-
1
-
-
36849082395
-
A survey of scheduling problems with setup times or costs
-
Allahverdi A., Ng C.T., Cheng T.C.E., Kovalyov M.Y. A survey of scheduling problems with setup times or costs. European Journal of Operational Research 2008, 187:985-1032.
-
(2008)
European Journal of Operational Research
, vol.187
, pp. 985-1032
-
-
Allahverdi, A.1
Ng, C.T.2
Cheng, T.C.E.3
Kovalyov, M.Y.4
-
2
-
-
0000994184
-
A comparative study of lot streaming procedures
-
Baker K.R., Jia D. A comparative study of lot streaming procedures. Omega 1993, 21:561-566.
-
(1993)
Omega
, vol.21
, pp. 561-566
-
-
Baker, K.R.1
Jia, D.2
-
3
-
-
33747026665
-
Optimizing a production system with rework and equal sized batch shipments
-
Buscher U., Lindner G. Optimizing a production system with rework and equal sized batch shipments. Computers and Operations Research 2007, 34:515-535.
-
(2007)
Computers and Operations Research
, vol.34
, pp. 515-535
-
-
Buscher, U.1
Lindner, G.2
-
4
-
-
15344350131
-
Cost models for lot streaming in a multistage flow shop
-
Chiu H.N., Chang J.H. Cost models for lot streaming in a multistage flow shop. Omega 2005, 33:435-450.
-
(2005)
Omega
, vol.33
, pp. 435-450
-
-
Chiu, H.N.1
Chang, J.H.2
-
5
-
-
34247863936
-
Optimal production lot sizing with rework, scrap rate, and service level constraint
-
Chiu S.W., Ting C.-K., Chiu Y.-S.P. Optimal production lot sizing with rework, scrap rate, and service level constraint. Mathematical and Computer Modelling 2007, 46:535-549.
-
(2007)
Mathematical and Computer Modelling
, vol.46
, pp. 535-549
-
-
Chiu, S.W.1
Ting, C.-K.2
Chiu, Y.-S.P.3
-
7
-
-
0036275691
-
Planning and control of rework in the process industries: a review
-
Flapper S.D.P., Fransoo J.C., Broekmeulen R.A.C.M., Inderfurth K. Planning and control of rework in the process industries: a review. Production Planning and Control 2002, 1:26-34.
-
(2002)
Production Planning and Control
, vol.1
, pp. 26-34
-
-
Flapper, S.D.P.1
Fransoo, J.C.2
Broekmeulen, R.A.C.M.3
Inderfurth, K.4
-
9
-
-
0034394639
-
A characterisation of logistics networks for product recovery
-
Fleischmann M., Krikke H.R., Dekker R., Flapper S.D.P. A characterisation of logistics networks for product recovery. Omega 2000, 28:653-666.
-
(2000)
Omega
, vol.28
, pp. 653-666
-
-
Fleischmann, M.1
Krikke, H.R.2
Dekker, R.3
Flapper, S.D.P.4
-
10
-
-
85168789411
-
-
Gitlow H, Gitlow S, Oppenheim A, Oppenheim R. Tools and methods for the improvement of quality. Boston: Irwin;
-
Gitlow H, Gitlow S, Oppenheim A, Oppenheim R. Tools and methods for the improvement of quality. Boston: Irwin; 1989.
-
(1989)
-
-
-
12
-
-
0346307242
-
Employee scheduling and makespan minimization in a flow shop with multi-processor work stations: a case study
-
Huq F., Cutright K., Martin C. Employee scheduling and makespan minimization in a flow shop with multi-processor work stations: a case study. Omega 2004, 32:121-129.
-
(2004)
Omega
, vol.32
, pp. 121-129
-
-
Huq, F.1
Cutright, K.2
Martin, C.3
-
13
-
-
27344450114
-
Batching work and rework processes with limited deterioration of reworkables
-
Inderfurth K., Janiak A., Kovalyov M.Y., Werner F. Batching work and rework processes with limited deterioration of reworkables. Computers and Operations Research 2006, 33:1595-1605.
-
(2006)
Computers and Operations Research
, vol.33
, pp. 1595-1605
-
-
Inderfurth, K.1
Janiak, A.2
Kovalyov, M.Y.3
Werner, F.4
-
14
-
-
37849187306
-
Cost minimizing scheduling of work and rework processes on a single facility under deterioration of reworkables
-
Inderfurth K., Kovalyov M.Y., Ng C.T., Werner F. Cost minimizing scheduling of work and rework processes on a single facility under deterioration of reworkables. International Journal of Production Economics 2007, 105:345-356.
-
(2007)
International Journal of Production Economics
, vol.105
, pp. 345-356
-
-
Inderfurth, K.1
Kovalyov, M.Y.2
Ng, C.T.3
Werner, F.4
-
15
-
-
27344460910
-
Production planning and control of closed-loop supply chains
-
Carnegie Mellon University Press, V.D.R. Guide, L.N. van Wassenhove (Eds.)
-
Inderfurth K., Teunter R.H. Production planning and control of closed-loop supply chains. Business perspectives on closed-loop supply chains 2003, 149-173. Carnegie Mellon University Press. V.D.R. Guide, L.N. van Wassenhove (Eds.).
-
(2003)
Business perspectives on closed-loop supply chains
, pp. 149-173
-
-
Inderfurth, K.1
Teunter, R.H.2
-
16
-
-
51249181779
-
New polynomial-time algorithm for linear programming
-
Karmarkar N. New polynomial-time algorithm for linear programming. Combinatorica 1984, 4:373-395.
-
(1984)
Combinatorica
, vol.4
, pp. 373-395
-
-
Karmarkar, N.1
-
17
-
-
85168785772
-
-
An optimal lot and batch size policy for a single item produced and remanufactured on one machine. Working paper 10/2001, Faculty of Economics and Management, Otto-von-Guericke-University Magdeburg, Germany;
-
Lindner G, Buscher U, Flapper SDP. An optimal lot and batch size policy for a single item produced and remanufactured on one machine. Working paper 10/2001, Faculty of Economics and Management, Otto-von-Guericke-University Magdeburg, Germany; 2001.
-
(2001)
-
-
Lindner, G.1
Buscher, U.2
Flapper, S.D.P.3
-
18
-
-
0042091890
-
Optimal lot sizing in an imperfect production system with homogeneous reworkable jobs
-
Liu J.J., Yang P. Optimal lot sizing in an imperfect production system with homogeneous reworkable jobs. European Journal of Operational Research 1996, 91:517-527.
-
(1996)
European Journal of Operational Research
, vol.91
, pp. 517-527
-
-
Liu, J.J.1
Yang, P.2
-
19
-
-
44849088760
-
A hybrid genetic algorithm/mathematical programming approach to the multi-family flowshop scheduling problem with lot streaming
-
Martin C.H. A hybrid genetic algorithm/mathematical programming approach to the multi-family flowshop scheduling problem with lot streaming. Omega 2009, 37:126-137.
-
(2009)
Omega
, vol.37
, pp. 126-137
-
-
Martin, C.H.1
-
20
-
-
27344443291
-
Lotsizing decisions in product recovery management
-
Springer, Berlin, R. Dekker, M. Fleischmann, K. Inderfurth, L.N. van Wassenhove (Eds.)
-
Minner S., Lindner G. Lotsizing decisions in product recovery management. Reverse logistics-quantitative models for closed-loop supply chains 2004, 157-179. Springer, Berlin. R. Dekker, M. Fleischmann, K. Inderfurth, L.N. van Wassenhove (Eds.).
-
(2004)
Reverse logistics-quantitative models for closed-loop supply chains
, pp. 157-179
-
-
Minner, S.1
Lindner, G.2
-
23
-
-
84974861854
-
Integrating scheduling with batching and lot-sizing: a review of algorithms and complexity
-
Potts C.N., van Wassenhove L.N. Integrating scheduling with batching and lot-sizing: a review of algorithms and complexity. Journal of the Operational Research Society 1992, 43:395-406.
-
(1992)
Journal of the Operational Research Society
, vol.43
, pp. 395-406
-
-
Potts, C.N.1
van Wassenhove, L.N.2
-
24
-
-
0022676316
-
Economic production cycles with imperfect production processes
-
Rosenblatt M.J., Lee H.L. Economic production cycles with imperfect production processes. IIE Transactions 1986, 18:48-55.
-
(1986)
IIE Transactions
, vol.18
, pp. 48-55
-
-
Rosenblatt, M.J.1
Lee, H.L.2
-
26
-
-
40649106449
-
Decision support system for the batching problems of steelmaking and continuous-casting production
-
Tang L., Wang G. Decision support system for the batching problems of steelmaking and continuous-casting production. Omega 2008, 36:976-991.
-
(2008)
Omega
, vol.36
, pp. 976-991
-
-
Tang, L.1
Wang, G.2
-
27
-
-
1342332973
-
Lot-sizing for a single-stage single-product production system with rework of perishable production defectives
-
Teunter R.H., Flapper S.D.P. Lot-sizing for a single-stage single-product production system with rework of perishable production defectives. OR Spectrum 2003, 25:85-96.
-
(2003)
OR Spectrum
, vol.25
, pp. 85-96
-
-
Teunter, R.H.1
Flapper, S.D.P.2
-
28
-
-
44649150151
-
Multi-product economic lot scheduling problem with separate production lines for manufacturing and remanufacturing
-
Teunter R., Kaparis K., Tang O. Multi-product economic lot scheduling problem with separate production lines for manufacturing and remanufacturing. European Journal of Operational Research 2008, 191:1241-1253.
-
(2008)
European Journal of Operational Research
, vol.191
, pp. 1241-1253
-
-
Teunter, R.1
Kaparis, K.2
Tang, O.3
|