메뉴 건너뛰기




Volumn 18, Issue 5, 2005, Pages 376-385

Decomposition approach for a problem of lot-sizing and sequencing under uncertainties

Author keywords

Decomposition; Lot sizing; Sequencing; Uncertainties

Indexed keywords

ITERATIVE METHODS; MATHEMATICAL MODELS; OPTIMIZATION; PROBABILITY DISTRIBUTIONS; TRAVELING SALESMAN PROBLEM;

EID: 27944462606     PISSN: 0951192X     EISSN: 13623052     Source Type: Journal    
DOI: 10.1080/09511920500081593     Document Type: Conference Paper
Times cited : (24)

References (17)
  • 1
    • 0023343841 scopus 로고
    • Determining lot sizes and resource requirements: A review
    • Bahl, H.C., Ritzman, L.P. and Gupta, J.N.D., Determining lot sizes and resource requirements: a review. Oper. Res., 1987, 35, 329-345.
    • (1987) Oper. Res. , vol.35 , pp. 329-345
    • Bahl, H.C.1    Ritzman, L.P.2    Gupta, J.N.D.3
  • 2
    • 0000454153 scopus 로고
    • Solution of a large-scale traveling-salesman problem
    • Dantzig, G., Fulkerson, D. and Johnson, S., Solution of a large-scale traveling-salesman problem. Oper. Res., 1954, 2, 393-410.
    • (1954) Oper. Res. , vol.2 , pp. 393-410
    • Dantzig, G.1    Fulkerson, D.2    Johnson, S.3
  • 4
    • 27944499518 scopus 로고    scopus 로고
    • Performance analysis model for systems described by renewal process
    • Dolgui, A., Performance analysis model for systems described by renewal process. Eng. Simul. (Elektron. Model.), 2002, 24(2), 3-11.
    • (2002) Eng. Simul. (Elektron. Model.) , vol.24 , Issue.2 , pp. 3-11
    • Dolgui, A.1
  • 5
    • 84888617978 scopus 로고    scopus 로고
    • Buffer allocation in production line with unreliable machines
    • Dolgui, A., Ereemev, A., Kolokolov, A. and Sigaev, V., Buffer allocation in production line with unreliable machines. J. Math. Model. Algor., 2002, 1(2), 89-104.
    • (2002) J. Math. Model. Algor. , vol.1 , Issue.2 , pp. 89-104
    • Dolgui, A.1    Ereemev, A.2    Kolokolov, A.3    Sigaev, V.4
  • 6
    • 27944440217 scopus 로고    scopus 로고
    • Production line planning optimization under unreliable machines and random yield
    • Minsk
    • Dolgui, A. and Levin, G.M., Production line planning optimization under unreliable machines and random yield. Meth. Model. Informat. Technol. SAPR (Minsk), 2000, 3, 113-123.
    • (2000) Meth. Model. Informat. Technol. SAPR , vol.3 , pp. 113-123
    • Dolgui, A.1    Levin, G.M.2
  • 7
    • 0037151234 scopus 로고    scopus 로고
    • A model for supply planning under lead time uncertainty
    • Dolgui, A., and Louly, M.A., A model for supply planning under lead time uncertainty. Int. J. Prod. Econ., 2002, 78, 145-152.
    • (2002) Int. J. Prod. Econ. , vol.78 , pp. 145-152
    • Dolgui, A.1    Louly, M.A.2
  • 8
    • 0028396352 scopus 로고
    • Lot sizing in assembly systems with random component yields
    • Gerchak Y., Wang, Y. and Yano, C.A., Lot sizing in assembly systems with random component yields. IIE Trans., 1994, 26, 19-24.
    • (1994) IIE Trans. , vol.26 , pp. 19-24
    • Gerchak, Y.1    Wang, Y.2    Yano, C.A.3
  • 10
    • 0030285543 scopus 로고    scopus 로고
    • Optimal order policies in assembly systems with random demand and random supplier delivery
    • Gurnani H., Akella R., and Lehoczky, J., Optimal order policies in assembly systems with random demand and random supplier delivery. IIE Trans., 1996, 28, 865-878.
    • (1996) IIE Trans. , vol.28 , pp. 865-878
    • Gurnani, H.1    Akella, R.2    Lehoczky, J.3
  • 11
    • 0037146389 scopus 로고    scopus 로고
    • Newsboy model for supply planning of assembly systems
    • Louly, M.A. and Dolgui, A., Newsboy model for supply planning of assembly systems. Int. J. Prod. Res., 2002, 40(17), 4401-4414.
    • (2002) Int. J. Prod. Res. , vol.40 , Issue.17 , pp. 4401-4414
    • Louly, M.A.1    Dolgui, A.2
  • 13
    • 0031123532 scopus 로고    scopus 로고
    • Joint optimization of lot-sizes, safety stocks and safety lead times in an MRP system
    • Molinder, A., Joint optimization of lot-sizes, safety stocks and safety lead times in an MRP system. Int. J. Prod. Res., 1997, 35, 983-994.
    • (1997) Int. J. Prod. Res. , vol.35 , pp. 983-994
    • Molinder, A.1
  • 14
    • 0034675399 scopus 로고    scopus 로고
    • Input control in a bath production systems with lead times, due dates and random yields
    • Wang, Y. and Gerchak, Y., Input control in a bath production systems with lead times, due dates and random yields. Eur. J. Oper. Res., 2000, 126, 371-385.
    • (2000) Eur. J. Oper. Res. , vol.126 , pp. 371-385
    • Wang, Y.1    Gerchak, Y.2
  • 15
    • 0032121661 scopus 로고    scopus 로고
    • Analysis of a single-stage, single-product, stochastic, MRP-controlled assembly system
    • Wilhelm, W.E. and Som, P., Analysis of a single-stage, single-product, stochastic, MRP-controlled assembly system. Eur. J. Oper. Res., 1998, 108, 74-93.
    • (1998) Eur. J. Oper. Res. , vol.108 , pp. 74-93
    • Wilhelm, W.E.1    Som, P.2
  • 16
    • 0001198301 scopus 로고
    • Lot sizing with random yields a review
    • Yano, C.A. and Lee, H.L., Lot sizing with random yields a review. Oper. Res., 1995, 43, 311-334.
    • (1995) Oper. Res. , vol.43 , pp. 311-334
    • Yano, C.A.1    Lee, H.L.2
  • 17
    • 0024137576 scopus 로고
    • Optimal run quantities for an assembly system with random yields
    • Yao, D.D., Optimal run quantities for an assembly system with random yields. IIE Trans., 1988, 20, 399-403.
    • (1988) IIE Trans. , vol.20 , pp. 399-403
    • Yao, D.D.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.