메뉴 건너뛰기




Volumn 133, Issue 7, 2007, Pages 483-491

Linear versus network scheduling: A critical path comparison

Author keywords

Construction management; Critical path method project management; Scheduling

Indexed keywords

MATHEMATICAL MODELS; OPTIMIZATION; RESOURCE ALLOCATION; SCHEDULING ALGORITHMS;

EID: 34250630566     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0733-9364(2007)133:7(483)     Document Type: Article
Times cited : (19)

References (15)
  • 1
    • 0035482888 scopus 로고    scopus 로고
    • Algorithm for determining controlling path considering resource continuity
    • Ammar, M. A., and Elbeltagi, E. (2001). " Algorithm for determining controlling path considering resource continuity.. " J. Comput. Civ. Eng., 15 (4), 292-298.
    • (2001) J. Comput. Civ. Eng. , vol.15 , Issue.4 , pp. 292-298
    • Ammar, M.A.1    Elbeltagi, E.2
  • 2
    • 0019064535 scopus 로고
    • Construction planning-Beyond the critical path
    • Birrell, G. S. (1980). " Construction planning-Beyond the critical path.. " J. Constr. Div., 106 (3), 389-407.
    • (1980) J. Constr. Div. , vol.106 , Issue.3 , pp. 389-407
    • Birrell, G.S.1
  • 3
    • 12444344998 scopus 로고    scopus 로고
    • Resource-driven scheduling of repetitive activities on construction projects
    • El-Rayes, K., and Moselhi, O. (1998). " Resource-driven scheduling of repetitive activities on construction projects.. " J. Constr. Management & Economics, 16 (4), 433-466.
    • (1998) J. Constr. Management & Economics , vol.16 , Issue.4 , pp. 433-466
    • El-Rayes, K.1    Moselhi, O.2
  • 4
    • 0035132257 scopus 로고    scopus 로고
    • Optimizing resource utilization for repetitive construction projects
    • El-Rayes, K., and Moselhi, O. (2001). " Optimizing resource utilization for repetitive construction projects.. " J. Constr. Eng. Manage., 127 (1), 18-27.
    • (2001) J. Constr. Eng. Manage. , vol.127 , Issue.1 , pp. 18-27
    • El-Rayes, K.1    Moselhi, O.2
  • 5
    • 0000802988 scopus 로고    scopus 로고
    • Linear scheduling model: Development of controlling activity path
    • Harmelink, D. J., and Rowings, E. J. (1998). " Linear scheduling model: Development of controlling activity path.. " J. Constr. Eng. Manage., 124 (4), 263-268.
    • (1998) J. Constr. Eng. Manage. , vol.124 , Issue.4 , pp. 263-268
    • Harmelink, D.J.1    Rowings, E.J.2
  • 6
    • 0000674566 scopus 로고    scopus 로고
    • Scheduling projects with repeating activities
    • Harris, R. B., and Ioannou, P. G. (1998). " Scheduling projects with repeating activities.. " J. Constr. Eng. Manage., 124 (4), 269-278.
    • (1998) J. Constr. Eng. Manage. , vol.124 , Issue.4 , pp. 269-278
    • Harris, R.B.1    Ioannou, P.G.2
  • 7
    • 0035335808 scopus 로고    scopus 로고
    • Cost optimization in projects with repetitive nonserial activities
    • Hegazy, T., and Wassef (2001). " Cost optimization in projects with repetitive nonserial activities.. " J. Constr. Eng. Manage., 127 (3), 183-191.
    • (2001) J. Constr. Eng. Manage. , vol.127 , Issue.3 , pp. 183-191
    • Hegazy, T.1    Wassef2
  • 8
    • 13944262179 scopus 로고    scopus 로고
    • Discussion of Comparison of linear scheduling model and repetitive scheduling method
    • Ioannou, P. G., and Yang, I.-T. (2004). " Discussion of Comparison of linear scheduling model and repetitive scheduling method.. ' " J. Compos. Constr., 8 (3), 461-463.
    • (2004) J. Compos. Constr. , vol.8 , Issue.3 , pp. 461-463
    • Ioannou, P.G.1    Yang, I.-T.2
  • 9
    • 2542468807 scopus 로고    scopus 로고
    • Linear scheduling and critical path determination using minimum and maximum constraints
    • Kallantzis, A., and Lambropoulos, S. (2004a). " Linear scheduling and critical path determination using minimum and maximum constraints.. " Eng., Constr., Archit. Manage., 11 (3), 211-222.
    • (2004) Eng., Constr., Archit. Manage. , vol.11 , Issue.3 , pp. 211-222
    • Kallantzis, A.1    Lambropoulos, S.2
  • 10
    • 13944262179 scopus 로고    scopus 로고
    • Discussion of Comparison of linear scheduling model and repetitive scheduling model
    • Kallantzis, A., and Lambropoulos, S. (2004b). " Discussion of Comparison of linear scheduling model and repetitive scheduling model.. '" J. Compos. Constr., 8 (3), 463-467.
    • (2004) J. Compos. Constr. , vol.8 , Issue.3 , pp. 463-467
    • Kallantzis, A.1    Lambropoulos, S.2
  • 11
    • 34250618335 scopus 로고    scopus 로고
    • Linear project acceleration without increasing production rates
    • Kallantzis, A., and Lambropoulos, S. (2005). " Linear project acceleration without increasing production rates.. " Tech. Chron. Sci. J. TCG, I, 25 (1), 53-63.
    • (2005) Tech. Chron. Sci. J. TCG , vol.25 , Issue.1 , pp. 53-63
    • Kallantzis, A.1    Lambropoulos, S.2
  • 12
    • 13944263588 scopus 로고    scopus 로고
    • Comparison of linear scheduling model and repetitive scheduling method
    • Mattila, K. G., and Park, A. (2003). " Comparison of linear scheduling model and repetitive scheduling method.. " J. Constr. Eng. Manage., 129 (1), 56-64.
    • (2003) J. Constr. Eng. Manage. , vol.129 , Issue.1 , pp. 56-64
    • Mattila, K.G.1    Park, A.2
  • 13
    • 0025447970 scopus 로고
    • RPM: Repetitive project modeling
    • Reda, R. M. (1990). " RPM: repetitive project modeling.. " J. Constr. Eng. Manage., 116 (2), 316-330.
    • (1990) J. Constr. Eng. Manage. , vol.116 , Issue.2 , pp. 316-330
    • Reda, R.M.1
  • 14
    • 0035454491 scopus 로고    scopus 로고
    • Comparison of linear scheduling model (LSM) and critical path method (CPM)
    • Yamin, R. A., and Harmelink, D. J. (2001). " Comparison of linear scheduling model (LSM) and critical path method (CPM).. " J. Constr. Eng. Manage., 127 (5), 374-381.
    • (2001) J. Constr. Eng. Manage. , vol.127 , Issue.5 , pp. 374-381
    • Yamin, R.A.1    Harmelink, D.J.2
  • 15
    • 4043093611 scopus 로고    scopus 로고
    • Scheduling system with focus on practical concerns in repetitive projects
    • Yang, I., and Ioannou, P. G. (2004). " Scheduling system with focus on practical concerns in repetitive projects.. " Construction Management and Economics, 22 (6), 619-630.
    • (2004) Construction Management and Economics , vol.22 , Issue.6 , pp. 619-630
    • Yang, I.1    Ioannou, P.G.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.