Algorithm for determining controlling path considering resource continuity
-
Ammar, M. A., and Elbeltagi, E. (2001). " Algorithm for determining controlling path considering resource continuity.. " J. Comput. Civ. Eng., 15 (4), 292-298.
-
(2001)
J. Comput. Civ. Eng.
, vol.15
, Issue.4
, pp. 292-298
-
-
Ammar, M.A.1
Elbeltagi, E.2
-
2
-
-
0019064535
-
Construction planning-Beyond the critical path
-
Birrell, G. S. (1980). " Construction planning-Beyond the critical path.. " J. Constr. Div., 106 (3), 389-407.
-
(1980)
J. Constr. Div.
, vol.106
, Issue.3
, pp. 389-407
-
-
Birrell, G.S.1
-
3
-
-
12444344998
-
Resource-driven scheduling of repetitive activities on construction projects
-
El-Rayes, K., and Moselhi, O. (1998). " Resource-driven scheduling of repetitive activities on construction projects.. " J. Constr. Management & Economics, 16 (4), 433-466.
-
(1998)
J. Constr. Management & Economics
, vol.16
, Issue.4
, pp. 433-466
-
-
El-Rayes, K.1
Moselhi, O.2
-
4
-
-
0035132257
-
Optimizing resource utilization for repetitive construction projects
-
El-Rayes, K., and Moselhi, O. (2001). " Optimizing resource utilization for repetitive construction projects.. " J. Constr. Eng. Manage., 127 (1), 18-27.
-
(2001)
J. Constr. Eng. Manage.
, vol.127
, Issue.1
, pp. 18-27
-
-
El-Rayes, K.1
Moselhi, O.2
-
5
-
-
0000802988
-
Linear scheduling model: Development of controlling activity path
-
Harmelink, D. J., and Rowings, E. J. (1998). " Linear scheduling model: Development of controlling activity path.. " J. Constr. Eng. Manage., 124 (4), 263-268.
-
(1998)
J. Constr. Eng. Manage.
, vol.124
, Issue.4
, pp. 263-268
-
-
Harmelink, D.J.1
Rowings, E.J.2
-
6
-
-
0000674566
-
Scheduling projects with repeating activities
-
Harris, R. B., and Ioannou, P. G. (1998). " Scheduling projects with repeating activities.. " J. Constr. Eng. Manage., 124 (4), 269-278.
-
(1998)
J. Constr. Eng. Manage.
, vol.124
, Issue.4
, pp. 269-278
-
-
Harris, R.B.1
Ioannou, P.G.2
-
7
-
-
0035335808
-
Cost optimization in projects with repetitive nonserial activities
-
Hegazy, T., and Wassef (2001). " Cost optimization in projects with repetitive nonserial activities.. " J. Constr. Eng. Manage., 127 (3), 183-191.
-
(2001)
J. Constr. Eng. Manage.
, vol.127
, Issue.3
, pp. 183-191
-
-
Hegazy, T.1
Wassef2
-
8
-
-
13944262179
-
Discussion of Comparison of linear scheduling model and repetitive scheduling method
-
Ioannou, P. G., and Yang, I.-T. (2004). " Discussion of Comparison of linear scheduling model and repetitive scheduling method.. ' " J. Compos. Constr., 8 (3), 461-463.
-
(2004)
J. Compos. Constr.
, vol.8
, Issue.3
, pp. 461-463
-
-
Ioannou, P.G.1
Yang, I.-T.2
-
9
-
-
2542468807
-
Linear scheduling and critical path determination using minimum and maximum constraints
-
Kallantzis, A., and Lambropoulos, S. (2004a). " Linear scheduling and critical path determination using minimum and maximum constraints.. " Eng., Constr., Archit. Manage., 11 (3), 211-222.
-
(2004)
Eng., Constr., Archit. Manage.
, vol.11
, Issue.3
, pp. 211-222
-
-
Kallantzis, A.1
Lambropoulos, S.2
-
10
-
-
13944262179
-
Discussion of Comparison of linear scheduling model and repetitive scheduling model
-
Kallantzis, A., and Lambropoulos, S. (2004b). " Discussion of Comparison of linear scheduling model and repetitive scheduling model.. '" J. Compos. Constr., 8 (3), 463-467.
-
(2004)
J. Compos. Constr.
, vol.8
, Issue.3
, pp. 463-467
-
-
Kallantzis, A.1
Lambropoulos, S.2
-
11
-
-
34250618335
-
Linear project acceleration without increasing production rates
-
Kallantzis, A., and Lambropoulos, S. (2005). " Linear project acceleration without increasing production rates.. " Tech. Chron. Sci. J. TCG, I, 25 (1), 53-63.
-
(2005)
Tech. Chron. Sci. J. TCG
, vol.25
, Issue.1
, pp. 53-63
-
-
Kallantzis, A.1
Lambropoulos, S.2
-
12
-
-
13944263588
-
Comparison of linear scheduling model and repetitive scheduling method
-
Mattila, K. G., and Park, A. (2003). " Comparison of linear scheduling model and repetitive scheduling method.. " J. Constr. Eng. Manage., 129 (1), 56-64.
-
(2003)
J. Constr. Eng. Manage.
, vol.129
, Issue.1
, pp. 56-64
-
-
Mattila, K.G.1
Park, A.2
-
13
-
-
0025447970
-
RPM: Repetitive project modeling
-
Reda, R. M. (1990). " RPM: repetitive project modeling.. " J. Constr. Eng. Manage., 116 (2), 316-330.
-
(1990)
J. Constr. Eng. Manage.
, vol.116
, Issue.2
, pp. 316-330
-
-
Reda, R.M.1
-
14
-
-
0035454491
-
Comparison of linear scheduling model (LSM) and critical path method (CPM)
-
Yamin, R. A., and Harmelink, D. J. (2001). " Comparison of linear scheduling model (LSM) and critical path method (CPM).. " J. Constr. Eng. Manage., 127 (5), 374-381.
-
(2001)
J. Constr. Eng. Manage.
, vol.127
, Issue.5
, pp. 374-381
-
-
Yamin, R.A.1
Harmelink, D.J.2
-
15
-
-
4043093611
-
Scheduling system with focus on practical concerns in repetitive projects
-
Yang, I., and Ioannou, P. G. (2004). " Scheduling system with focus on practical concerns in repetitive projects.. " Construction Management and Economics, 22 (6), 619-630.
-
(2004)
Construction Management and Economics
, vol.22
, Issue.6
, pp. 619-630
-
-
Yang, I.1
Ioannou, P.G.2
|