfurth K., Teunter R.H. Production planning and control of closed-loop supply chains. Business perspectives on closed-loop supply chains 2003, 149-173. Carnegie Mellon University Press. V.D.R. Guide, L.N. van Wassenhove (Eds.).
    • (2003) Business perspectives on closed-loop supply chains , pp. 149-173
    • Inderfurth, K.1    Teunter, R.H.2
  • 16
    • 51249181779 scopus 로고
    • New polynomial-time algorithm for linear programming
    • Karmarkar N. New polynomial-time algorithm for linear programming. Combinatorica 1984, 4:373-395.
    • (1984) Combinatorica , vol.4 , pp. 373-395
    • Karmarkar, N.1
  • 17
    • 85168785772 scopus 로고    scopus 로고
    • An optimal lot and batch size policy for a single item produced and remanufactured on one machine. Working paper 10/2001, Faculty of Economics and Management, Otto-von-Guericke-University Magdeburg, Germany;
    • Lindner G, Buscher U, Flapper SDP. An optimal lot and batch size policy for a single item produced and remanufactured on one machine. Working paper 10/2001, Faculty of Economics and Management, Otto-von-Guericke-University Magdeburg, Germany; 2001.
    • (2001)
    • Lindner, G.1    Buscher, U.2    Flapper, S.D.P.3
  • 18
    • 0042091890 scopus 로고    scopus 로고
    • Optimal lot sizing in an imperfect production system with homogeneous reworkable jobs
    • Liu J.J., Yang P. Optimal lot sizing in an imperfect production system with homogeneous reworkable jobs. European Journal of Operational Research 1996, 91:517-527.
    • (1996) European Journal of Operational Research , vol.91 , pp. 517-527
    • Liu, J.J.1    Yang, P.2
  • 19
    • 44849088760 scopus 로고    scopus 로고
    • A hybrid genetic algorithm/mathematical programming approach to the multi-family flowshop scheduling problem with lot streaming
    • Martin C.H. A hybrid genetic algorithm/mathematical programming approach to the multi-family flowshop scheduling problem with lot streaming. Omega 2009, 37:126-137.
    • (2009) Omega , vol.37 , pp. 126-137
    • Martin, C.H.1
  • 20
    • 27344443291 scopus 로고    scopus 로고
    • Lotsizing decisions in product recovery management
    • Springer, Berlin, R. Dekker, M. Fleischmann, K. Inderfurth, L.N. van Wassenhove (Eds.)
    • Minner S., Lindner G. Lotsizing decisions in product recovery management. Reverse logistics-quantitative models for closed-loop supply chains 2004, 157-179. Springer, Berlin. R. Dekker, M. Fleischmann, K. Inderfurth, L.N. van Wassenhove (Eds.).
    • (2004) Reverse logistics-quantitative models for closed-loop supply chains , pp. 157-179
    • Minner, S.1    Lindner, G.2
  • 23
    • 84974861854 scopus 로고
    • Integrating scheduling with batching and lot-sizing: a review of algorithms and complexity
    • Potts C.N., van Wassenhove L.N. Integrating scheduling with batching and lot-sizing: a review of algorithms and complexity. Journal of the Operational Research Society 1992, 43:395-406.
    • (1992) Journal of the Operational Research Society , vol.43 , pp. 395-406
    • Potts, C.N.1    van Wassenhove, L.N.2
  • 24
    • 0022676316 scopus 로고
    • Economic production cycles with imperfect production processes
    • Rosenblatt M.J., Lee H.L. Economic production cycles with imperfect production processes. IIE Transactions 1986, 18:48-55.
    • (1986) IIE Transactions , vol.18 , pp. 48-55
    • Rosenblatt, M.J.1    Lee, H.L.2
  • 26
    • 40649106449 scopus 로고    scopus 로고
    • Decision support system for the batching problems of steelmaking and continuous-casting production
    • Tang L., Wang G. Decision support system for the batching problems of steelmaking and continuous-casting production. Omega 2008, 36:976-991.
    • (2008) Omega , vol.36 , pp. 976-991
    • Tang, L.1    Wang, G.2
  • 27
    • 1342332973 scopus 로고    scopus 로고
    • Lot-sizing for a single-stage single-product production system with rework of perishable production defectives
    • Teunter R.H., Flapper S.D.P. Lot-sizing for a single-stage single-product production system with rework of perishable production defectives. OR Spectrum 2003, 25:85-96.
    • (2003) OR Spectrum , vol.25 , pp. 85-96
    • Teunter, R.H.1    Flapper, S.D.P.2
  • 28
    • 44649150151 scopus 로고    scopus 로고
    • Multi-product economic lot scheduling problem with separate production lines for manufacturing and remanufacturing
    • Teunter R., Kaparis K., Tang O. Multi-product economic lot scheduling problem with separate production lines for manufacturing and remanufacturing. European Journal of Operational Research 2008, 191:1241-1253.
    • (2008) European Journal of Operational Research , vol.191 , pp. 1241-1253
    • Teunter, R.1    Kaparis, K.2    Tang, O.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.