-
3
-
-
0003398158
-
-
John Wiley & Sons, New York
-
E.A. Silver, D.F. Pyke and R. Peterson, Inventory Management and Production, Planning and Scheduling, John Wiley & Sons, New York, 1998.
-
(1998)
Inventory Management and Production, Planning and Scheduling
-
-
Silver, E.A.1
Pyke, D.F.2
Peterson, R.3
-
4
-
-
34247366300
-
Optimization problem for EMQ model with backlog level 'constraint
-
S.W. Chiu, Optimization problem for EMQ model with backlog level 'constraint. WSEAS Transactions on Information Science & Applications, Vol. 4 (4), 2007 pp.687-691.
-
(2007)
WSEAS Transactions on Information Science & Applications
, vol.4
, Issue.4
, pp. 687-691
-
-
Chiu, S.W.1
-
6
-
-
38349101637
-
Algebraic methods for optimizing EPQ model with rework and scrap
-
Y-S.P. Chiu, F-T. Cheng, and C-K. Ting, Algebraic methods for optimizing EPQ model with rework and scrap. WSEAS Transactions on Systems, Vol. 6 (11), 2007, pp. 1319-1323.
-
(2007)
WSEAS Transactions on Systems
, vol.6
, Issue.11
, pp. 1319-1323
-
-
Chiu, Y.-S.P.1
Cheng, F.-T.2
Ting, C.-K.3
-
8
-
-
0024037430
-
Optimality of zero-inventory policies for unreliable production facility
-
T. Bielecki and P.R. Kumar, Optimality of zero-inventory policies for unreliable production facility, Operations Research, Vol. 36, 1988, pp.532-541.
-
(1988)
Operations Research
, vol.36
, pp. 532-541
-
-
Bielecki, T.1
Kumar, P.R.2
-
9
-
-
0039029278
-
The impact of imperfect processes on production run times
-
T. Boone, R. Ganeshan, Y. Guo and J.K. Ord, The impact of imperfect processes on production run times. Decision Sciences, 31(4), 2000, pp.773-785.
-
(2000)
Decision Sciences
, vol.31
, Issue.4
, pp. 773-785
-
-
Boone, T.1
Ganeshan, R.2
Guo, Y.3
Ord, J.K.4
-
10
-
-
0026116409
-
An economic order quantity model with demand-dependent unit production cost and imperfect production processes
-
T.C.E. Cheng, An economic order quantity model with demand-dependent unit production cost and imperfect production processes. IIE Transaction, Vol. 23, 1991, pp.23-28.
-
(1991)
IIE Transaction
, vol.23
, pp. 23-28
-
-
Cheng, T.C.E.1
-
11
-
-
0031119032
-
Joint determination of preventive maintenance and safety stocks in an unreliable production environment
-
K.L. Cheung and W.H. Hausman, Joint determination of preventive maintenance and safety stocks in an unreliable production environment. Naval Research Logistics, Vol. 44(3), 1997, pp.257-272.
-
(1997)
Naval Research Logistics
, vol.44
, Issue.3
, pp. 257-272
-
-
Cheung, K.L.1
Hausman, W.H.2
-
12
-
-
0032683886
-
Optimal preventive maintenance in a production inventory system
-
T.K. Das and S. Sarkar, Optimal preventive maintenance in a production inventory system. IIE Transactions, Vol.31, 1999, pp.537-551.
-
(1999)
IIE Transactions
, vol.31
, pp. 537-551
-
-
Das, T.K.1
Sarkar, S.2
-
13
-
-
0023412314
-
Simultaneous determination of production cycle and inspection schedules in a production system
-
H.L. Lee and M.J. Rosenblatt, Simultaneous determination of production cycle and inspection schedules in a production system. Management Science, Vol. 33, 1987, pp. 1125-1136.
-
(1987)
Management Science
, vol.33
, pp. 1125-1136
-
-
Lee, H.L.1
Rosenblatt, M.J.2
-
14
-
-
0022676316
-
Economic production cycles with imperfect production processes
-
M.J. Rosenblatt and H.L. Lee, Economic production cycles with imperfect production processes. IIE Transactions, Vol. 18, 1986, pp.48-55.
-
(1986)
IIE Transactions
, vol.18
, pp. 48-55
-
-
Rosenblatt, M.J.1
Lee, H.L.2
-
15
-
-
0025399639
-
Joint lot sizing and inspection policy in an EOQ model with random yield
-
X. Zhang and Y. Gerchak, Joint lot sizing and inspection policy in an EOQ model with random yield. IIE Transactions, Vol. 22, 1990, pp.41-47.
-
(1990)
IIE Transactions
, vol.22
, pp. 41-47
-
-
Zhang, X.1
Gerchak, Y.2
-
16
-
-
33745339066
-
Mathematical modeling for production system with backlogging and failure in repair
-
S.W. Chiu and Y-S.P. Chiu, Mathematical modeling for production system with backlogging and failure in repair. Journal of Scientific & Industrial Research, Vol. 65(6), 2006, pp.499-506.
-
(2006)
Journal of Scientific & Industrial Research
, vol.65
, Issue.6
, pp. 499-506
-
-
Chiu, S.W.1
Chiu, Y.-S.P.2
-
17
-
-
36849095468
-
Effects of service level constraint and failure-in-repair on an economic manufacturing quantity model
-
S.W. Chiu, Effects of service level constraint and failure-in-repair on an economic manufacturing quantity model, P I Mech Eng Part B: Journal of Engineering Manufacture, Vol. 221(7), 2007, pp. 1235-1243.
-
(2007)
P I Mech Eng Part B: Journal of Engineering Manufacture
, vol.221
, Issue.7
, pp. 1235-1243
-
-
Chiu, S.W.1
-
18
-
-
38349058125
-
Production lot size problem with failure in repair and backlogging derived without derivatives
-
S.W. Chiu, Production lot size problem with failure in repair and backlogging derived without derivatives, European Journal of Operational Research, Vol. 188 (2), 2008, pp. 610-615
-
(2008)
European Journal of Operational Research
, vol.188
, Issue.2
, pp. 610-615
-
-
Chiu, S.W.1
-
19
-
-
34247097459
-
Optimal production lot sizing with backlogging, random defective rate, and rework derived without derivatives
-
Y-S.P Chiu, H-D. Lin, and F-T. Cheng, Optimal production lot sizing with backlogging, random defective rate, and rework derived without derivatives. P I Mech E Part B: Journal of Engineering Manufacture, Vol. 220(9), 2006, pp.1559-1563.
-
(2006)
P I Mech E Part B: Journal of Engineering Manufacture
, vol.220
, Issue.9
, pp. 1559-1563
-
-
Chiu, Y.-S.P.1
Lin, H.-D.2
Cheng, F.-T.3
-
20
-
-
33645163509
-
-
Y-S.P. Chiu, The effect of service level constraint on EPQ model with random defective rate. Mathematical Problems in Engineering, 2006 (Article ID 98502), 13 pages (doi:10.1155/:MPE/2006/98502).
-
Y-S.P. Chiu, The effect of service level constraint on EPQ model with random defective rate. Mathematical Problems in Engineering, Vol. 2006 (Article ID 98502), 13 pages (doi:10.1155/:MPE/2006/98502).
-
-
-
-
21
-
-
0035470201
-
Production lot sizing with the reworking of imperfect quality items produced
-
P.A. Hayek and M.K. Salameh, Production lot sizing with the reworking of imperfect quality items produced. Production Planning and Control, Vol. 12, 2001, pp.584-590.
-
(2001)
Production Planning and Control
, vol.12
, pp. 584-590
-
-
Hayek, P.A.1
Salameh, M.K.2
-
22
-
-
3242701287
-
Optimal manufacturing batch size with rework process at a single-stage production system
-
A.M.M. Jamal, B.R. Sarker and S. Mondal, Optimal manufacturing batch size with rework process at a single-stage production system. Computers and Industrial Engineering, Vol. 47, 2004, pp.77-89.
-
(2004)
Computers and Industrial Engineering
, vol.47
, pp. 77-89
-
-
Jamal, A.M.M.1
Sarker, B.R.2
Mondal, S.3
-
23
-
-
0026454137
-
Production lot sizing with machine breakdowns
-
H. Groenevelt, L. Pintelon and A. Seidmann, Production lot sizing with machine breakdowns. Management Science, Vol. 38, 1992, pp. 104-123.
-
(1992)
Management Science
, vol.38
, pp. 104-123
-
-
Groenevelt, H.1
Pintelon, L.2
Seidmann, A.3
-
24
-
-
17644387571
-
Exact formulation of stochastic EMQ model for an unreliable production system
-
B.C. Giri and T. Dohi, Exact formulation of stochastic EMQ model for an unreliable production system. Journal of the Operational Research Society, Vol. 56(5), 2005, pp.563-575.
-
(2005)
Journal of the Operational Research Society
, vol.56
, Issue.5
, pp. 563-575
-
-
Giri, B.C.1
Dohi, T.2
-
25
-
-
0030835106
-
Bounds for production lot sizing with machine breakdowns
-
K.J. Chung, Bounds for production lot sizing with machine breakdowns. Computers and Industrial Engineering, Vol. 32, 1997, pp. 139-144.
-
(1997)
Computers and Industrial Engineering
, vol.32
, pp. 139-144
-
-
Chung, K.J.1
-
26
-
-
33846655633
-
Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns
-
S.W. Chiu, S.L. Wang and Y-S.P. Chiu, Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns. European Journal of Operational Research, Vol. 180, 2007, pp.664-676.
-
(2007)
European Journal of Operational Research
, vol.180
, pp. 664-676
-
-
Chiu, S.W.1
Wang, S.L.2
Chiu, Y.-S.P.3
-
27
-
-
23144434063
-
A dynamic lot sizing model with exponential machine breakdowns
-
H. Kuhn, A dynamic lot sizing model with exponential machine breakdowns. European Journal of Operational Research, Vol. 100, 1997, pp.514-536.
-
(1997)
European Journal of Operational Research
, vol.100
, pp. 514-536
-
-
Kuhn, H.1
-
28
-
-
30344488182
-
Economic lot sizing for an imperfect production system subject to random breakdowns
-
G.C. Lin and D.E. Kroll, Economic lot sizing for an imperfect production system subject to random breakdowns. Engineering Optimization, Vol. 38(1), 2006, pp.73-92.
-
(2006)
Engineering Optimization
, vol.38
, Issue.1
, pp. 73-92
-
-
Lin, G.C.1
Kroll, D.E.2
-
29
-
-
0031699435
-
An EMQ model with inspections and random machine failures
-
V. Makis and J. Fung, An EMQ model with inspections and random machine failures. Journal of Operational Research Society, Vol. 49, 1998, pp.66-76.
-
(1998)
Journal of Operational Research Society
, vol.49
, pp. 66-76
-
-
Makis, V.1
Fung, J.2
-
30
-
-
48849096362
-
Production run time problem with machine breakdowns under AR control policy and rework
-
S.W. Chiu, Production run time problem with machine breakdowns under AR control policy and rework. Journal of Scientific & Industrial Research, Vol. 66 (12), 2007, pp.979-988.
-
(2007)
Journal of Scientific & Industrial Research
, vol.66
, Issue.12
, pp. 979-988
-
-
Chiu, S.W.1
-
31
-
-
46449088127
-
An optimization problem of manufacturing systems with stochastic machine breakdown and rework process
-
DOI:10.1002/asmb.699, in Press
-
S.W. Chiu, An optimization problem of manufacturing systems with stochastic machine breakdown and rework process. Applied Stochastic Models in Business and Industry, DOI:10.1002/asmb.699, 2008, (in Press).
-
(2008)
Applied Stochastic Models in Business and Industry
-
-
Chiu, S.W.1
-
32
-
-
48849090173
-
Effect of shortage level constraint on finite production rate model with rework
-
Y-S.P. Chiu, S.W. Chiu, and H-C. Chao, Effect of shortage level constraint on finite production rate model with rework. Journal of Scientific & Industrial Research, Vol. 67 (2), 2008, pp.112-116.
-
(2008)
Journal of Scientific & Industrial Research
, vol.67
, Issue.2
, pp. 112-116
-
-
Chiu, Y.-S.P.1
Chiu, S.W.2
Chao, H.-C.3
-
35
-
-
34250899311
-
A revised cost-benefit algorithm for solving ECTEP problem with defective materials in product structure diagram
-
S.W. Chiu, C-C. Shih, and Y-S.P. Chiu, A revised cost-benefit algorithm for solving ECTEP problem with defective materials in product structure diagram. P I Mech Eng Part B: Journal of Engineering Manufacture, Vol. 221 (3), 2007, pp.489-497.
-
(2007)
P I Mech Eng Part B: Journal of Engineering Manufacture
, vol.221
, Issue.3
, pp. 489-497
-
-
Chiu, S.W.1
Shih, C.-C.2
Chiu, Y.-S.P.3
-
36
-
-
33748703640
-
Determining expedited time and cost of the end product with defective component parts using critical path method (CPM) and time-costing method
-
S.W. Chiu, Y-S.P. Chiu, and C-C. Shih, Determining expedited time and cost of the end product with defective component parts using critical path method (CPM) and time-costing method. Journal of Scientific & Industrial Research, Vol. 65(9), 2006 pp.695-701.
-
(2006)
Journal of Scientific & Industrial Research
, vol.65
, Issue.9
, pp. 695-701
-
-
Chiu, S.W.1
Chiu, Y.-S.P.2
Shih, C.-C.3
|