메뉴 건너뛰기




Volumn 5, Issue 4, 2008, Pages 475-486

Optimal run time for EMQ model with backordering, failure-in- rework and breakdown happening in stock-piling time

Author keywords

Backorder; Breakdown; Failure in rework; Manufacturing; Run time

Indexed keywords

COST ACCOUNTING; DISTRIBUTION OF GOODS; INDUSTRIAL RESEARCH; PILES; PLANNING; PRODUCTION CONTROL;

EID: 48849111365     PISSN: 17900832     EISSN: None     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (8)

References (36)
  • 4
    • 34247366300 scopus 로고    scopus 로고
    • Optimization problem for EMQ model with backlog level 'constraint
    • S.W. Chiu, Optimization problem for EMQ model with backlog level 'constraint. WSEAS Transactions on Information Science & Applications, Vol. 4 (4), 2007 pp.687-691.
    • (2007) WSEAS Transactions on Information Science & Applications , vol.4 , Issue.4 , pp. 687-691
    • Chiu, S.W.1
  • 6
    • 38349101637 scopus 로고    scopus 로고
    • Algebraic methods for optimizing EPQ model with rework and scrap
    • Y-S.P. Chiu, F-T. Cheng, and C-K. Ting, Algebraic methods for optimizing EPQ model with rework and scrap. WSEAS Transactions on Systems, Vol. 6 (11), 2007, pp. 1319-1323.
    • (2007) WSEAS Transactions on Systems , vol.6 , Issue.11 , pp. 1319-1323
    • Chiu, Y.-S.P.1    Cheng, F.-T.2    Ting, C.-K.3
  • 7
    • 21944439213 scopus 로고    scopus 로고
    • Proposal of multi-agent based model for dynamic scheduling in manufacturing
    • A. Madureira and J. Santos, Proposal of multi-agent based model for dynamic scheduling in manufacturing. WSEAS Transactions on Information Science & Applications, Vol. 2 (5), 2005, pp.600-605.
    • (2005) WSEAS Transactions on Information Science & Applications , vol.2 , Issue.5 , pp. 600-605
    • Madureira, A.1    Santos, J.2
  • 8
    • 0024037430 scopus 로고
    • Optimality of zero-inventory policies for unreliable production facility
    • T. Bielecki and P.R. Kumar, Optimality of zero-inventory policies for unreliable production facility, Operations Research, Vol. 36, 1988, pp.532-541.
    • (1988) Operations Research , vol.36 , pp. 532-541
    • Bielecki, T.1    Kumar, P.R.2
  • 9
    • 0039029278 scopus 로고    scopus 로고
    • The impact of imperfect processes on production run times
    • T. Boone, R. Ganeshan, Y. Guo and J.K. Ord, The impact of imperfect processes on production run times. Decision Sciences, 31(4), 2000, pp.773-785.
    • (2000) Decision Sciences , vol.31 , Issue.4 , pp. 773-785
    • Boone, T.1    Ganeshan, R.2    Guo, Y.3    Ord, J.K.4
  • 10
    • 0026116409 scopus 로고
    • An economic order quantity model with demand-dependent unit production cost and imperfect production processes
    • T.C.E. Cheng, An economic order quantity model with demand-dependent unit production cost and imperfect production processes. IIE Transaction, Vol. 23, 1991, pp.23-28.
    • (1991) IIE Transaction , vol.23 , pp. 23-28
    • Cheng, T.C.E.1
  • 11
    • 0031119032 scopus 로고    scopus 로고
    • Joint determination of preventive maintenance and safety stocks in an unreliable production environment
    • K.L. Cheung and W.H. Hausman, Joint determination of preventive maintenance and safety stocks in an unreliable production environment. Naval Research Logistics, Vol. 44(3), 1997, pp.257-272.
    • (1997) Naval Research Logistics , vol.44 , Issue.3 , pp. 257-272
    • Cheung, K.L.1    Hausman, W.H.2
  • 12
    • 0032683886 scopus 로고    scopus 로고
    • Optimal preventive maintenance in a production inventory system
    • T.K. Das and S. Sarkar, Optimal preventive maintenance in a production inventory system. IIE Transactions, Vol.31, 1999, pp.537-551.
    • (1999) IIE Transactions , vol.31 , pp. 537-551
    • Das, T.K.1    Sarkar, S.2
  • 13
    • 0023412314 scopus 로고
    • Simultaneous determination of production cycle and inspection schedules in a production system
    • H.L. Lee and M.J. Rosenblatt, Simultaneous determination of production cycle and inspection schedules in a production system. Management Science, Vol. 33, 1987, pp. 1125-1136.
    • (1987) Management Science , vol.33 , pp. 1125-1136
    • Lee, H.L.1    Rosenblatt, M.J.2
  • 14
    • 0022676316 scopus 로고
    • Economic production cycles with imperfect production processes
    • M.J. Rosenblatt and H.L. Lee, Economic production cycles with imperfect production processes. IIE Transactions, Vol. 18, 1986, pp.48-55.
    • (1986) IIE Transactions , vol.18 , pp. 48-55
    • Rosenblatt, M.J.1    Lee, H.L.2
  • 15
    • 0025399639 scopus 로고
    • Joint lot sizing and inspection policy in an EOQ model with random yield
    • X. Zhang and Y. Gerchak, Joint lot sizing and inspection policy in an EOQ model with random yield. IIE Transactions, Vol. 22, 1990, pp.41-47.
    • (1990) IIE Transactions , vol.22 , pp. 41-47
    • Zhang, X.1    Gerchak, Y.2
  • 16
    • 33745339066 scopus 로고    scopus 로고
    • Mathematical modeling for production system with backlogging and failure in repair
    • S.W. Chiu and Y-S.P. Chiu, Mathematical modeling for production system with backlogging and failure in repair. Journal of Scientific & Industrial Research, Vol. 65(6), 2006, pp.499-506.
    • (2006) Journal of Scientific & Industrial Research , vol.65 , Issue.6 , pp. 499-506
    • Chiu, S.W.1    Chiu, Y.-S.P.2
  • 17
    • 36849095468 scopus 로고    scopus 로고
    • Effects of service level constraint and failure-in-repair on an economic manufacturing quantity model
    • S.W. Chiu, Effects of service level constraint and failure-in-repair on an economic manufacturing quantity model, P I Mech Eng Part B: Journal of Engineering Manufacture, Vol. 221(7), 2007, pp. 1235-1243.
    • (2007) P I Mech Eng Part B: Journal of Engineering Manufacture , vol.221 , Issue.7 , pp. 1235-1243
    • Chiu, S.W.1
  • 18
    • 38349058125 scopus 로고    scopus 로고
    • Production lot size problem with failure in repair and backlogging derived without derivatives
    • S.W. Chiu, Production lot size problem with failure in repair and backlogging derived without derivatives, European Journal of Operational Research, Vol. 188 (2), 2008, pp. 610-615
    • (2008) European Journal of Operational Research , vol.188 , Issue.2 , pp. 610-615
    • Chiu, S.W.1
  • 19
    • 34247097459 scopus 로고    scopus 로고
    • Optimal production lot sizing with backlogging, random defective rate, and rework derived without derivatives
    • Y-S.P Chiu, H-D. Lin, and F-T. Cheng, Optimal production lot sizing with backlogging, random defective rate, and rework derived without derivatives. P I Mech E Part B: Journal of Engineering Manufacture, Vol. 220(9), 2006, pp.1559-1563.
    • (2006) P I Mech E Part B: Journal of Engineering Manufacture , vol.220 , Issue.9 , pp. 1559-1563
    • Chiu, Y.-S.P.1    Lin, H.-D.2    Cheng, F.-T.3
  • 20
    • 33645163509 scopus 로고    scopus 로고
    • Y-S.P. Chiu, The effect of service level constraint on EPQ model with random defective rate. Mathematical Problems in Engineering, 2006 (Article ID 98502), 13 pages (doi:10.1155/:MPE/2006/98502).
    • Y-S.P. Chiu, The effect of service level constraint on EPQ model with random defective rate. Mathematical Problems in Engineering, Vol. 2006 (Article ID 98502), 13 pages (doi:10.1155/:MPE/2006/98502).
  • 21
    • 0035470201 scopus 로고    scopus 로고
    • Production lot sizing with the reworking of imperfect quality items produced
    • P.A. Hayek and M.K. Salameh, Production lot sizing with the reworking of imperfect quality items produced. Production Planning and Control, Vol. 12, 2001, pp.584-590.
    • (2001) Production Planning and Control , vol.12 , pp. 584-590
    • Hayek, P.A.1    Salameh, M.K.2
  • 22
    • 3242701287 scopus 로고    scopus 로고
    • Optimal manufacturing batch size with rework process at a single-stage production system
    • A.M.M. Jamal, B.R. Sarker and S. Mondal, Optimal manufacturing batch size with rework process at a single-stage production system. Computers and Industrial Engineering, Vol. 47, 2004, pp.77-89.
    • (2004) Computers and Industrial Engineering , vol.47 , pp. 77-89
    • Jamal, A.M.M.1    Sarker, B.R.2    Mondal, S.3
  • 23
    • 0026454137 scopus 로고
    • Production lot sizing with machine breakdowns
    • H. Groenevelt, L. Pintelon and A. Seidmann, Production lot sizing with machine breakdowns. Management Science, Vol. 38, 1992, pp. 104-123.
    • (1992) Management Science , vol.38 , pp. 104-123
    • Groenevelt, H.1    Pintelon, L.2    Seidmann, A.3
  • 24
    • 17644387571 scopus 로고    scopus 로고
    • Exact formulation of stochastic EMQ model for an unreliable production system
    • B.C. Giri and T. Dohi, Exact formulation of stochastic EMQ model for an unreliable production system. Journal of the Operational Research Society, Vol. 56(5), 2005, pp.563-575.
    • (2005) Journal of the Operational Research Society , vol.56 , Issue.5 , pp. 563-575
    • Giri, B.C.1    Dohi, T.2
  • 25
    • 0030835106 scopus 로고    scopus 로고
    • Bounds for production lot sizing with machine breakdowns
    • K.J. Chung, Bounds for production lot sizing with machine breakdowns. Computers and Industrial Engineering, Vol. 32, 1997, pp. 139-144.
    • (1997) Computers and Industrial Engineering , vol.32 , pp. 139-144
    • Chung, K.J.1
  • 26
    • 33846655633 scopus 로고    scopus 로고
    • Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns
    • S.W. Chiu, S.L. Wang and Y-S.P. Chiu, Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns. European Journal of Operational Research, Vol. 180, 2007, pp.664-676.
    • (2007) European Journal of Operational Research , vol.180 , pp. 664-676
    • Chiu, S.W.1    Wang, S.L.2    Chiu, Y.-S.P.3
  • 27
    • 23144434063 scopus 로고    scopus 로고
    • A dynamic lot sizing model with exponential machine breakdowns
    • H. Kuhn, A dynamic lot sizing model with exponential machine breakdowns. European Journal of Operational Research, Vol. 100, 1997, pp.514-536.
    • (1997) European Journal of Operational Research , vol.100 , pp. 514-536
    • Kuhn, H.1
  • 28
    • 30344488182 scopus 로고    scopus 로고
    • Economic lot sizing for an imperfect production system subject to random breakdowns
    • G.C. Lin and D.E. Kroll, Economic lot sizing for an imperfect production system subject to random breakdowns. Engineering Optimization, Vol. 38(1), 2006, pp.73-92.
    • (2006) Engineering Optimization , vol.38 , Issue.1 , pp. 73-92
    • Lin, G.C.1    Kroll, D.E.2
  • 29
    • 0031699435 scopus 로고    scopus 로고
    • An EMQ model with inspections and random machine failures
    • V. Makis and J. Fung, An EMQ model with inspections and random machine failures. Journal of Operational Research Society, Vol. 49, 1998, pp.66-76.
    • (1998) Journal of Operational Research Society , vol.49 , pp. 66-76
    • Makis, V.1    Fung, J.2
  • 30
    • 48849096362 scopus 로고    scopus 로고
    • Production run time problem with machine breakdowns under AR control policy and rework
    • S.W. Chiu, Production run time problem with machine breakdowns under AR control policy and rework. Journal of Scientific & Industrial Research, Vol. 66 (12), 2007, pp.979-988.
    • (2007) Journal of Scientific & Industrial Research , vol.66 , Issue.12 , pp. 979-988
    • Chiu, S.W.1
  • 31
    • 46449088127 scopus 로고    scopus 로고
    • An optimization problem of manufacturing systems with stochastic machine breakdown and rework process
    • DOI:10.1002/asmb.699, in Press
    • S.W. Chiu, An optimization problem of manufacturing systems with stochastic machine breakdown and rework process. Applied Stochastic Models in Business and Industry, DOI:10.1002/asmb.699, 2008, (in Press).
    • (2008) Applied Stochastic Models in Business and Industry
    • Chiu, S.W.1
  • 32
    • 48849090173 scopus 로고    scopus 로고
    • Effect of shortage level constraint on finite production rate model with rework
    • Y-S.P. Chiu, S.W. Chiu, and H-C. Chao, Effect of shortage level constraint on finite production rate model with rework. Journal of Scientific & Industrial Research, Vol. 67 (2), 2008, pp.112-116.
    • (2008) Journal of Scientific & Industrial Research , vol.67 , Issue.2 , pp. 112-116
    • Chiu, Y.-S.P.1    Chiu, S.W.2    Chao, H.-C.3
  • 35
    • 34250899311 scopus 로고    scopus 로고
    • A revised cost-benefit algorithm for solving ECTEP problem with defective materials in product structure diagram
    • S.W. Chiu, C-C. Shih, and Y-S.P. Chiu, A revised cost-benefit algorithm for solving ECTEP problem with defective materials in product structure diagram. P I Mech Eng Part B: Journal of Engineering Manufacture, Vol. 221 (3), 2007, pp.489-497.
    • (2007) P I Mech Eng Part B: Journal of Engineering Manufacture , vol.221 , Issue.3 , pp. 489-497
    • Chiu, S.W.1    Shih, C.-C.2    Chiu, Y.-S.P.3
  • 36
    • 33748703640 scopus 로고    scopus 로고
    • Determining expedited time and cost of the end product with defective component parts using critical path method (CPM) and time-costing method
    • S.W. Chiu, Y-S.P. Chiu, and C-C. Shih, Determining expedited time and cost of the end product with defective component parts using critical path method (CPM) and time-costing method. Journal of Scientific & Industrial Research, Vol. 65(9), 2006 pp.695-701.
    • (2006) Journal of Scientific & Industrial Research , vol.65 , Issue.9 , pp. 695-701
    • Chiu, S.W.1    Chiu, Y.-S.P.2    Shih, C.-C.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.