메뉴 건너뛰기




Volumn 6, Issue 6, 2007, Pages 736-740

Alternative approach for realistic lot-size problem with random scrap rate and backlogging

Author keywords

Algebraic derivation; Backlog; EPQ; Finite production rate model; Inventory; Lot sizing; Scrap rate

Indexed keywords

ALGEBRA; DIFFERENTIATION (CALCULUS); ECONOMICS; MATHEMATICAL MODELS; PRODUCTION;

EID: 34347377629     PISSN: 11092769     EISSN: None     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (9)

References (16)
  • 3
    • 0022676316 scopus 로고
    • Economic production cycles with imperfect production processes
    • M. J. Rosenblatt and H. L. Lee, Economic production cycles with imperfect production processes. IIE Transaction, Vol.18, 1986, pp.48-55.
    • (1986) IIE Transaction , vol.18 , pp. 48-55
    • Rosenblatt, M.J.1    Lee, H.L.2
  • 4
    • 0026116409 scopus 로고
    • An economic order quantity model with demand-dependent unit production cost and imperfect production processes
    • T. C. E. Cheng, An economic order quantity model with demand-dependent unit production cost and imperfect production processes, IIE Transaction, Vol.23, 1991, pp.23-28.
    • (1991) IIE Transaction , vol.23 , pp. 23-28
    • Cheng, T.C.E.1
  • 5
    • 8744223416 scopus 로고    scopus 로고
    • The effects of the random defective rate and the imperfect rework process on the economic production quantity model
    • S. W. Chiu, D-C. Gong, and H-M. Wee, The effects of the random defective rate and the imperfect rework process on the economic production quantity model, Japan Journal of Industrial and Applied Mathematics, Vol.21, No.3, 2004, pp.375-389.
    • (2004) Japan Journal of Industrial and Applied Mathematics , vol.21 , Issue.3 , pp. 375-389
    • Chiu, S.W.1    Gong, D.-C.2    Wee, H.-M.3
  • 6
    • 0030835106 scopus 로고    scopus 로고
    • Bounds for production lot sizing with machine breakdown
    • K. J. Chung, Bounds for production lot sizing with machine breakdown, Comp. Ind. Eng., Vol. 32, 1997, pp.139-144.
    • (1997) Comp. Ind. Eng , vol.32 , pp. 139-144
    • Chung, K.J.1
  • 7
    • 0035470201 scopus 로고    scopus 로고
    • Production lot sizing with the reworking of imperfect quality items produced
    • P. A. Hayek and M. K. Salameh, Production lot sizing with the reworking of imperfect quality items produced. Prod. Plan. Control, Vol. 12, No.6, 2001, pp.584-590.
    • (2001) Prod. Plan. Control , vol.12 , Issue.6 , pp. 584-590
    • Hayek, P.A.1    Salameh, M.K.2
  • 8
    • 0142090745 scopus 로고    scopus 로고
    • Determining the optimal lot size for the finite production model with random defective rate, the rework process, and backlogging
    • Y. P. Chiu, Determining the optimal lot size for the finite production model with random defective rate, the rework process, and backlogging, Engineering Optimization, Vol. 35, No.4, 2003, pp.427-437.
    • (2003) Engineering Optimization , vol.35 , Issue.4 , pp. 427-437
    • Chiu, Y.P.1
  • 9
    • 0042091890 scopus 로고    scopus 로고
    • Optimal lot-sizing in an imperfect production system with homogeneous reworkable jobs
    • J. J. Liu and P. Yang, Optimal lot-sizing in an imperfect production system with homogeneous reworkable jobs, Eur. J. Oper. Res., Vol.91, 1996, pp.517-527.
    • (1996) Eur. J. Oper. Res , vol.91 , pp. 517-527
    • Liu, J.J.1    Yang, P.2
  • 10
    • 33745339066 scopus 로고    scopus 로고
    • Mathematical modeling for production system with backlogging and failure in repair
    • S. W. Chiu and Y-S. P. Chiu, Mathematical modeling for production system with backlogging and failure in repair, Journal of Scientific & Industrial Research, Vol.65, No.6, 2006, pp.499-506.
    • (2006) Journal of Scientific & Industrial Research , vol.65 , Issue.6 , pp. 499-506
    • Chiu, S.W.1    Chiu, Y.-S.P.2
  • 11
    • 33646804512 scopus 로고    scopus 로고
    • Numerical method for determination of reworking or scraping the defective items in a finite production rate model
    • Y-S. P. Chiu, S.W. Chiu, and H-C. Chao, Numerical method for determination of reworking or scraping the defective items in a finite production rate model, Communications in Numerical Methods in Engineering, Vol.22, Issue 5, 2006, pp.377-386.
    • (2006) Communications in Numerical Methods in Engineering , vol.22 , Issue.5 , pp. 377-386
    • Chiu, Y.-S.P.1    Chiu, S.W.2    Chao, H.-C.3
  • 12
    • 33645160232 scopus 로고    scopus 로고
    • A finite production model with random defective rate and shortages allowed and backordered
    • Y. P. Chiu and S. W. Chiu, A finite production model with random defective rate and shortages allowed and backordered, J. Inform. Optim. Sci., Vol.24, No.3, 2003, pp.553-567.
    • (2003) J. Inform. Optim. Sci , vol.24 , Issue.3 , pp. 553-567
    • Chiu, Y.P.1    Chiu, S.W.2
  • 13
    • 0035906315 scopus 로고    scopus 로고
    • The economic production quantity (EPQ) with shortage derived algebraically
    • L. E. Cárdenas-Barrón, The economic production quantity (EPQ) with shortage derived algebraically. Int. J. Prod. Econ., Vol. 70, 2001, pp.289-292.
    • (2001) Int. J. Prod. Econ , vol.70 , pp. 289-292
    • Cárdenas-Barrón, L.E.1
  • 14
    • 0032654997 scopus 로고    scopus 로고
    • The EOQ with backlogging derived without derivatives
    • R.W. Grubbström and A. Erdem, The EOQ with backlogging derived without derivatives. Int. J. Prod. Econ., Vol.59, 1999, pp.529-530.
    • (1999) Int. J. Prod. Econ , vol.59 , pp. 529-530
    • Grubbström, R.W.1    Erdem, A.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.