메뉴 건너뛰기




Volumn 36, Issue 6, 2008, Pages 976-991

Decision support system for the batching problems of steelmaking and continuous-casting production

Author keywords

Batching; Decision support system; Heuristics; Modelling; Steelmaking and continuous casting production

Indexed keywords


EID: 40649106449     PISSN: 03050483     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.omega.2007.11.002     Document Type: Article
Times cited : (91)

References (26)
  • 1
    • 85171823175 scopus 로고    scopus 로고
    • Dorn J., and Shams R. Scheduling high-grade steelmaking. IEEE Expert 11 1 (1996) 28-35
  • 2
    • 85171822336 scopus 로고    scopus 로고
    • Chang SY., Chang MR., and Hong YS. A lot grouping algorithm for a continuous slab caster in an integrated steel mill. Production Planning and Control 11 (2000) 363-368
  • 3
    • 85171820708 scopus 로고    scopus 로고
    • Harjunkoski I., and Grossmann IE. A decomposition approach for the scheduling of steel plant production. Computers and Chemical Engineering 25 (2001) 1647-1660
  • 4
    • 85171827769 scopus 로고    scopus 로고
    • Pacciarelli D., and Pranzo M. Production scheduling in a steelmaking continuous casting plant. Computers and Chemical Engineering 28 (2004) 2823-2835
  • 5
    • 85171824375 scopus 로고    scopus 로고
    • Roy R., Adesola BA., and Thornton S. Development of a knowledge model for managing schedule disturbance in steel-making. International Journal of Production Research 42 18 (2004) 3975-3994
  • 6
    • 85171818194 scopus 로고    scopus 로고
    • Zanoni S., and Zavanella L. Model and analysis of integrated production-inventory system: the case of steel production. International Journal of Production Economics 93-94 (2005) 197-205
  • 7
    • 85171822826 scopus 로고    scopus 로고
    • Ferretti I., Zanoni S., and Zavanella L. Production-inventory scheduling using ant system metaheuristic. International Journal of Production Economics 104 (2006) 317-326
  • 8
    • 85171812838 scopus 로고    scopus 로고
    • Kumar V., Kumar S., and Tiwari MK. Auction-based approach to resolve the scheduling problem in the steel making process. International Journal of Production Research 44 8 (2006) 1503-1522
  • 9
    • 85171814473 scopus 로고    scopus 로고
    • Bellabdaoui A., and Teghem J. A mixed-integer linear programming model for the continuous casting planning. International Journal of Production Economics 104 2 (2006) 260-270
  • 10
    • 85171815567 scopus 로고    scopus 로고
    • Missbauer H, Hauber W, Stadler W. A scheduling system for the steelmaking continuous casting process of a steel plant, Paper presented at INFORMS 2006, Hong Kong, June 25-28, 2006.
  • 11
    • 85171822386 scopus 로고    scopus 로고
    • Tang LX., Liu JY., Rong AY., and Yang ZH. A mathematical programming model for scheduling steelmaking-continuous casting production. European Journal of Operational Research 120 (2000) 423-435
  • 12
    • 85171823135 scopus 로고    scopus 로고
    • Tang LX., Luh PB., Liu JY., and Fang L. Steelmaking process scheduling using Lagrangian relaxation. International Journal of Production Research 40 1 (2002) 55-70
  • 13
    • 85171821107 scopus 로고    scopus 로고
    • Lee HS., Murthy SS., Haider SW., and Morse DV. Primary production scheduling at steel making industries. IBM Journal of Research and Development 40 2 (1996) 231-252
  • 14
    • 85171825287 scopus 로고    scopus 로고
    • McKay KN., and Wiers VCS. Integrated decision support for planning, scheduling, and dispatching tasks in a focused factory. Computers in Industry 50 1 (2003) 5-14
  • 15
    • 85171822377 scopus 로고    scopus 로고
    • McKay KN., and Wiers VCS. Planners, schedulers and dispatchers: a description of cognitive tasks in production control. International Journal of Cognition, Technology and Work 5 2 (2003) 82-93
  • 16
    • 85171814678 scopus 로고    scopus 로고
    • McKay KN., and Buzacott JA. The application of computerized production control systems in job shop environments. Computers in Industry 42 2-3 (2000) 79-97
  • 17
    • 85171821494 scopus 로고    scopus 로고
    • Wiers VCS. A case study on the integration of APS and ERP in a steel processing plant. Production Planning and Control 13 6 (2002) 552-560
  • 18
    • 85171822555 scopus 로고    scopus 로고
    • Cowling P. A flexible decision support system for steel hot rolling mill scheduling. Computers and Industrial Engineering 45 (2003) 307-321
  • 19
    • 85171817154 scopus 로고    scopus 로고
    • Murty KG., Liu JY., Wan YW., and Linnc R. A decision support system for operations in a container termination. Decision Support Systems 39 (2005) 309-332
  • 20
    • 85171816412 scopus 로고    scopus 로고
    • Silva C., Figueira J., Lisboa J., and Barman S. An interactive decision support system for an aggregate production planning model based on multiple criteria mixed integer. Omega 34 (2006) 167-177
  • 21
    • 85171824839 scopus 로고    scopus 로고
    • Ioannou G., and Mavri M. Performance-net: a decision support system for reconfiguring a bank's branch network. Omega 35 (2007) 190-201
  • 22
    • 85167848687 scopus 로고    scopus 로고
    • Tütüncü GY, Carreto CAC, Baker BM. A visual interactive approach to classical and mixed vehicle routing problems with backhauls. Omega 2007, in press, doi:10.1016/j.omega.2006.11.001.
  • 23
    • 85171813262 scopus 로고    scopus 로고
    • Pinedo M. Planning and scheduling in manufacturing and services (2005), Springer, Berlin
  • 24
    • 85171818168 scopus 로고    scopus 로고
    • Pinedo M. Scheduling: theory, algorithms, and systems, 2nd ed. Englewood Cliffs, NJ: Prentice-Hall; 2000.
  • 25
    • 85171823677 scopus 로고    scopus 로고
    • Senne ELF., Lorenab LAN., and Pereirab MA. A branch-and-price approach to p-median location problems. Computers and Operations Research 32 (2005) 1655-1664
  • 26
    • 85171819994 scopus 로고    scopus 로고
    • Lopez L., Carter MW., and Gendreau M. The hot strip mill production scheduling problem: a tabu search algorithm. European Journal of Operational Research 106 (1998) 317-335


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.