-
1
-
-
21244485304
-
Reverse logistics: A framework
-
Dekker R., Fleischmann M., Inderfurth K., and van Wassenhove L.N. (Eds), Springer, Berlin
-
de Brito M., and Dekker R. Reverse logistics: A framework. In: Dekker R., Fleischmann M., Inderfurth K., and van Wassenhove L.N. (Eds). Reverse Logistics-Quantitative Models for Closed-Loop Supply Chains (2004), Springer, Berlin 3-27
-
(2004)
Reverse Logistics-Quantitative Models for Closed-Loop Supply Chains
, pp. 3-27
-
-
de Brito, M.1
Dekker, R.2
-
2
-
-
37949029483
-
-
Flapper, S.D.P., Jensen, T., 2003. Logistic planning and control of rework. Unpublished manuscript.
-
-
-
-
3
-
-
37949037088
-
-
Flapper, S.D.P., Teunter, R.H., 2003. Logistic planning of rework with deteriorating work-in-process. Working Paper, Department of Technology Management, Eindhoven University of Technology, The Netherlands.
-
-
-
-
7
-
-
27344460910
-
Production planning and control of closed-loop supply chains
-
Guide Jr. V.D.R., and van Wassenhove L.N. (Eds), Carnegie Mellon University Press, Oxford
-
Inderfurth K., and Teunter R.H. Production planning and control of closed-loop supply chains. In: Guide Jr. V.D.R., and van Wassenhove L.N. (Eds). Business Perspectives on Closed-Loop Supply Chains (2003), Carnegie Mellon University Press, Oxford 149-173
-
(2003)
Business Perspectives on Closed-Loop Supply Chains
, pp. 149-173
-
-
Inderfurth, K.1
Teunter, R.H.2
-
8
-
-
37949009522
-
-
Inderfurth, K., Lindner, G., Rahaniotis, N.P., 2003. Lotsizing in a production system with rework and product deterioration. Working Paper 1/2003, Faculty of Economics and Management, Otto-von-Guericke-University Magdeburg, Germany.
-
-
-
-
9
-
-
37949049135
-
-
Lindner, G., Buscher, U., Flapper, S.D.P., 2001. An optimal lot and batch size policy for a single item produced and remanufactured on one machine. Working Paper 10/2001, Faculty of Economics and Management, Otto-von-Guericke-University Magdeburg, Germany.
-
-
-
-
10
-
-
0042091890
-
Optimal lot sizing in an imperfect production system with homogeneous reworkable jobs
-
Liu J.J., and Yang P. Optimal lot sizing in an imperfect production system with homogeneous reworkable jobs. European Journal of Operational Research 91 (1996) 517-527
-
(1996)
European Journal of Operational Research
, vol.91
, pp. 517-527
-
-
Liu, J.J.1
Yang, P.2
-
11
-
-
27344443291
-
Lotsizing decisions in product recovery management
-
Dekker R., Fleischmann M., Inderfurth K., and van Wassenhove L.N. (Eds), Springer, Berlin
-
Minner S., and Lindner G. Lotsizing decisions in product recovery management. In: Dekker R., Fleischmann M., Inderfurth K., and van Wassenhove L.N. (Eds). Reverse Logistics-Quantitative Models for Closed-Loop Supply Chains (2004), Springer, Berlin 157-179
-
(2004)
Reverse Logistics-Quantitative Models for Closed-Loop Supply Chains
, pp. 157-179
-
-
Minner, S.1
Lindner, G.2
-
12
-
-
84867971809
-
Single machine scheduling with assignable due dates
-
Qi X.T., Yu G., and Bard J.F. Single machine scheduling with assignable due dates. Discrete Applied Mathematics 122 (2002) 211-233
-
(2002)
Discrete Applied Mathematics
, vol.122
, pp. 211-233
-
-
Qi, X.T.1
Yu, G.2
Bard, J.F.3
-
13
-
-
0002066821
-
Various optimizers for single-stage production
-
Smith W.E. Various optimizers for single-stage production. Naval Research Logistics Quarterly 3 (1956) 59-66
-
(1956)
Naval Research Logistics Quarterly
, vol.3
, pp. 59-66
-
-
Smith, W.E.1
-
14
-
-
0033426611
-
Minimizing maximum absolute lateness and range of lateness under generalized due dates on a single machine
-
Tanaka K., and Vlach M. Minimizing maximum absolute lateness and range of lateness under generalized due dates on a single machine. Annals of Operations Research 86 (1999) 507-526
-
(1999)
Annals of Operations Research
, vol.86
, pp. 507-526
-
-
Tanaka, K.1
Vlach, M.2
-
15
-
-
1342332973
-
Lot-sizing for a single-stage single-product production system with rework of perishable production defectives
-
Teunter R.H., and Flapper S.D.P. Lot-sizing for a single-stage single-product production system with rework of perishable production defectives. OR Spectrum 25 (2003) 85-96
-
(2003)
OR Spectrum
, vol.25
, pp. 85-96
-
-
Teunter, R.H.1
Flapper, S.D.P.2
|