메뉴 건너뛰기




Volumn 20, Issue 1-4, 2007, Pages 61-65

Economic lot sizing with imperfect rework derived without derivatives

Author keywords

Algebraic approach; Imperfect rework; Lot sizing; Production; Random defects

Indexed keywords

ALGEBRAIC APPROACH; CONVENTIONAL METHODS; DEFECTIVE ITEMS; ECONOMIC ORDER QUANTITIES; ECONOMIC PRODUCTION QUANTITIES; EPQ MODELS; IMPERFECT REWORK; INVENTORY COSTS; LOT SIZING; OPTIMAL LOT SIZES; OPTIMALITY; RANDOM DEFECTS;

EID: 64849085670     PISSN: 13301365     EISSN: None     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (5)

References (13)
  • 1
    • 0000356787 scopus 로고
    • How many parts to make at once
    • F.W. Harris, How many parts to make at once, Factory, Magazine of Management, Vol. 10, pp. 135-136, 1913.
    • (1913) Factory, Magazine of Management , vol.10 , pp. 135-136
    • Harris, F.W.1
  • 2
    • 0022676316 scopus 로고
    • Economic production cycles with imperfect production processes
    • M.J. Rosenblatt and H.L. Lee, Economic production cycles with imperfect production processes, HE Transaction, Vol. 18, pp. 48-55, 1986.
    • (1986) HE Transaction , vol.18 , pp. 48-55
    • Rosenblatt, M.J.1    Lee, H.L.2
  • 4
    • 0026116409 scopus 로고
    • An economic order quantity model with demand-dependent unit production cost and imperfect production processes
    • T.C.E. Cheng, An economic order quantity model with demand-dependent unit production cost and imperfect production processes, IIE Transaction, Vol. 23, pp. 23-28, 1991.
    • (1991) IIE Transaction , vol.23 , pp. 23-28
    • Cheng, T.C.E.1
  • 5
    • 0030835106 scopus 로고    scopus 로고
    • Bounds for production lot sizing with machine breakdown
    • K. J. Chung, Bounds for production lot sizing with machine breakdown, Computers & Industrial Engineering, Vol. 32, pp. 139-144, 1997.
    • (1997) Computers & Industrial Engineering , vol.32 , pp. 139-144
    • Chung, K.J.1
  • 6
    • 0035470201 scopus 로고    scopus 로고
    • Production lot sizing with the reworking of imperfect quality items produced
    • P.A. Hayek and M.K. Salameh, Production lot sizing with the reworking of imperfect quality items produced, Production Planning & Control, Vol. 12, pp. 584-590, 2001.
    • (2001) Production Planning & Control , vol.12 , pp. 584-590
    • Hayek, P.A.1    Salameh, M.K.2
  • 7
    • 36849049574 scopus 로고    scopus 로고
    • Determining the optimal lot size for the finite production model with an imperfect rework process of defective items
    • S.W. Chiu and D.C. Gong, Determining the optimal lot size for the finite production model with an imperfect rework process of defective items, Journal of Information & Optimization Sciences, Vol. 25, pp. 105-119, 2004.
    • (2004) Journal of Information & Optimization Sciences , vol.25 , pp. 105-119
    • Chiu, S.W.1    Gong, D.C.2
  • 8
    • 33745339066 scopus 로고    scopus 로고
    • Mathematical modeling for production system with backlogging and failure in repair
    • S.W. Chiu and Y.-S.P. Chiu, Mathematical modeling for production system with backlogging and failure in repair, Journal of Scientific and Industrial Research, Vol. 65, No. 6, pp. 499-506, 2006.
    • (2006) Journal of Scientific and Industrial Research , vol.65 , Issue.6 , pp. 499-506
    • Chiu, S.W.1    Chiu, Y.-S.P.2
  • 9
    • 34247872840 scopus 로고    scopus 로고
    • Optimal replenishment policy for imperfect quality EMQ model with rework and backlogging
    • S.W. Chiu, Optimal replenishment policy for imperfect quality EMQ model with rework and backlogging, Applied Stochastic Models in Business and Industry, Vol. 23, No. 2, pp. 165-178, 2007.
    • (2007) Applied Stochastic Models in Business and Industry , vol.23 , Issue.2 , pp. 165-178
    • Chiu, S.W.1
  • 11
    • 0035906315 scopus 로고    scopus 로고
    • The economic production quantity (EPQ) with shortage derived algebraically
    • L.E. Cárdenas-Barrón, The economic production quantity (EPQ) with shortage derived algebraically, International Journal of Production Economics, Vol. 70, pp. 289-292, 2001.
    • (2001) International Journal of Production Economics , vol.70 , pp. 289-292
    • Cárdenas-Barrón, L.E.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.