메뉴 건너뛰기




Volumn 34, Issue 2, 2007, Pages 515-535

Optimizing a production system with rework and equal sized batch shipments

Author keywords

Batching; Lot sizing; Rework; Scheduling

Indexed keywords

ALGORITHMS; DECISION THEORY; MATHEMATICAL MODELS; OPERATIONS RESEARCH; OPTIMIZATION; PRODUCTION CONTROL;

EID: 33747026665     PISSN: 03050548     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.cor.2005.03.011     Document Type: Article
Times cited : (88)

References (39)
  • 2
    • 0001012373 scopus 로고
    • Lot sizing to reduce capacity utilization in a production process with defective items, process corrections, and rework
    • Lee H.L. Lot sizing to reduce capacity utilization in a production process with defective items, process corrections, and rework. Management Science 38 9 (1992) 1314-1328
    • (1992) Management Science , vol.38 , Issue.9 , pp. 1314-1328
    • Lee, H.L.1
  • 3
    • 33746955245 scopus 로고    scopus 로고
    • Inderfurth K, Flapper SDP, Lambert AJD, Pappis CP, Voutsinas TG. Production planning for product recovery management. In: Dekker R, et al., editors. Reverse logistics-quantitative models for closed-loop supply chains, Berlin. 2004: p. 249-74.
  • 4
    • 33746951052 scopus 로고    scopus 로고
    • Szendrovits AZ, Truscott WG. Fundamentals of scheduling: the manufacturing cycle time. In: Wild R, editors. International handbook of production and operations management. London 1989. p. 324-47.
  • 5
    • 0000659781 scopus 로고
    • A system for managing job-shop production
    • Reiter S. A system for managing job-shop production. The Journal of Business 39 (1966) 371-393
    • (1966) The Journal of Business , vol.39 , pp. 371-393
    • Reiter, S.1
  • 7
    • 0016572027 scopus 로고
    • Manufacturing cycle time determination for a multi-stage economic production quantity model
    • Szendrovits A.Z. Manufacturing cycle time determination for a multi-stage economic production quantity model. Management Science 22 3 (1975) 298-308
    • (1975) Management Science , vol.22 , Issue.3 , pp. 298-308
    • Szendrovits, A.Z.1
  • 8
    • 0017984961 scopus 로고
    • Economic batch quantity in a multi-stage production system
    • Goyal S.K. Economic batch quantity in a multi-stage production system. International Journal of Production Research 16 (1978) 267-273
    • (1978) International Journal of Production Research , vol.16 , pp. 267-273
    • Goyal, S.K.1
  • 9
    • 0039078972 scopus 로고
    • Optimizing multi-stage production with constant lot size and varying numbers of batches
    • Szendrovits A.Z., and Drezner Z. Optimizing multi-stage production with constant lot size and varying numbers of batches. Omega 8 6 (1980) 623-629
    • (1980) Omega , vol.8 , Issue.6 , pp. 623-629
    • Szendrovits, A.Z.1    Drezner, Z.2
  • 10
    • 0009457668 scopus 로고
    • Determination of optimum production quantity for a two-stage production system
    • Goyal S.K. Determination of optimum production quantity for a two-stage production system. Operational Research Quaterly 28 4 (1977) 865-870
    • (1977) Operational Research Quaterly , vol.28 , Issue.4 , pp. 865-870
    • Goyal, S.K.1
  • 12
    • 0042418810 scopus 로고    scopus 로고
    • Optimizing multi-stage production with constant lot size and varying number of unequal sized batches
    • Bogaschewsky R., Buscher U., and Lindner G. Optimizing multi-stage production with constant lot size and varying number of unequal sized batches. Omega 29 (2001) 183-191
    • (2001) Omega , vol.29 , pp. 183-191
    • Bogaschewsky, R.1    Buscher, U.2    Lindner, G.3
  • 13
    • 33746935722 scopus 로고    scopus 로고
    • Minner S, Lindner G. Lot sizing decisions in product recovery management. In: Dekker R, et al., editors. Reverse logistics-quantitative models for closed-loop supply chains, Berlin 2004. p. 157-79.
  • 14
    • 0000591102 scopus 로고
    • A deterministic inventory model for reparable items
    • Schrady D.A. A deterministic inventory model for reparable items. Naval Research Logistics Quarterly 14 (1967) 391-398
    • (1967) Naval Research Logistics Quarterly , vol.14 , pp. 391-398
    • Schrady, D.A.1
  • 15
    • 0030572943 scopus 로고    scopus 로고
    • The EOQ repair and waste disposal model with variable setup numbers
    • Richter K. The EOQ repair and waste disposal model with variable setup numbers. European Journal of Operational Research 96 (1996) 313-324
    • (1996) European Journal of Operational Research , vol.96 , pp. 313-324
    • Richter, K.1
  • 16
    • 0032636774 scopus 로고    scopus 로고
    • Analysis of the EOQ repair and waste disposal problem with integer setup numbers
    • Richter K., and Dobos I. Analysis of the EOQ repair and waste disposal problem with integer setup numbers. International Journal of Production Economics 59 (1999) 463-467
    • (1999) International Journal of Production Economics , vol.59 , pp. 463-467
    • Richter, K.1    Dobos, I.2
  • 17
    • 0035449015 scopus 로고    scopus 로고
    • Economic ordering quantities for recoverable item inventory systems
    • Teunter R.H. Economic ordering quantities for recoverable item inventory systems. Naval Research Logistics 48 (2001) 484-495
    • (2001) Naval Research Logistics , vol.48 , pp. 484-495
    • Teunter, R.H.1
  • 18
    • 33747026808 scopus 로고    scopus 로고
    • Minner S. Economic production and remanufacturing lot-sizing under constant demands and returns. In: Fleischmann B, et al., editors. Operations research proceedings 2000. Berlin: Springer; 2001, p. 328-32.
  • 19
    • 0018470018 scopus 로고
    • A deterministic model for a repairable inventory system with a finite repair rate
    • Nahmias S., and Rivera H. A deterministic model for a repairable inventory system with a finite repair rate. International Journal of Production Research 17 (1979) 215-221
    • (1979) International Journal of Production Research , vol.17 , pp. 215-221
    • Nahmias, S.1    Rivera, H.2
  • 20
    • 33747018865 scopus 로고    scopus 로고
    • Lindner G, Buscher U. An optimal lot and batch size policy for a single item produced and remanufactured on one machine in the presence of limitations on the manufacturing and handling capacity. Working Paper, Otto-von-Guericke-University, Magdeburg, Germany, 2003.
  • 22
    • 0001198301 scopus 로고
    • Lot sizing with random yields: a review
    • Yano C.A., and Lee H.L. Lot sizing with random yields: a review. Operations Research 43 (1995) 311-334
    • (1995) Operations Research , vol.43 , pp. 311-334
    • Yano, C.A.1    Lee, H.L.2
  • 23
    • 33746935721 scopus 로고    scopus 로고
    • Flapper SDP, Jensen T. Logistic planning and control of rework. International Journal of Production Research 2003, forthcoming.
  • 24
    • 0001068236 scopus 로고
    • Random yield, rework and scrap in a multistage batch manufacturing environment
    • Spence Wein A. Random yield, rework and scrap in a multistage batch manufacturing environment. Operations Research 40 (1992) 551-563
    • (1992) Operations Research , vol.40 , pp. 551-563
    • Spence Wein, A.1
  • 25
    • 0029752323 scopus 로고    scopus 로고
    • Control Limits for Multi-stage manufacturing processes with binomial yield (single and multiple production runs)
    • Barad M., and Braha D. Control Limits for Multi-stage manufacturing processes with binomial yield (single and multiple production runs). Journal of the Operational Research Society 47 (1996) 98-112
    • (1996) Journal of the Operational Research Society , vol.47 , pp. 98-112
    • Barad, M.1    Braha, D.2
  • 26
    • 0036565334 scopus 로고    scopus 로고
    • Multistage production to order with rework capability
    • Grosfeld-Nir A., and Gerchak Y. Multistage production to order with rework capability. Management Science 48 5 (2002) 652-664
    • (2002) Management Science , vol.48 , Issue.5 , pp. 652-664
    • Grosfeld-Nir, A.1    Gerchak, Y.2
  • 28
    • 0024064273 scopus 로고
    • An integrated production-inventory model with reprocessing and inspection
    • Tayi G.K., and Ballou D.P. An integrated production-inventory model with reprocessing and inspection. International Journal of Production Research 26 8 (1988) 1299-1315
    • (1988) International Journal of Production Research , vol.26 , Issue.8 , pp. 1299-1315
    • Tayi, G.K.1    Ballou, D.P.2
  • 29
    • 3242721026 scopus 로고
    • EBQ for a multistage production system considering rework
    • Chakraborty S., and Rao R.S.V.N. EBQ for a multistage production system considering rework. Opsearch 25 2 (1989) 75-88
    • (1989) Opsearch , vol.25 , Issue.2 , pp. 75-88
    • Chakraborty, S.1    Rao, R.S.V.N.2
  • 30
    • 0022613610 scopus 로고
    • Optimal lot sizing, process quality improvement and setup cost reduction
    • Porteus E.L. Optimal lot sizing, process quality improvement and setup cost reduction. Operations Research 34 1 (1986) 137-144
    • (1986) Operations Research , vol.34 , Issue.1 , pp. 137-144
    • Porteus, E.L.1
  • 31
    • 0023412314 scopus 로고
    • Simultaneous determination of production cycle and inspection schedules in a production system
    • Lee H.L., and Rosenblatt M.J. Simultaneous determination of production cycle and inspection schedules in a production system. Management Science 33 9 (1987) 1125-1136
    • (1987) Management Science , vol.33 , Issue.9 , pp. 1125-1136
    • Lee, H.L.1    Rosenblatt, M.J.2
  • 32
    • 0000312965 scopus 로고
    • The impact of inspection delay on process and inspection lot sizing
    • Porteus E.L. The impact of inspection delay on process and inspection lot sizing. Management Science 36 8 (1990) 999-1007
    • (1990) Management Science , vol.36 , Issue.8 , pp. 999-1007
    • Porteus, E.L.1
  • 33
    • 0029290859 scopus 로고
    • Optimal operating policy for a bottleneck with random rework
    • So K.C., and Tang C.S. Optimal operating policy for a bottleneck with random rework. Management Science 41 4 (1995) 620-636
    • (1995) Management Science , vol.41 , Issue.4 , pp. 620-636
    • So, K.C.1    Tang, C.S.2
  • 34
    • 0009423748 scopus 로고
    • Optimal batch sizing and repair strategies for operations with repairable jobs
    • So K.C., and Tang C.S. Optimal batch sizing and repair strategies for operations with repairable jobs. Management Science 41 5 (1995) 894-908
    • (1995) Management Science , vol.41 , Issue.5 , pp. 894-908
    • So, K.C.1    Tang, C.S.2
  • 35
    • 0042091890 scopus 로고    scopus 로고
    • Optimal lot-sizing in an imperfect production system with homogeneous reworkable jobs
    • Liu J.J., and Yang P. Optimal lot-sizing in an imperfect production system with homogeneous reworkable jobs. European Journal of Operational Research 91 (1996) 517-527
    • (1996) European Journal of Operational Research , vol.91 , pp. 517-527
    • Liu, J.J.1    Yang, P.2
  • 36
    • 0033116502 scopus 로고    scopus 로고
    • Determining a threshold control policy for an imperfect production system with rework jobs
    • Chern C.C., and Yang P. Determining a threshold control policy for an imperfect production system with rework jobs. Naval Research Logistics 46 (1999) 273-301
    • (1999) Naval Research Logistics , vol.46 , pp. 273-301
    • Chern, C.C.1    Yang, P.2
  • 37
    • 1342332973 scopus 로고    scopus 로고
    • Lot-sizing for a single-stage single-product production system with rework of perishable production defectives
    • Teunter R.H., and Flapper S.D.P. Lot-sizing for a single-stage single-product production system with rework of perishable production defectives. OR Spectrum 25 (2003) 85-96
    • (2003) OR Spectrum , vol.25 , pp. 85-96
    • Teunter, R.H.1    Flapper, S.D.P.2
  • 38
    • 33747000913 scopus 로고    scopus 로고
    • Inderfurth K, Lindner G, Rahaniotis NP. Lot-sizing in a production system with rework and product deterioration. Working Paper, Otto-von-Guericke-University, Magdeburg, Germany, 2003.
  • 39
    • 0018020598 scopus 로고
    • A comment on determination of optimum production quantity for a two-stage production system
    • Szendrovits A.Z. A comment on determination of optimum production quantity for a two-stage production system. Journal of the Operational Research Society 29 (1978) 1017-1020
    • (1978) Journal of the Operational Research Society , vol.29 , pp. 1017-1020
    • Szendrovits, A.Z.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.