-
2
-
-
0001012373
-
Lot sizing to reduce capacity utilization in a production process with defective items, process corrections, and rework
-
Lee H.L. Lot sizing to reduce capacity utilization in a production process with defective items, process corrections, and rework. Management Science 38 9 (1992) 1314-1328
-
(1992)
Management Science
, vol.38
, Issue.9
, pp. 1314-1328
-
-
Lee, H.L.1
-
3
-
-
33746955245
-
-
Inderfurth K, Flapper SDP, Lambert AJD, Pappis CP, Voutsinas TG. Production planning for product recovery management. In: Dekker R, et al., editors. Reverse logistics-quantitative models for closed-loop supply chains, Berlin. 2004: p. 249-74.
-
-
-
-
4
-
-
33746951052
-
-
Szendrovits AZ, Truscott WG. Fundamentals of scheduling: the manufacturing cycle time. In: Wild R, editors. International handbook of production and operations management. London 1989. p. 324-47.
-
-
-
-
5
-
-
0000659781
-
A system for managing job-shop production
-
Reiter S. A system for managing job-shop production. The Journal of Business 39 (1966) 371-393
-
(1966)
The Journal of Business
, vol.39
, pp. 371-393
-
-
Reiter, S.1
-
7
-
-
0016572027
-
Manufacturing cycle time determination for a multi-stage economic production quantity model
-
Szendrovits A.Z. Manufacturing cycle time determination for a multi-stage economic production quantity model. Management Science 22 3 (1975) 298-308
-
(1975)
Management Science
, vol.22
, Issue.3
, pp. 298-308
-
-
Szendrovits, A.Z.1
-
8
-
-
0017984961
-
Economic batch quantity in a multi-stage production system
-
Goyal S.K. Economic batch quantity in a multi-stage production system. International Journal of Production Research 16 (1978) 267-273
-
(1978)
International Journal of Production Research
, vol.16
, pp. 267-273
-
-
Goyal, S.K.1
-
9
-
-
0039078972
-
Optimizing multi-stage production with constant lot size and varying numbers of batches
-
Szendrovits A.Z., and Drezner Z. Optimizing multi-stage production with constant lot size and varying numbers of batches. Omega 8 6 (1980) 623-629
-
(1980)
Omega
, vol.8
, Issue.6
, pp. 623-629
-
-
Szendrovits, A.Z.1
Drezner, Z.2
-
10
-
-
0009457668
-
Determination of optimum production quantity for a two-stage production system
-
Goyal S.K. Determination of optimum production quantity for a two-stage production system. Operational Research Quaterly 28 4 (1977) 865-870
-
(1977)
Operational Research Quaterly
, vol.28
, Issue.4
, pp. 865-870
-
-
Goyal, S.K.1
-
12
-
-
0042418810
-
Optimizing multi-stage production with constant lot size and varying number of unequal sized batches
-
Bogaschewsky R., Buscher U., and Lindner G. Optimizing multi-stage production with constant lot size and varying number of unequal sized batches. Omega 29 (2001) 183-191
-
(2001)
Omega
, vol.29
, pp. 183-191
-
-
Bogaschewsky, R.1
Buscher, U.2
Lindner, G.3
-
13
-
-
33746935722
-
-
Minner S, Lindner G. Lot sizing decisions in product recovery management. In: Dekker R, et al., editors. Reverse logistics-quantitative models for closed-loop supply chains, Berlin 2004. p. 157-79.
-
-
-
-
14
-
-
0000591102
-
A deterministic inventory model for reparable items
-
Schrady D.A. A deterministic inventory model for reparable items. Naval Research Logistics Quarterly 14 (1967) 391-398
-
(1967)
Naval Research Logistics Quarterly
, vol.14
, pp. 391-398
-
-
Schrady, D.A.1
-
15
-
-
0030572943
-
The EOQ repair and waste disposal model with variable setup numbers
-
Richter K. The EOQ repair and waste disposal model with variable setup numbers. European Journal of Operational Research 96 (1996) 313-324
-
(1996)
European Journal of Operational Research
, vol.96
, pp. 313-324
-
-
Richter, K.1
-
16
-
-
0032636774
-
Analysis of the EOQ repair and waste disposal problem with integer setup numbers
-
Richter K., and Dobos I. Analysis of the EOQ repair and waste disposal problem with integer setup numbers. International Journal of Production Economics 59 (1999) 463-467
-
(1999)
International Journal of Production Economics
, vol.59
, pp. 463-467
-
-
Richter, K.1
Dobos, I.2
-
17
-
-
0035449015
-
Economic ordering quantities for recoverable item inventory systems
-
Teunter R.H. Economic ordering quantities for recoverable item inventory systems. Naval Research Logistics 48 (2001) 484-495
-
(2001)
Naval Research Logistics
, vol.48
, pp. 484-495
-
-
Teunter, R.H.1
-
18
-
-
33747026808
-
-
Minner S. Economic production and remanufacturing lot-sizing under constant demands and returns. In: Fleischmann B, et al., editors. Operations research proceedings 2000. Berlin: Springer; 2001, p. 328-32.
-
-
-
-
19
-
-
0018470018
-
A deterministic model for a repairable inventory system with a finite repair rate
-
Nahmias S., and Rivera H. A deterministic model for a repairable inventory system with a finite repair rate. International Journal of Production Research 17 (1979) 215-221
-
(1979)
International Journal of Production Research
, vol.17
, pp. 215-221
-
-
Nahmias, S.1
Rivera, H.2
-
20
-
-
33747018865
-
-
Lindner G, Buscher U. An optimal lot and batch size policy for a single item produced and remanufactured on one machine in the presence of limitations on the manufacturing and handling capacity. Working Paper, Otto-von-Guericke-University, Magdeburg, Germany, 2003.
-
-
-
-
22
-
-
0001198301
-
Lot sizing with random yields: a review
-
Yano C.A., and Lee H.L. Lot sizing with random yields: a review. Operations Research 43 (1995) 311-334
-
(1995)
Operations Research
, vol.43
, pp. 311-334
-
-
Yano, C.A.1
Lee, H.L.2
-
23
-
-
33746935721
-
-
Flapper SDP, Jensen T. Logistic planning and control of rework. International Journal of Production Research 2003, forthcoming.
-
-
-
-
24
-
-
0001068236
-
Random yield, rework and scrap in a multistage batch manufacturing environment
-
Spence Wein A. Random yield, rework and scrap in a multistage batch manufacturing environment. Operations Research 40 (1992) 551-563
-
(1992)
Operations Research
, vol.40
, pp. 551-563
-
-
Spence Wein, A.1
-
25
-
-
0029752323
-
Control Limits for Multi-stage manufacturing processes with binomial yield (single and multiple production runs)
-
Barad M., and Braha D. Control Limits for Multi-stage manufacturing processes with binomial yield (single and multiple production runs). Journal of the Operational Research Society 47 (1996) 98-112
-
(1996)
Journal of the Operational Research Society
, vol.47
, pp. 98-112
-
-
Barad, M.1
Braha, D.2
-
26
-
-
0036565334
-
Multistage production to order with rework capability
-
Grosfeld-Nir A., and Gerchak Y. Multistage production to order with rework capability. Management Science 48 5 (2002) 652-664
-
(2002)
Management Science
, vol.48
, Issue.5
, pp. 652-664
-
-
Grosfeld-Nir, A.1
Gerchak, Y.2
-
28
-
-
0024064273
-
An integrated production-inventory model with reprocessing and inspection
-
Tayi G.K., and Ballou D.P. An integrated production-inventory model with reprocessing and inspection. International Journal of Production Research 26 8 (1988) 1299-1315
-
(1988)
International Journal of Production Research
, vol.26
, Issue.8
, pp. 1299-1315
-
-
Tayi, G.K.1
Ballou, D.P.2
-
29
-
-
3242721026
-
EBQ for a multistage production system considering rework
-
Chakraborty S., and Rao R.S.V.N. EBQ for a multistage production system considering rework. Opsearch 25 2 (1989) 75-88
-
(1989)
Opsearch
, vol.25
, Issue.2
, pp. 75-88
-
-
Chakraborty, S.1
Rao, R.S.V.N.2
-
30
-
-
0022613610
-
Optimal lot sizing, process quality improvement and setup cost reduction
-
Porteus E.L. Optimal lot sizing, process quality improvement and setup cost reduction. Operations Research 34 1 (1986) 137-144
-
(1986)
Operations Research
, vol.34
, Issue.1
, pp. 137-144
-
-
Porteus, E.L.1
-
31
-
-
0023412314
-
Simultaneous determination of production cycle and inspection schedules in a production system
-
Lee H.L., and Rosenblatt M.J. Simultaneous determination of production cycle and inspection schedules in a production system. Management Science 33 9 (1987) 1125-1136
-
(1987)
Management Science
, vol.33
, Issue.9
, pp. 1125-1136
-
-
Lee, H.L.1
Rosenblatt, M.J.2
-
32
-
-
0000312965
-
The impact of inspection delay on process and inspection lot sizing
-
Porteus E.L. The impact of inspection delay on process and inspection lot sizing. Management Science 36 8 (1990) 999-1007
-
(1990)
Management Science
, vol.36
, Issue.8
, pp. 999-1007
-
-
Porteus, E.L.1
-
33
-
-
0029290859
-
Optimal operating policy for a bottleneck with random rework
-
So K.C., and Tang C.S. Optimal operating policy for a bottleneck with random rework. Management Science 41 4 (1995) 620-636
-
(1995)
Management Science
, vol.41
, Issue.4
, pp. 620-636
-
-
So, K.C.1
Tang, C.S.2
-
34
-
-
0009423748
-
Optimal batch sizing and repair strategies for operations with repairable jobs
-
So K.C., and Tang C.S. Optimal batch sizing and repair strategies for operations with repairable jobs. Management Science 41 5 (1995) 894-908
-
(1995)
Management Science
, vol.41
, Issue.5
, pp. 894-908
-
-
So, K.C.1
Tang, C.S.2
-
35
-
-
0042091890
-
Optimal lot-sizing in an imperfect production system with homogeneous reworkable jobs
-
Liu J.J., and Yang P. Optimal lot-sizing in an imperfect production system with homogeneous reworkable jobs. European Journal of Operational Research 91 (1996) 517-527
-
(1996)
European Journal of Operational Research
, vol.91
, pp. 517-527
-
-
Liu, J.J.1
Yang, P.2
-
36
-
-
0033116502
-
Determining a threshold control policy for an imperfect production system with rework jobs
-
Chern C.C., and Yang P. Determining a threshold control policy for an imperfect production system with rework jobs. Naval Research Logistics 46 (1999) 273-301
-
(1999)
Naval Research Logistics
, vol.46
, pp. 273-301
-
-
Chern, C.C.1
Yang, P.2
-
37
-
-
1342332973
-
Lot-sizing for a single-stage single-product production system with rework of perishable production defectives
-
Teunter R.H., and Flapper S.D.P. Lot-sizing for a single-stage single-product production system with rework of perishable production defectives. OR Spectrum 25 (2003) 85-96
-
(2003)
OR Spectrum
, vol.25
, pp. 85-96
-
-
Teunter, R.H.1
Flapper, S.D.P.2
-
38
-
-
33747000913
-
-
Inderfurth K, Lindner G, Rahaniotis NP. Lot-sizing in a production system with rework and product deterioration. Working Paper, Otto-von-Guericke-University, Magdeburg, Germany, 2003.
-
-
-
-
39
-
-
0018020598
-
A comment on determination of optimum production quantity for a two-stage production system
-
Szendrovits A.Z. A comment on determination of optimum production quantity for a two-stage production system. Journal of the Operational Research Society 29 (1978) 1017-1020
-
(1978)
Journal of the Operational Research Society
, vol.29
, pp. 1017-1020
-
-
Szendrovits, A.Z.1
|