Volumn 136, Issue 1, 2010, Pages 127-135

Research validation: Challenges and opportunities in the construction domain

Author keywords

Control methods; Delphi method; Methodology; Models; Research needs; Sampling design; Statistical analysis; Surveys; Validation; Verification

Indexed keywords

CONTROL METHODS; DELPHI METHOD; RESEARCH NEEDS; SAMPLING DESIGN; STATISTICAL ANALYSIS;

EID: 75649091890     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)CO.1943-7862.0000025     Document Type: Article
Times cited : (182)

References (62)
  • 1
    • 0028457078 scopus 로고
    • Fitting beta distributions based on sample data
    • 0733-9364. 10.1061/(ASCE)0733-9364(1994)120:2(288)
    • AbouRizk, S. M., Halpin, D. W., and Wilson, J. R. (1994). " Fitting beta distributions based on sample data.." J. Constr. Eng. Manage. 0733-9364, 120 (2), 288-305. 10.1061/(ASCE)0733-9364(1994)120:2(288)
    • (1994) J. Constr. Eng. Manage. , vol.120 , Issue.2 , pp. 288-305
    • Abourizk, S.M.1    Halpin, D.W.2    Wilson, J.R.3
  • 4
    • 0003692391 scopus 로고
    • Wadsworth, Belmont, Calif., 〈〉
    • Babbie, E. (1990). Survey research methods, Wadsworth, Belmont, Calif., 〈 http://www.cengage.com/wadsworth 〉.
    • (1990) Survey Research Methods
    • Babbie, E.1
  • 5
    • 20344396012 scopus 로고    scopus 로고
    • Organizational research: Determining appropriate sample size in survey research
    • Bartlett, J. E., Kotrlik, J. W., and Higgins, C. C. (2001). " Organizational research: Determining appropriate sample size in survey research.." Business Education Index, 19 (1), 43-50.
    • (2001) Business Education Index , vol.19 , Issue.1 , pp. 43-50
    • Bartlett, J.E.1    Kotrlik, J.W.2    Higgins, C.C.3
  • 7
    • 84992985871 scopus 로고    scopus 로고
    • Key influences on construction innovation
    • 1471-4175. 10.1191/1471417504ci073oa
    • Blayse, A. M., and Manley, J. (2004). " Key influences on construction innovation.." Constr. Innovation 1471-4175, 4 (3), 143-154. 10.1191/1471417504ci073oa
    • (2004) Constr. Innovation , vol.4 , Issue.3 , pp. 143-154
    • Blayse, A.M.1    Manley, J.2
  • 9
    • 0035137161 scopus 로고    scopus 로고
    • Case-based reasoning approach in bid decision making
    • DOI 10.1061/(ASCE)0733-9364(2001)127:1(35)
    • Chua, D. K. H., Li, D. Z., and Chan, W. T. (2001). " Case-based reasoning approach in bid decision making.." J. Constr. Eng. Manage. 0733-9364, 127 (1), 35-45. 10.1061/(ASCE)0733-9364(2001)127:1(35) (Pubitemid 32158957)
    • (2001) Journal of Construction Engineering and Management , vol.127 , Issue.1 , pp. 35-45
    • Chua, D.K.H.1    Li, D.Z.2    Chan, W.T.3
  • 10
    • 33750116999 scopus 로고    scopus 로고
    • Construction delivery systems: A comparative analysis of their performance within school districts
    • DOI 10.1061/(ASCE)0733-9364(2006)132:11(1131), 008611QCO
    • Col Debella, D., and Ries, R. (2006). " Construction delivery systems: A comparative analysis of their performance within school districts.." J. Constr. Eng. Manage. 0733-9364, 132 (11), 1131-1138. 10.1061/(ASCE)0733-9364(2006)132:11(1131) (Pubitemid 44592489)
    • (2006) Journal of Construction Engineering and Management , vol.132 , Issue.11 , pp. 1131-1138
    • Col Debella, D.1    Ries, R.2
  • 12
    • 33845945922 scopus 로고
    • Coefficient alpha and the internal structure of tests
    • 0033-3123. 10.1007/BF02310555
    • Cronbach, L. J. (1951). " Coefficient alpha and the internal structure of tests.." Psychometrika 0033-3123, 16 (3), 297-335. 10.1007/BF02310555
    • (1951) Psychometrika , vol.16 , Issue.3 , pp. 297-335
    • Cronbach, L.J.1
  • 15
    • 13944259748 scopus 로고    scopus 로고
    • Integrated methodology for project risk management
    • DOI 10.1061/(ASCE)0733-9364(2002)128:6(473)
    • del Cano, A., and de la Cruz, M. P. (2002). " Integrated methodology for project risk management.." J. Constr. Eng. Manage. 0733-9364, 128 (6), 473-485. 10.1061/(ASCE)0733-9364(2002)128:6(473) (Pubitemid 40265511)
    • (2002) Journal of Construction Engineering and Management , vol.128 , Issue.6 , pp. 473-485
    • Del Cano, A.1    De La Cruz, M.P.2
  • 16
    • 33845769935 scopus 로고    scopus 로고
    • Expanding finance-based scheduling to devise overall-optimized project schedules
    • DOI 10.1061/(ASCE)0733-9364(2007)133:1(86)
    • Elazouni, A. M., and Metwally, F. G. (2007). " Expanding finance-based scheduling to devise overall-optimized project schedules.." J. Constr. Eng. Manage. 0733-9364, 133 (1), 86-90. 10.1061/(ASCE)0733-9364(2007) 133:1(86) (Pubitemid 44975053)
    • (2007) Journal of Construction Engineering and Management , vol.133 , Issue.1 , pp. 86-90
    • Elazouni, A.M.1    Metwally, F.G.2
  • 17
    • 14544284514 scopus 로고    scopus 로고
    • Lessons learned in designing research methodology in field-based construction research
    • DOI 10.1061/(ASCE)1052-3928(2004)130:2(109)
    • El-Diraby, T. E., and O'Connor, J. T. (2004). " Lessons learned in designing research methodology in field-based construction research.." J. Profl. Issues Eng. Educ. Pract. 1052-3928, 130 (2), 109-114. 10.1061/(ASCE)1052-3928(2004)130:2(109) (Pubitemid 40302677)
    • (2004) Journal of Professional Issues in Engineering Education and Practice , vol.130 , Issue.2 , pp. 109-114
    • El-Diraby, T.E.1    O'Connor, J.T.2
  • 18
    • 0034559444 scopus 로고    scopus 로고
    • On criticality and sensitivity in activity networks
    • DOI 10.1016/S0377-2217(99)00483-X
    • Elmaghraby, S. E. (2000). " On criticality and sensitivity in activity networks.." Eur. J. Oper. Res. 0377-2217, 127, 220-238. 10.1016/S0377-2217(99)00483-X (Pubitemid 30964551)
    • (2000) European Journal of Operational Research , vol.127 , Issue.2 , pp. 220-238
    • Elmaghraby, S.E.1
  • 19
    • 75649091762 scopus 로고    scopus 로고
    • FIATECH.. Capital Projects Technology Roadmapping Initiative: Element 4 Tactical Plan, Intelligent and Automated Construction Job Site (IACJS), Fully Integrated and Automated Technologies for Construction, Austin, Tex.
    • FIATECH. (2004). Capital Projects Technology Roadmapping Initiative: Element 4 Tactical Plan, Intelligent and Automated Construction Job Site (IACJS), Fully Integrated and Automated Technologies for Construction, Austin, Tex.
    • (2004)
  • 21
    • 0029361059 scopus 로고
    • Preproject-planning process for capital facilities
    • 0733-9364. 10.1061/(ASCE)0733-9364(1995)121:3(312)
    • Gibson, G. E., Kaczmarowski, J. H., and Lore, H. E. (1995). " Preproject-planning process for capital facilities.." J. Constr. Eng. Manage. 0733-9364, 121 (3), 312-318. 10.1061/(ASCE)0733-9364(1995)121:3(312)
    • (1995) J. Constr. Eng. Manage. , vol.121 , Issue.3 , pp. 312-318
    • Gibson, G.E.1    Kaczmarowski, J.H.2    Lore, H.E.3
  • 22
    • 0027666467 scopus 로고
    • Comparison of two simulation methodologies in construction
    • 0733-9364. 10.1061/(ASCE)0733-9364(1993)119:3(573)
    • González-Quevedo, A., AbouRizk, S. M., Iseley, D. T., and Halpin, D. W. (1993). " Comparison of two simulation methodologies in construction.." J. Constr. Eng. Manage. 0733-9364, 119 (3), 573-589. 10.1061/(ASCE)0733-9364(1993)119:3(573)
    • (1993) J. Constr. Eng. Manage. , vol.119 , Issue.3 , pp. 573-589
    • González-Quevedo, A.1    Abourizk, S.M.2    Iseley, D.T.3    Halpin, D.W.4
  • 25
    • 0031123369 scopus 로고    scopus 로고
    • Fault injection techniques and tools
    • 0018-9162. 10.1109/2.585157
    • Hsueh, M. -C., Tsai, T. K., and Iyer, R. K. (1997). " Fault injection techniques and tools.." Computer 0018-9162, 30 (4), 75-82. 10.1109/2.585157
    • (1997) Computer , vol.30 , Issue.4 , pp. 75-82
    • Hsueh, M.-C.1    Tsai, T.K.2    Iyer, R.K.3
  • 27
    • 8644292857 scopus 로고    scopus 로고
    • Multiple simulation analysis for probabilistic cost and schedule integration
    • DOI 10.1061/(ASCE)0733-9364(2002)128:3(211)
    • Isidore, L. J., and Back, W. E. (2002). " Multiple simulation analysis for probabilistic cost and schedule integration.." J. Constr. Eng. Manage. 0733-9364, 128 (3), 211-219. 10.1061/(ASCE)0733-9364(2002)128:3(211) (Pubitemid 40265546)
    • (2002) Journal of Construction Engineering and Management , vol.128 , Issue.3 , pp. 211-219
    • Isidore, L.J.1    Back, W.E.2
  • 28
    • 0035131721 scopus 로고    scopus 로고
    • VIRCON: Interactive system for teaching construction management
    • DOI 10.1061/(ASCE)0733-9364(2001)127:1(66)
    • Jaafari, A., Manivong, K. K., and Chaaya, M. (2001). " VIRCON: Interactive system for teaching construction management.." J. Constr. Eng. Manage. 0733-9364, 127 (1), 66-75. 10.1061/(ASCE)0733-9364(2001)127:1(66) (Pubitemid 32158961)
    • (2001) Journal of Construction Engineering and Management , vol.127 , Issue.1 , pp. 66-75
    • Jaafari, A.1    Manivong, K.K.2    Chaaya, M.3
  • 29
    • 34250630566 scopus 로고    scopus 로고
    • Linear versus network scheduling: A critical path comparison
    • DOI 10.1061/(ASCE)0733-9364(2007)133:7(483)
    • Kallantzis, A., Soldatos, J., and Lambropoulos, S. (2007). " Linear versus network scheduling: A critical path comparison.." J. Constr. Eng. Manage. 0733-9364, 133 (7), 483-491. 10.1061/(ASCE)0733-9364(2007)133:7(483) (Pubitemid 46935011)
    • (2007) Journal of Construction Engineering and Management , vol.133 , Issue.7 , pp. 483-491
    • Kallantzis, A.1    Soldatos, J.2    Lambropoulos, S.3
  • 30
    • 69949090968 scopus 로고    scopus 로고
    • Interactive discrete-event simulation of construction processes in dynamic immersive 3D virtual worlds
    • eds., Virginia Polytechnic Institute and State University, Blacksburg, Va.
    • Kamat, V. R., and Martínez, J. C. (2003). " Interactive discrete-event simulation of construction processes in dynamic immersive 3D virtual worlds.." Proc., 2003 Conf. on Construction Applications of Virtual Reality, W. Y. Thabet and D. A. Bowman, eds., Virginia Polytechnic Institute and State University, Blacksburg, Va., 197-201.
    • (2003) Proc., 2003 Conf. on Construction Applications of Virtual Reality , pp. 197-201
    • Kamat, V.R.1    Martínez, J.C.2    Thabet, W.Y.3    Bowman, D.A.4
  • 31
    • 34247244757 scopus 로고    scopus 로고
    • Decision analysis applied to tunnel exploration planning. I: Principles and case study
    • DOI 10.1061/(ASCE)0733-9364(2007)133:5(344)
    • Karam, K. S., Karam, J. S., and Einstein, H. H. (2007). " Decision analysis applied to tunnel exploration planning. I: Principles and case study.." J. Constr. Eng. Manage. 0733-9364, 133 (5), 344-353. 10.1061/(ASCE)0733-9364(2007)133:5(344) (Pubitemid 46610038)
    • (2007) Journal of Construction Engineering and Management , vol.133 , Issue.5 , pp. 344-353
    • Karam, K.S.1    Karam, J.S.2    Einstein, H.H.3
  • 33
    • 0030788844 scopus 로고    scopus 로고
    • PSPLIB-A project scheduling problem library
    • 0377-2217. 10.1016/S0377-2217(96)00170-1
    • Kolisch, R., and Sprecher, A. (1996). " PSPLIB-A project scheduling problem library.." Eur. J. Oper. Res. 0377-2217, 96 (1), 205-216. 10.1016/S0377-2217(96)00170-1
    • (1996) Eur. J. Oper. Res. , vol.96 , Issue.1 , pp. 205-216
    • Kolisch, R.1    Sprecher, A.2
  • 34
    • 0000629876 scopus 로고
    • Determining sample size for research activities
    • 0013-1644
    • Krejcie, R. V., and Morgan, D. W. (1970). " Determining sample size for research activities.." Educ. Psychol. Meas. 0013-1644, 30, 607-610.
    • (1970) Educ. Psychol. Meas. , vol.30 , pp. 607-610
    • Krejcie, R.V.1    Morgan, D.W.2
  • 36
    • 14544303228 scopus 로고    scopus 로고
    • Probability of project completion using stochastic project scheduling simulation
    • DOI 10.1061/(ASCE)0733-9364(2005)131:3(310)
    • Lee, D. -E. (2005). " Probability of project completion using stochastic project scheduling simulation.." J. Constr. Eng. Manage. 0733-9364, 131 (3), 310-318. 10.1061/(ASCE)0733-9364(2005)131:3(310) (Pubitemid 40303939)
    • (2005) Journal of Construction Engineering and Management , vol.131 , Issue.3 , pp. 310-318
    • Lee, D.-E.1
  • 38
    • 2542502330 scopus 로고    scopus 로고
    • Model for predicting performance of architects and engineers
    • DOI 10.1061/(ASCE)0733-9364(2002)128:5(446)
    • Ling, Y. Y. (2002). " Model for predicting performance of architects and engineers.." J. Constr. Eng. Manage. 0733-9364, 128 (5), 446-455. 10.1061/(ASCE)0733-9364(2002)128:5(446) (Pubitemid 40265529)
    • (2002) Journal of Construction Engineering and Management , vol.128 , Issue.5 , pp. 446-455
    • Ling, Y.Y.1
  • 40
    • 33745314587 scopus 로고    scopus 로고
    • Statistical considerations for predicting residual value of heavy equipment
    • DOI 10.1061/(ASCE)0733-9364(2006)132:7(723), 009607QCO
    • Lucko, G., Anderson-Cook, C. M., and Vorster, M. C. (2006). " Statistical considerations for predicting residual value of heavy equipment.." J. Constr. Eng. Manage. 0733-9364, 132 (7), 723-732. 10.1061/(ASCE)0733-9364(2006)132:7(723) (Pubitemid 43932178)
    • (2006) Journal of Construction Engineering and Management , vol.132 , Issue.7 , pp. 723-732
    • Lucko, G.1    Anderson-Cook, C.M.2    Vorster, M.C.3
  • 41
    • 33751274213 scopus 로고    scopus 로고
    • Quantitative measurement of successful performance from the project manager's perspective
    • DOI 10.1061/(ASCE)0733-9364(2006)132:12(1284), 005612QCO
    • Menches, C. L., and Hanna, A. S. (2006). " Quantitative measurement of successful performance from the project manager's perspective.." J. Constr. Eng. Manage. 0733-9364, 132 (12), 1284-1293. 10.1061/(ASCE)0733- 9364(2006)132:12(1284) (Pubitemid 44794268)
    • (2006) Journal of Construction Engineering and Management , vol.132 , Issue.12 , pp. 1284-1293
    • Menches, C.L.1    Hanna, A.S.2
  • 43
    • 29044435737 scopus 로고    scopus 로고
    • Development and on-site evaluation of an automated materials management and control model
    • 0733-9364. 10.1061/(ASCE)0733-9364(2005)131:12(1328)
    • Navon, R., and Berkovich, O. (2005). " Development and on-site evaluation of an automated materials management and control model.." J. Constr. Eng. Manage. 0733-9364, 131 (12), 1328-1336. 10.1061/(ASCE)0733- 9364(2005)131:12(1328)
    • (2005) J. Constr. Eng. Manage. , vol.131 , Issue.12 , pp. 1328-1336
    • Navon, R.1    Berkovich, O.2
  • 45
    • 35348843411 scopus 로고    scopus 로고
    • Leadership and cultures of lithuanian and Dutch construction firms
    • DOI 10.1061/(ASCE)0733-9364(2007)133:11(900)
    • Ozorovskaja, R., Voordijk, J. T., and Wilderom, C. P. M. (2007). " Leadership and cultures of Lithuanian and Dutch construction firms.." J. Constr. Eng. Manage. 0733-9364, 133 (11), 900-911. 10.1061/(ASCE)0733-9364(2007) 133:11(900) (Pubitemid 47587933)
    • (2007) Journal of Construction Engineering and Management , vol.133 , Issue.11 , pp. 900-911
    • Ozorovskaja, R.1    Voordijk, J.T.2    Wilderom, C.P.M.3
  • 46
    • 33645127159 scopus 로고    scopus 로고
    • A strategic framework for change management
    • 10.1080/01446190500227011
    • Price, A. D. F., and Chahal, K. (2006). " A strategic framework for change management.." Constr. Manage. Econom., 24 (3), 237-251. 10.1080/01446190500227011
    • (2006) Constr. Manage. Econom. , vol.24 , Issue.3 , pp. 237-251
    • Price, A.D.F.1    Chahal, K.2
  • 47
    • 49749134699 scopus 로고    scopus 로고
    • A message-based architecture to enable runtime user interaction on concurrent simulation-animations of construction operations
    • eds., IEEE, Piscataway, N.J.
    • Rekapalli, P. V., and Martínez, J. C. (2007). " A message-based architecture to enable runtime user interaction on concurrent simulation-animations of construction operations.." Proc., 2007 Winter Simulation Conf., S. G. Henderson, B. Biller, M. -H. Hsieh, J. Shortle, J. D. Tew, and R. R. Barton, eds., IEEE, Piscataway, N.J., 2028-2031.
    • (2007) Proc., 2007 Winter Simulation Conf. , pp. 2028-2031
    • Rekapalli, P.V.1    Martínez, J.C.2    Henderson, S.G.3    Biller, B.4    Hsieh, M.-H.5    Shortle, J.6    Tew, J.D.7    Barton, R.R.8
  • 48
    • 12744251335 scopus 로고    scopus 로고
    • Is construction labor productivity really declining?
    • DOI 10.1061/(ASCE)0733-9364(2003)129:1(41)
    • Rojas, E. M., and Aramvareekul, P. (2003). " Is construction labor productivity really declining? " J. Constr. Eng. Manage. 0733-9364, 129 (1), 41-46. 10.1061/(ASCE)0733-9364(2003)129:1(41) (Pubitemid 40265500)
    • (2003) Journal of Construction Engineering and Management , vol.129 , Issue.1 , pp. 41-46
    • Rojas, E.M.1    Aramvareekul, P.2
  • 49
    • 37248999313 scopus 로고    scopus 로고
    • Developing a state-of-the-art facility to support construction research and education: A case study
    • DOI 10.1061/(ASCE)1052-3928(2008)134:1(67)
    • Rojas, E. M., and Dossick, C. S. (2008). " Developing a state-of-the-art facility to support construction research and education: A case study.." J. Profl. Issues Eng. Educ. Pract. 1052-3928, 134 (1), 67-74. 10.1061/(ASCE)1052-3928(2008)134:1(67) (Pubitemid 350265411)
    • (2008) Journal of Professional Issues in Engineering Education and Practice , vol.134 , Issue.1 , pp. 67-74
    • Rojas, E.M.1    Dossick, C.S.2
  • 50
    • 43949099303 scopus 로고    scopus 로고
    • Comparative analysis of project delivery systems cost performance in Pacific Northwest public schools
    • DOI 10.1061/(ASCE)0733-9364(2008)134:6(387)
    • Rojas, E. M., and Kell, I. (2008). " Comparative analysis of project delivery systems cost performance in Pacific Northwest public schools.." J. Constr. Eng. Manage. 0733-9364, 134 (6), 387-397. 10.1061/(ASCE)0733- 9364(2008)134:6(387) (Pubitemid 351707077)
    • (2008) Journal of Construction Engineering and Management , vol.134 , Issue.6 , pp. 387-397
    • Rojas, E.M.1    Kell, I.2
  • 51
    • 33646174007 scopus 로고    scopus 로고
    • A multi-agent framework for general-purpose situational simulations in the construction management domain
    • 0887-3801. 10.1061/(ASCE)0887-3801(2006)20:3(165)
    • Rojas, E. M., and Mukherjee, A. (2006). " A multi-agent framework for general-purpose situational simulations in the construction management domain.." J. Comput. Civ. Eng. 0887-3801, 20 (3), 165-176. 10.1061/(ASCE)0887-3801(2006)20:3(165)
    • (2006) J. Comput. Civ. Eng. , vol.20 , Issue.3 , pp. 165-176
    • Rojas, E.M.1    Mukherjee, A.2
  • 52
    • 0028497319 scopus 로고
    • Validation of knowledge-based system with multiple bridge rail experts
    • 0733-947X. 10.1061/(ASCE)0733-947X(1994)120:5(787)
    • Roschke, P. N. (1994). " Validation of knowledge-based system with multiple bridge rail experts.." J. Transp. Eng. 0733-947X, 120 (5), 787-806. 10.1061/(ASCE)0733-947X(1994)120:5(787)
    • (1994) J. Transp. Eng. , vol.120 , Issue.5 , pp. 787-806
    • Roschke, P.N.1
  • 54
    • 84952126648 scopus 로고
    • Validation of regression models: Methods and examples
    • 0040-1706. 10.2307/1267881
    • Snee, R. D. (1977). " Validation of regression models: Methods and examples.." Technometrics 0040-1706, 19 (4), 415-428. 10.2307/1267881
    • (1977) Technometrics , vol.19 , Issue.4 , pp. 415-428
    • Snee, R.D.1
  • 56
    • 0032673945 scopus 로고    scopus 로고
    • Loss of labor productivity due to delivery methods and weather
    • 0733-9364. 10.1061/(ASCE)0733-9364(1999)125:1(39)
    • Thomas, H. R., Riley, D. R., and Sanvido, V. E. (1999). " Loss of labor productivity due to delivery methods and weather.." J. Constr. Eng. Manage. 0733-9364, 125 (1), 39-46. 10.1061/(ASCE)0733-9364(1999)125:1(39)
    • (1999) J. Constr. Eng. Manage. , vol.125 , Issue.1 , pp. 39-46
    • Thomas, H.R.1    Riley, D.R.2    Sanvido, V.E.3
  • 57
    • 33645501149 scopus 로고    scopus 로고
    • Work continuity constraints in project scheduling
    • 0733-9364. 10.1061/(ASCE)0733-9364(2006)132:1(14)
    • Vanhoucke, M. (2006). " Work continuity constraints in project scheduling.." J. Constr. Eng. Manage. 0733-9364, 132 (1), 14-25. 10.1061/(ASCE)0733-9364(2006)132:1(14)
    • (2006) J. Constr. Eng. Manage. , vol.132 , Issue.1 , pp. 14-25
    • Vanhoucke, M.1
  • 59
    • 33750118745 scopus 로고    scopus 로고
    • Investigation of critical success factors in construction project briefing by way of content analysis
    • DOI 10.1061/(ASCE)0733-9364(2006)132:11(1178), 004611QCO
    • Yu, A. T. W., Shen, Q., Kelly, J., and Hunter, K. (2006). " Investigation of critical success factors in construction project briefing by way of content analysis.." J. Constr. Eng. Manage. 0733-9364, 132 (11), 1178-1186. 10.1061/(ASCE)0733-9364(2006)132:11(1178) (Pubitemid 44592494)
    • (2006) Journal of Construction Engineering and Management , vol.132 , Issue.11 , pp. 1178-1186
    • Yu, A.T.W.1    Shen, Q.2    Kelly, J.3    Hunter, K.4
  • 60
    • 20444495592 scopus 로고    scopus 로고
    • Pile construction productivity assessment
    • DOI 10.1061/(ASCE)0733-9364(2005)131:6(705)
    • Zayed, T. M., and Halpin, D. W. (2005a). " Pile construction productivity assessment.." J. Constr. Eng. Manage. 0733-9364, 131 (6), 705-714. 10.1061/(ASCE)0733-9364(2005)131:6(705) (Pubitemid 40818738)
    • (2005) Journal of Construction Engineering and Management , vol.131 , Issue.6 , pp. 705-714
    • Zayed, T.M.1    Halpin, D.W.2
  • 61
    • 23044480533 scopus 로고    scopus 로고
    • Productivity and cost regression models for pile construction
    • DOI 10.1061/(ASCE)0733-9364(2005)131:7(779)
    • Zayed, T. M., and Halpin, D. W. (2005b). " Productivity and cost regression models for pile construction.." J. Constr. Eng. Manage. 0733-9364, 131 (7), 779-789. 10.1061/(ASCE)0733-9364(2005)131:7(779) (Pubitemid 41068299)
    • (2005) Journal of Construction Engineering and Management , vol.131 , Issue.7 , pp. 779-789
    • Zayed, T.M.1    Halpin, D.W.2
  • 62
    • 2142790285 scopus 로고    scopus 로고
    • Iconic animation for activity-based construction simulation
    • DOI 10.1061/(ASCE)0887-3801(2002)16:3(157)
    • Zhang, H., Shi, J. J., and Tam, C. M. (2002). " Iconic animation for activity-based construction simulation.." J. Comput. Civ. Eng. 0887-3801, 16 (3), 157-164. 10.1061/(ASCE)0887-3801(2002)16:3(157) (Pubitemid 40475486)
    • (2002) Journal of Computing in Civil Engineering , vol.16 , Issue.3 , pp. 157-164
    • Zhang, H.1    Shi, J.J.2    Tam, C.M.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.