|
Volumn 118, Issue 1, 2009, Pages 323-330
|
Heuristics for the economic lot scheduling problem with returns
|
Author keywords
ELSP; Remanufacturing; Returns; Reverse logistics
|
Indexed keywords
OPTIMAL SYSTEMS;
PLASMA WAVES;
RHENIUM COMPOUNDS;
SCHEDULING;
COMPLEX ALGORITHMS;
CYCLE TIME;
ECONOMIC LOT SCHEDULING PROBLEMS;
ELSP;
MULTI ITEMS;
NUMERICAL STUDIES;
OPTIMAL SOLUTIONS;
PRODUCTION AND OPERATIONS MANAGEMENTS;
PRODUCTION LINES;
REMANUFACTURING;
RETURNS;
REVERSE LOGISTICS;
SEARCH PROCEDURES;
TWO SOURCES;
HEURISTIC METHODS;
|
EID: 61449132527
PISSN: 09255273
EISSN: None
Source Type: Journal
DOI: 10.1016/j.ijpe.2008.08.036 Document Type: Article |
Times cited : (48)
|
References (11)
|