메뉴 건너뛰기




Volumn 7, Issue 4, 2010, Pages 463-473

Economic production quantity model with backordering, rework and machine failure taking place in stock piling time

Author keywords

Backorder; Breakdown; Inventory; Lot size; Optimization; Production; Rework; Run time

Indexed keywords

BACKORDERING; BACKORDERS; BREAKDOWN; COST ANALYSIS; CYCLE LENGTH; ECONOMIC PRODUCTION QUANTITY; ECONOMIC PRODUCTION QUANTITY MODELS; EPQ MODELS; IMPERFECT QUALITY; IMPERFECT SYSTEMS; INVENTORY COSTS; INVENTORY REPLENISHMENT; LONG-RUN AVERAGE COST; LOT SIZE; LOT SIZING PROBLEMS; MACHINE BREAKDOWN; MACHINE FAILURE; MANUFACTURING ENVIRONMENTS; MATHEMATICAL MODELING; MEAN TIME BETWEEN FAILURES; NUMERICAL EXAMPLE; OVERALL COSTS; RELIABILITY FACTOR; RENEWAL REWARD THEOREM; ROBUST PRODUCTION; RUNTIMES;

EID: 77950947159     PISSN: 17900832     EISSN: None     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (16)

References (36)
  • 1
    • 0022676316 scopus 로고
    • Economic production cycles with imperfect production processes
    • M.J. Rosenblatt and H.L. Lee, Economic production cycles with imperfect production processes. IIE Transactions, Vol.18, 1986, pp.48-55.
    • (1986) IIE Transactions , vol.18 , pp. 48-55
    • Rosenblatt, M.J.1    Lee, H.L.2
  • 2
    • 0023412314 scopus 로고
    • Simultaneous determination of production cycle and inspection schedules in a production system
    • H.L. Lee and M.J. Rosenblatt, Simultaneous determination of production cycle and inspection schedules in a production system. Management Science, Vol.33, 1987, pp.1125-1136.
    • (1987) Management Science , vol.33 , pp. 1125-1136
    • Lee, H.L.1    Rosenblatt, M.J.2
  • 3
    • 0024037430 scopus 로고
    • Optimality of zero-inventory policies for unreliable production facility
    • T. Bielecki and P.R. Kumar, Optimality of zero-inventory policies for unreliable production facility, Operations Research, Vol.36, 1988, pp.532-541.
    • (1988) Operations Research , vol.36 , pp. 532-541
    • Bielecki, T.1    Kumar, P.R.2
  • 5
    • 0026116409 scopus 로고
    • An economic order quantity model with demand-dependent unit production cost and imperfect production processes
    • T.C.E. Cheng, An economic order quantity model with demand-dependent unit production cost and imperfect production processes. IIE Transaction, Vol.23, 1991, pp.23-28.
    • (1991) IIE Transaction , vol.23 , pp. 23-28
    • Cheng, T.C.E.1
  • 6
    • 0031119032 scopus 로고    scopus 로고
    • Joint determination of preventive maintenance and safety stocks in an unreliable production environment
    • K.L. Cheung and W.H. Hausman, Joint determination of preventive maintenance and safety stocks in an unreliable production environment. Naval Research Logistics, Vol.44(3), 1997, pp.257-272.
    • (1997) Naval Research Logistics , vol.44 , Issue.3 , pp. 257-272
    • Cheung, K.L.1    Hausman, W.H.2
  • 7
    • 0032683886 scopus 로고    scopus 로고
    • Optimal preventive maintenance in a production inventory system
    • T.K. Das and S. Sarkar, Optimal preventive maintenance in a production inventory system. IIE Transactions, Vol.31, 1999, pp.537-551.
    • (1999) IIE Transactions , vol.31 , pp. 537-551
    • Das, T.K.1    Sarkar, S.2
  • 8
    • 0039029278 scopus 로고    scopus 로고
    • The impact of imperfect processes on production run times
    • T. Boone, R. Ganeshan, Y. Guo and J.K. Ord, The impact of imperfect processes on production run times. Decision Sciences, 31(4), 2000, pp.773-785.
    • (2000) Decision Sciences , vol.31 , Issue.4 , pp. 773-785
    • Boone, T.1    Ganeshan, R.2    Guo, Y.3    Ord, J.K.4
  • 10
    • 34347377629 scopus 로고    scopus 로고
    • Alternative approach for realistic lot-size problem with random scrap rate and backlogging
    • Y-S.P. Chiu, C-K. Ting, C-B. Cheng, and F-Y. Lin, Alternative approach for realistic lot-size problem with random scrap rate and backlogging, WSEAS Transactions on Mathematics, Vol.6 (6), 2007, pp.736-740
    • (2007) WSEAS Transactions on Mathematics , vol.6 , Issue.6 , pp. 736-740
    • Chiu, Y.-S.P.1    Ting, C.-K.2    Cheng, C.-B.3    Lin, F.-Y.4
  • 11
    • 34247366300 scopus 로고    scopus 로고
    • Optimization problem for EMQ model with backlog level constraint
    • S.W. Chiu, Optimization problem for EMQ model with backlog level constraint. WSEAS Transactions on Information Science & Applications, Vol.4 (4), 2007, pp.687-692.
    • (2007) WSEAS Transactions on Information Science & Applications , vol.4 , Issue.4 , pp. 687-692
    • Chiu, S.W.1
  • 13
    • 38349101637 scopus 로고    scopus 로고
    • Algebraic methods for optimizing EPQ model with rework and scrap
    • Y-S.P. Chiu, F-T. Cheng, and C-K. Ting, Algebraic methods for optimizing EPQ model with rework and scrap. WSEAS Transactions on Systems, Vol.6 (11), 2007, pp.1319-1323.
    • (2007) WSEAS Transactions on Systems , vol.6 , Issue.11 , pp. 1319-1323
    • Chiu, Y.-S.P.1    Cheng, F.-T.2    Ting, C.-K.3
  • 15
    • 48849109713 scopus 로고    scopus 로고
    • Manufacturing lot sizing with backordering, scrap, and random breakdown occurring in inventory-stacking period
    • S.W. Chiu, J-C. Yang, S-Y. C. Kuo, Manufacturing lot sizing with backordering, scrap, and random breakdown occurring in inventory-stacking period. WSEAS Trans. On Mathematics, Vol.7 (4), 2008, pp.183-194.
    • (2008) WSEAS Trans. On Mathematics , vol.7 , Issue.4 , pp. 183-194
    • Chiu, S.W.1    Yang, J.-C.2    Kuo, S.-Y.C.3
  • 16
    • 33746785668 scopus 로고    scopus 로고
    • Determining the materials procurement policy based on the economic order/production models with backlogging permitted
    • Y-S.P. Chiu and S.W. Chiu, Determining the materials procurement policy based on the economic order/production models with backlogging permitted. International Journal of Advanced Manufacturing Technology, Vol.30 (1-2), 2006, pp.156-165.
    • (2006) International Journal of Advanced Manufacturing Technology , vol.30 , Issue.1-2 , pp. 156-165
    • Chiu, Y.-S.P.1    Chiu, S.W.2
  • 18
    • 0035470201 scopus 로고    scopus 로고
    • Production lot sizing with the reworking of imperfect quality items produced
    • P.A. Hayek and M.K. Salameh, Production lot sizing with the reworking of imperfect quality items produced. Production Planning and Control, Vol.12, 2001, pp.584-590.
    • (2001) Production Planning and Control , vol.12 , pp. 584-590
    • Hayek, P.A.1    Salameh, M.K.2
  • 19
    • 0142090745 scopus 로고    scopus 로고
    • Determining the optimal lot size for the finite production model with random defective rate, the rework process, and backlogging
    • Y-S.P. Chiu, Determining the optimal lot size for the finite production model with random defective rate, the rework process, and backlogging. Engineering Optimization, Vol.35 (4), 2003, pp.427-437.
    • (2003) Engineering Optimization , vol.35 , Issue.4 , pp. 427-437
    • Chiu, Y.-S.P.1
  • 20
    • 3242701287 scopus 로고    scopus 로고
    • Optimal manufacturing batch size with rework process at a single-stage production system
    • A.M.M. Jamal, B.R. Sarker and S. Mondal, Optimal manufacturing batch size with rework process at a single-stage production system. Computers and Industrial Engineering, Vol.47, 2004, pp.77-89.
    • (2004) Computers and Industrial Engineering , vol.47 , pp. 77-89
    • Jamal, A.M.M.1    Sarker, B.R.2    Mondal, S.3
  • 21
  • 22
    • 33745339066 scopus 로고    scopus 로고
    • Mathematical modeling for production system with backlogging and failure in repair
    • S.W. Chiu and Y-S.P. Chiu, Mathematical modeling for production system with backlogging and failure in repair. Journal of Scientific & Industrial Research, Vol.65(6), 2006, pp.499-506.
    • (2006) Journal of Scientific & Industrial Research , vol.65 , Issue.6 , pp. 499-506
    • Chiu, S.W.1    Chiu, Y-S.P.2
  • 24
    • 54949157109 scopus 로고    scopus 로고
    • A note on optimal replenishment policy for imperfect quality EMQ model with rework and backlogging
    • H-D. Lin, Y-S.P. Chiu, C-K. Ting, A note on optimal replenishment policy for imperfect quality EMQ model with rework and backlogging. Computers and Mathematics with Applications, Vol.56 (11), 2008, pp.2819-2824.
    • (2008) Computers and Mathematics with Applications , vol.56 , Issue.11 , pp. 2819-2824
    • Lin, H.-D.1    Chiu, Y.-S.P.2    Ting, C.-K.3
  • 26
    • 0031699435 scopus 로고    scopus 로고
    • An EMQ model with inspections and random machine failures
    • V. Makis and J. Fung, An EMQ model with inspections and random machine failures. Journal of Operational Research Society, Vol.49, 1998, pp.66-76. (Pubitemid 128609815)
    • (1998) Journal of the Operational Research Society , vol.49 , Issue.1 , pp. 66-76
    • Makis, V.1    Fung, J.2
  • 27
    • 23144434063 scopus 로고    scopus 로고
    • A dynamic lot sizing model with exponential machine breakdowns
    • PII S0377221796001361
    • H. Kuhn, A dynamic lot sizing model with exponential machine breakdowns. European Journal of Operational Research, Vol.100, 1997, pp.514-536. (Pubitemid 127392374)
    • (1997) European Journal of Operational Research , vol.100 , Issue.3 , pp. 514-536
    • Kuhn, H.1
  • 28
    • 17644387571 scopus 로고    scopus 로고
    • Exact formulation of stochastic EMQ model for an unreliable production system
    • DOI 10.1057/palgrave.jors.2601840
    • B.C. Giri and T. Dohi, Exact formulation of stochastic EMQ model for an unreliable production system. Journal of the Operational Research Society, Vol.56(5), 2005, pp.563-575. (Pubitemid 40567542)
    • (2005) Journal of the Operational Research Society , vol.56 , Issue.5 , pp. 563-575
    • Giri, B.C.1    Dohi, T.2
  • 29
    • 33846655633 scopus 로고    scopus 로고
    • Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns
    • S.W. Chiu, S.L. Wang and Y-S.P. Chiu, Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns. European Journal of Operational Research, Vol.180, 2007, pp.664-676.
    • (2007) European Journal of Operational Research , vol.180 , pp. 664-676
    • Chiu, S.W.1    Wang, S.L.2    Chiu, Y.-S.P.3
  • 30
    • 30344488182 scopus 로고    scopus 로고
    • Economic lot sizing for an imperfect production system subject to random breakdown
    • G.C. Lin and D.E. Kroll, Economic lot sizing for an imperfect production system subject to random breakdown. Engineering Optimization, Vol.38(1), 2006, pp.73-92.
    • (2006) Engineering Optimization , vol.38 , Issue.1 , pp. 73-92
    • Lin, G.C.1    Kroll, D.E.2
  • 31
    • 67649826546 scopus 로고    scopus 로고
    • Economic manufacturing quantity model with imperfect rework and random breakdown under abort/resume policy
    • Y-S.P. Chiu, C-Y. Tseng, W-C. Liu, C-K. Ting, Economic manufacturing quantity model with imperfect rework and random breakdown under abort/resume policy. P I Mech E Part B: Journal of Engineering Manufacture, Vol.223 (2), 2009, pp.183-194.
    • (2009) P I Mech E Part B: Journal of Engineering Manufacture , vol.223 , Issue.2 , pp. 183-194
    • Chiu, Y.-S.P.1    Tseng, C.-Y.2    Liu, W.-C.3    Ting, C.-K.4
  • 32
    • 48849090173 scopus 로고    scopus 로고
    • Effect of shortage level constraint on finite production rate model with rework
    • Y-S.P. Chiu, S.W. Chiu, and H-C. Chao, Effect of shortage level constraint on finite production rate model with rework. Journal of Scientific & Industrial Research, Vol.67 (2), 2008, pp.112-116.
    • (2008) Journal of Scientific & Industrial Research , vol.67 , Issue.2 , pp. 112-116
    • Chiu, Y.-S.P.1    Chiu, S.W.2    Chao, H.-C.3
  • 34
    • 70349417897 scopus 로고    scopus 로고
    • A note on determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns
    • Y-S.P. Chiu, C-K. Ting, A note on determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns. European Journal of Operational Research, Vol.201 (2), 2010, pp.641-643
    • (2010) European Journal of Operational Research , vol.201 , Issue.2 , pp. 641-643
    • Chiu, Y.-S.P.1    Ting, C.-K.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.