Volumn 131, Issue 3, 2005, Pages 310-318

Probability of project completion using stochastic project scheduling simulation

Author keywords

Critical path method; Monte carlo method; Probability; Risk analysis; Scheduling; Simulation; Stochastic models

Indexed keywords

CRITICAL PATH METHOD; PROGRAM EVALUATION AND REVIEW TECHNIQUE (PERT); RISK ANALYSIS; STOCHASTIC MODELS;

EID: 14544303228     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0733-9364(2005)131:3(310)     Document Type: Article
Times cited : (71)

References (26)
  • 1
    • 0026913088 scopus 로고
    • Statistical properties of construction duration data
    • AbouRizk, S. M., and Halpin, D. W. (1992). "Statistical properties of construction duration data." J. Constr. Eng. Manage., 118(3), 525-544.
    • (1992) J. Constr. Eng. Manage. , vol.118 , Issue.3 , pp. 525-544
    • Abourizk, S.M.1    Halpin, D.W.2
  • 2
    • 0022404044 scopus 로고
    • Simulation model to forecast project completion time
    • Ahuja, N. T. H., and Nandakumar, V. (1985). "Simulation model to forecast project completion time." J. Constr. Eng. Manage., 111(4), 325-342.
    • (1985) J. Constr. Eng. Manage. , vol.111 , Issue.4 , pp. 325-342
    • Ahuja, N.T.H.1    Nandakumar, V.2
  • 3
    • 0003284006 scopus 로고
    • Probability concepts in engineering planning and design
    • Wiley, New York
    • Ang, A. H-S., and Tang, W. H. (1975). "Probability concepts in engineering planning and design." Analytical models of random phenomena, Vol. 1, Wiley, New York, 80-169.
    • (1975) Analytical Models of Random Phenomena , vol.1 , pp. 80-169
    • Ang, A.H.-S.1    Tang, W.H.2
  • 4
    • 14544296426 scopus 로고
    • Professional construction management including CM, design-contract and general contracting
    • McGraw-Hill, New York
    • Barrie, D. S., and Paulson, B. C. (1992). "Professional construction management including CM, design-contract and general contracting." Planning and controlling of operations and resources, 3rd Ed., McGraw-Hill, New York, 252-303.
    • (1992) Planning and Controlling of Operations and Resources, 3rd Ed. , pp. 252-303
    • Barrie, D.S.1    Paulson, B.C.2
  • 5
    • 0003835346 scopus 로고
    • PhD thesis, Univ. of Michigan, Ann Arbor, Mich.
    • Chang, D. (1987). "RESQUE." PhD thesis, Univ. of Michigan, Ann Arbor, Mich.
    • (1987) RESQUE
    • Chang, D.1
  • 6
    • 14544271266 scopus 로고    scopus 로고
    • Spreadsheet modeling and decision analysis: Apractical introduction to management science
    • South-Westem College Publishers, Cincinnati
    • Cliff, R. T. (2001). "Spreadsheet modeling and decision analysis: Apractical introduction to management science." Introduction to simulation using Crystal Ball, 3rd Ed., South-Westem College Publishers, Cincinnati.
    • (2001) Introduction to Simulation Using Crystal Ball, 3rd Ed.
    • Cliff, R.T.1
  • 9
    • 0033314271 scopus 로고    scopus 로고
    • Defining a Beta distribution function for construction simulation
    • P. A. Farrington, H. B. Nembhard, D. T. Sturrock, and G. W. Evans, eds., IEEE, Piscataway, N.J.
    • Fente, J., Knutson, K., and Schexnayder, C. (1999). "Defining a Beta distribution function for construction simulation." Proc., 1999 Winter Simulation Conf., P. A. Farrington, H. B. Nembhard, D. T. Sturrock, and G. W. Evans, eds., IEEE, Piscataway, N.J., 1010-1015.
    • (1999) Proc., 1999 Winter Simulation Conf. , pp. 1010-1015
    • Fente, J.1    Knutson, K.2    Schexnayder, C.3
  • 10
    • 0033315084 scopus 로고    scopus 로고
    • Simphony: An environment for building special purpose construction simulation tools
    • IEEE, Piscataway, N.J.
    • Hajjar, D., and AbouRizk, S. M. (1999). "Simphony: An environment for building special purpose construction simulation tools." Proc., 1999 Winter Simulation Conf., IEEE, Piscataway, N.J., 998-1006.
    • (1999) Proc., 1999 Winter Simulation Conf. , pp. 998-1006
    • Hajjar, D.1    Abourizk, S.M.2
  • 11
    • 0017539255 scopus 로고
    • CYCLONE - A method for modeling job site processes
    • Halpin, D. W. (1977). "CYCLONE - A method for modeling job site processes." J. Constr. Div., Am. Soc. Civ. Eng., 103(3), 489-499.
    • (1977) J. Constr. Div., Am. Soc. Civ. Eng. , vol.103 , Issue.3 , pp. 489-499
    • Halpin, D.W.1
  • 15
    • 0003656321 scopus 로고
    • Dept. of Civil Engineering, The University of Michigan Press, Ann Arbor, Mich.
    • Ioannou, P. G. (1989). UM_CYCLONE user's guide, Dept. of Civil Engineering, The University of Michigan Press, Ann Arbor, Mich.
    • (1989) UM_CYCLONE User's Guide
    • Ioannou, P.G.1
  • 16
    • 14544298143 scopus 로고    scopus 로고
    • Fundamentals of system engineering with economics, probability, and statistics
    • Prentice Hall, Upper Saddle River, N.J.
    • Khisty, C, J., and Mohammadi, J. (2001). "Fundamentals of system engineering with economics, probability, and statistics." Principles of probability, Prentice Hall, Upper Saddle River, N.J., 131-150, 294-313.
    • (2001) Principles of Probability , pp. 131-150
    • Khisty, C.J.1    Mohammadi, J.2
  • 18
    • 0032677122 scopus 로고    scopus 로고
    • General purpose systems for effective construction simulation
    • Martinez, J. C., and Ioannou, P. G. (1999). "General purpose systems for effective construction simulation." J. Constr. Eng. Manage., 125(4), 265-276.
    • (1999) J. Constr. Eng. Manage. , vol.125 , Issue.4 , pp. 265-276
    • Martinez, J.C.1    Ioannou, P.G.2
  • 19
    • 0017949082 scopus 로고
    • Interactive graphics for simulating construction operations
    • Paulson, B. C. (1978). "Interactive graphics for simulating construction operations." J. Constr. Div., Am. Soc. Civ. Eng., 104(1), 69-76.
    • (1978) J. Constr. Div., Am. Soc. Civ. Eng. , vol.104 , Issue.1 , pp. 69-76
    • Paulson, B.C.1
  • 20
    • 0031351669 scopus 로고    scopus 로고
    • Petri net based simulation of construction schedules
    • S. Andradottir, K. J. Healy, D. H Withers, and B. L. Nelson, eds., Atlanta
    • Sawhney, A. (1997). "Petri Net based simulation of construction schedules." Proc., 1997 Winter Simulation Conf., S. Andradottir, K. J. Healy, D. H Withers, and B. L. Nelson, eds., Atlanta, 1111-1118.
    • (1997) Proc., 1997 Winter Simulation Conf. , pp. 1111-1118
    • Sawhney, A.1
  • 21
    • 0032684768 scopus 로고    scopus 로고
    • Activity-based construction (ABC) modeling and simulation method
    • Shi, J. (1999). "Activity-based construction (ABC) modeling and simulation method." J. Constr. Eng. Manage., 125(5), 354-360.
    • (1999) J. Constr. Eng. Manage. , vol.125 , Issue.5 , pp. 354-360
    • Shi, J.1
  • 23
    • 0003880227 scopus 로고
    • A simulation approach to the selection of construction equipment
    • The Construction Institute, Stanford Univ., Stanford, Calif.
    • Teicholz, P. (1963). "A simulation approach to the selection of construction equipment." Technical Rep. No.26, The Construction Institute, Stanford Univ., Stanford, Calif.
    • (1963) Technical Rep. No.26
    • Teicholz, P.1
  • 24
    • 0028740224 scopus 로고
    • Knowledge-based assembly of simulation networks using construction designs, plans, and methods
    • IEEE, Piscataway, N.J.
    • Tommelein, I. D., Carr, R. I., and Odeh, A. M. (1994). "Knowledge-based assembly of simulation networks using construction designs, plans, and methods." Proc., 1994 Winter Simulation Conf., IEEE, Piscataway, N.J., 1145-1152.
    • (1994) Proc., 1994 Winter Simulation Conf. , pp. 1145-1152
    • Tommelein, I.D.1    Carr, R.I.2    Odeh, A.M.3
  • 25
    • 0000738834 scopus 로고
    • Monte Carlo methods and the PERT problem
    • Van Slyke, M. R. (1963). "Monte Carlo methods and the PERT problem." Oper. Res., 11, 839-860.
    • (1963) Oper. Res. , vol.11 , pp. 839-860
    • Van Slyke, M.R.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.