-
2
-
-
84867954072
-
A Multi-Stage Stochastic Integer Programming Approach for Capacity Expansion under Uncertainty
-
Ahmed S, King A, Parija G (2003). A Multi-Stage Stochastic Integer Programming Approach for Capacity Expansion under Uncertainty. J. Global Optim. 26: 3-24.
-
(2003)
J. Global Optim
, vol.26
, pp. 3-24
-
-
Ahmed, S.1
King, A.2
Parija, G.3
-
3
-
-
70349195949
-
An agent based approach for integrating manufacturing operations
-
doi:10.1016/j.ijpe.2006.10.013
-
Anosike AI, Zhang DZ (2007). An agent based approach for integrating manufacturing operations. Int. J. Prod. Econ. doi:10.1016/j.ijpe.2006.10.013.
-
(2007)
Int. J. Prod. Econ
-
-
Anosike, A.I.1
Zhang, D.Z.2
-
4
-
-
70349195949
-
An agent-based approach for integrating manufacturing operations
-
Anosike AI, Zhang DZ (2009). An agent-based approach for integrating manufacturing operations. Int. J. Prod. Econ. 121 (2): 333-352.
-
(2009)
Int. J. Prod. Econ
, vol.121
, Issue.2
, pp. 333-352
-
-
Anosike, A.I.1
Zhang, D.Z.2
-
5
-
-
38349016573
-
Stability and optimality of a multi-product production and storage system under demand uncertainty
-
Arruda EF, Do Val JBR (2008). Stability and optimality of a multi-product production and storage system under demand uncertainty. Eur. J. Oper. Res. 188 (2); 406-427.
-
(2008)
Eur. J. Oper. Res
, vol.188
, Issue.2
, pp. 406-427
-
-
Arruda, E.F.1
Do Val, J.B.R.2
-
6
-
-
0029774985
-
Process planning for aluminum tubes: An engineering operations perspective
-
Balakrishnan A, Brown S (1996). Process planning for aluminum tubes: An engineering operations perspective. Operations Res. 44 (1): 7-20.
-
(1996)
Operations Res
, vol.44
, Issue.1
, pp. 7-20
-
-
Balakrishnan, A.1
Brown, S.2
-
7
-
-
33750466515
-
Multi-period planning and uncertainty issues in cellular manufacturing: A review and future directions
-
Balakrishnan J, Cheng CH (2007). Multi-period planning and uncertainty issues in cellular manufacturing: A review and future directions. Eur. J. Oper. Res. 177 (1): 281-309.
-
(2007)
Eur. J. Oper. Res
, vol.177
, Issue.1
, pp. 281-309
-
-
Balakrishnan, J.1
Cheng, C.H.2
-
8
-
-
34548668647
-
Integrated inventory and inspection policies for stochastic demand
-
Ben-Daya M, Noman SM (2008). Integrated inventory and inspection policies for stochastic demand. Eur. J. Oper. Res. 185 (1): 159-169.
-
(2008)
Eur. J. Oper. Res
, vol.185
, Issue.1
, pp. 159-169
-
-
Ben-Daya, M.1
Noman, S.M.2
-
9
-
-
0028439401
-
Inventory models involving lead time as a decision variable
-
Ben-Daya M, Raouf A (1994). Inventory models involving lead time as a decision variable. J. Oper. Res. Soc. 45 (5): 579-582.
-
(1994)
J. Oper. Res. Soc
, vol.45
, Issue.5
, pp. 579-582
-
-
Ben-Daya, M.1
Raouf, A.2
-
10
-
-
84985855354
-
Vendor performance and alternative manufacturing environments
-
Benton WC, Krajewski LJ (1990). Vendor performance and alternative manufacturing environments. Decision Sci. 21 (2): 403-415.
-
(1990)
Decision Sci
, vol.21
, Issue.2
, pp. 403-415
-
-
Benton, W.C.1
Krajewski, L.J.2
-
11
-
-
0020832935
-
Mathematical programming approaches to capacity-constrained MRP systems: Review formulation and problem reduction
-
Billington PJ, Mcclain JO, Thomas LJ (1983). Mathematical programming approaches to capacity-constrained MRP systems: Review formulation and problem reduction. Manage Sci. 29 (10): 1126-1141.
-
(1983)
Manage Sci
, vol.29
, Issue.10
, pp. 1126-1141
-
-
Billington, P.J.1
McClain, J.O.2
Thomas, L.J.3
-
12
-
-
3543130785
-
Time-based competitiveness
-
in Moody, P. (Ed.), Dow Jones-Irwin, Homewood, IL
-
Blackburn JD (1985). 'Time-based competitiveness', in Moody, P. (Ed.), Strategic Manufacturing: Dynamic New Directions for the 1990s, Dow Jones-Irwin, Homewood, IL.
-
(1985)
Strategic Manufacturing: Dynamic New Directions For the 1990s
-
-
Blackburn, J.D.1
-
13
-
-
0001267220
-
The strategic use of capacity slack in the economic lot scheduling problem with random demand
-
Bourland KE, Yano CA (1994). The strategic use of capacity slack in the economic lot scheduling problem with random demand. Manage. Sci. 40 (12): 1690-1704.
-
(1994)
Manage. Sci
, vol.40
, Issue.12
, pp. 1690-1704
-
-
Bourland, K.E.1
Yano, C.A.2
-
14
-
-
0027624544
-
A structured analysis of material requirements planning systems under combined demand and supply uncertainty
-
Brennan L, Gupta SM (1993). A structured analysis of material requirements planning systems under combined demand and supply uncertainty. Int. J. Prod. Res. 31 (7): 1689-1707.
-
(1993)
Int. J. Prod. Res
, vol.31
, Issue.7
, pp. 1689-1707
-
-
Brennan, L.1
Gupta, S.M.2
-
15
-
-
59649096759
-
Production decisions under joint price and production uncertainty
-
Dalal AJ, Alghalith M (2009) Production decisions under joint price and production uncertainty. Eur. J. Oper. Res. 197 (1): 84-92.
-
(2009)
Eur. J. Oper. Res
, vol.197
, Issue.1
, pp. 84-92
-
-
Dalal, A.J.1
Alghalith, M.2
-
16
-
-
0037151234
-
A model for supply planning under lead time uncertainty
-
Dolgui A, Ould-Louly MA (2002). A model for supply planning under lead time uncertainty. Int. J. Prod. Econ. 78: 145-152.
-
(2002)
Int. J. Prod. Econ
, vol.78
, pp. 145-152
-
-
Dolgui, A.1
Ould-Louly, M.A.2
-
17
-
-
0034250264
-
Methodology for managing the effect of uncertainty in simulation based design
-
Du X, Chen W (2000). Methodology for managing the effect of uncertainty in simulation based design. AIAA J. 38 (8): 1471-1478.
-
(2000)
Aiaa J
, vol.38
, Issue.8
, pp. 1471-1478
-
-
Du, X.1
Chen, W.2
-
18
-
-
0035866458
-
MRP performance effects due to lot size and planned lead-time settings
-
Enns ST (2001). MRP performance effects due to lot size and planned lead-time settings. Int. J. Prod. Res. 39 (3): 461-480.
-
(2001)
Int. J. Prod. Res
, vol.39
, Issue.3
, pp. 461-480
-
-
Enns, S.T.1
-
19
-
-
0005461851
-
MRP modelling via scenarios
-
In: Ciriani TA, Leachman RC (Eds.). John Wiley and Sons
-
Escudero LF, Kamesam PV (1993). MRP modelling via scenarios. In: Ciriani TA, Leachman RC (Eds.) Optimization in Industry. John Wiley and Sons.
-
(1993)
Optimization In Industry
-
-
Escudero, L.F.1
Kamesam, P.V.2
-
20
-
-
0344704224
-
Product platform design to improve commonality in custom products
-
Farrell RS, Simpson TW (2003). Product platform design to improve commonality in custom products. J. Intell. Manuf. 14 (6): 541-556.
-
(2003)
J. Intell. Manuf
, vol.14
, Issue.6
, pp. 541-556
-
-
Farrell, R.S.1
Simpson, T.W.2
-
21
-
-
14344263054
-
Self-configuring components approach to product variant development. Artificial Intelligence for Engineering Design, Anal
-
Germani M, Mandorli F (2004). Self-configuring components approach to product variant development. Artificial Intelligence for Engineering Design, Anal. Manuf. 18: 41-54.
-
(2004)
Manuf
, vol.18
, pp. 41-54
-
-
Germani, M.1
Mandorli, F.2
-
23
-
-
0032627275
-
A net present value to approach to safety stocks in a multi-level MRP system
-
Grubbstrom RW (1999). A net present value to approach to safety stocks in a multi-level MRP system. Int. J. Prod. Econ. 59 (1-3): 361-375.
-
(1999)
Int. J. Prod. Econ
, vol.59
, Issue.1-3
, pp. 361-375
-
-
Grubbstrom, R.W.1
-
24
-
-
0345072526
-
Analysis of an inventory system under supply uncertainty
-
Güllü R, Önol E, Erkip N (1999). Analysis of an inventory system under supply uncertainty. Int. J. Prod. Econ. 59 (1-3), 377-385.
-
(1999)
Int. J. Prod. Econ
, vol.59
, Issue.1-3
, pp. 377-385
-
-
Güllü, R.1
Önol, E.2
Erkip, N.3
-
25
-
-
0034175277
-
A review of techniques for buffering against uncertainty with MRP systems
-
Guide VDR, Srivastava R (2000). A review of techniques for buffering against uncertainty with MRP systems. Prod. Plan. Control, 11 (3): 223-233.
-
(2000)
Prod. Plan. Control
, vol.11
, Issue.3
, pp. 223-233
-
-
Guide, V.D.R.1
Srivastava, R.2
-
26
-
-
0033079082
-
Some stochastic inventory models with deterministic variable lead time
-
Hariga M, Ben-Daya M (1999). Some stochastic inventory models with deterministic variable lead time. Eur. J. Oper. Res. 113, 42-51.
-
(1999)
Eur. J. Oper. Res
, vol.113
, pp. 42-51
-
-
Hariga, M.1
Ben-Daya, M.2
-
27
-
-
33646384940
-
Product line design with component commonality and cost-reduction effort
-
Heese HS, Swaminathan JM (2006). Product line design with component commonality and cost-reduction effort. Manuf. Serv. Oper. Manage. 8 (2): 206-219.
-
(2006)
Manuf. Serv. Oper. Manage
, vol.8
, Issue.2
, pp. 206-219
-
-
Heese, H.S.1
Swaminathan, J.M.2
-
28
-
-
0037120624
-
The costs and benefits of commonality in assemble-to-order systems with a (Q, r)-policy for component replenishment
-
Hillier MS (2002). The costs and benefits of commonality in assemble-to-order systems with a (Q, r)-policy for component replenishment. Eur. J. Oper. Res. 141 (3), 570-586.
-
(2002)
Eur. J. Oper. Res
, vol.141
, Issue.3
, pp. 570-586
-
-
Hillier, M.S.1
-
29
-
-
0029734543
-
An investigation of alternative dampening procedures to cope with MRP system nervousness
-
Ho CJ, Carter PL (1996). An investigation of alternative dampening procedures to cope with MRP system nervousness. Int. J. Prod. Res. 34 (1), 137-156.
-
(1996)
Int. J. Prod. Res
, vol.34
, Issue.1
, pp. 137-156
-
-
Ho, C.J.1
Carter, P.L.2
-
30
-
-
70449383987
-
Uncertainty dampening methods for reducing MRP system nervousness
-
Ho CJ, Law WK, Rampal R (1995). Uncertainty dampening methods for reducing MRP system nervousness. Int. J. Prod. Res. 33 (2): 483-496.
-
(1995)
Int. J. Prod. Res
, vol.33
, Issue.2
, pp. 483-496
-
-
Ho, C.J.1
Law, W.K.2
Rampal, R.3
-
31
-
-
0029344857
-
Joint investment in quality improvement and setup reduction
-
Hong JD, Hayya JC (1995). Joint investment in quality improvement and setup reduction. Comput. Oper. Res. 22: 567-574.
-
(1995)
Comput. Oper. Res
, vol.22
, pp. 567-574
-
-
Hong, J.D.1
Hayya, J.C.2
-
32
-
-
0035314299
-
Possibilistic programming in production planning of assemble-to-order environments
-
Hsu H, Wang W (2001). Possibilistic programming in production planning of assemble-to-order environments. Fuzzy Sets and Syst. 119 (1): 59-70.
-
(2001)
Fuzzy Sets and Syst
, vol.119
, Issue.1
, pp. 59-70
-
-
Hsu, H.1
Wang, W.2
-
33
-
-
0020203987
-
Analysis of material and capacity requirements with Q-GERT
-
Huang PY, Clayton ER, Moore LJ (1982). Analysis of material and capacity requirements with Q-GERT. Int. J. Prod. Res. 20 (6): 701-713.
-
(1982)
Int. J. Prod. Res
, vol.20
, Issue.6
, pp. 701-713
-
-
Huang, P.Y.1
Clayton, E.R.2
Moore, L.J.3
-
34
-
-
0022161887
-
Integrating the MRP-based control level and the multistage shop level of a manufacturing system via network simulation
-
Huang PY, Rees LP, Taylor BW (1985). Integrating the MRP-based control level and the multistage shop level of a manufacturing system via network simulation. Int. J. Prod. Res. 23 (6): 1217-1231.
-
(1985)
Int. J. Prod. Res
, vol.23
, Issue.6
, pp. 1217-1231
-
-
Huang, P.Y.1
Rees, L.P.2
Taylor, B.W.3
-
35
-
-
0027560761
-
Multiproduct economic lot size models with investments costs for setup reduction and quality improvement
-
Hwang H, Kim DB, Kim YD (1993). Multiproduct economic lot size models with investments costs for setup reduction and quality improvement. Int. J. Prod. Res. 31: 691-703.
-
(1993)
Int. J. Prod. Res
, vol.31
, pp. 691-703
-
-
Hwang, H.1
Kim, D.B.2
Kim, Y.D.3
-
36
-
-
35348946887
-
Analysis of an industrial component commonality problem
-
Jans R, Degraeve Z, Schepens L (2008). Analysis of an industrial component commonality problem. Eur. J. Oper. Res. 186 (2): 801-811.
-
(2008)
Eur. J. Oper. Res
, vol.186
, Issue.2
, pp. 801-811
-
-
Jans, R.1
Degraeve, Z.2
Schepens, L.3
-
37
-
-
0040810819
-
Understanding Product Family for Mass Customization by Developing Commonality Indices
-
Jiao J, Tseng MM (2000). Understanding Product Family for Mass Customization by Developing Commonality Indices. J. Eng. Design, 11 (3): 225-243.
-
(2000)
J. Eng. Design
, vol.11
, Issue.3
, pp. 225-243
-
-
Jiao, J.1
Tseng, M.M.2
-
38
-
-
0032643783
-
A methodology of developing product family architecture for mass customization
-
Jiao RJ, Tseng MM (1999). A methodology of developing product family architecture for mass customization. J. Intel. Manuf. 10: 3-20.
-
(1999)
J. Intel. Manuf
, vol.10
, pp. 3-20
-
-
Jiao, R.J.1
Tseng, M.M.2
-
39
-
-
0034467625
-
Generic bill-of-material-and-operations for high-variety production management
-
Jiao RJ, Tseng MM, Ma S, Zhou Y (2000). Generic bill-of-material-and-operations for high-variety production management. Concurrent Engineering: Res. Appl. 8 (4): 297-321.
-
(2000)
Concurrent Engineering: Res. Appl
, vol.8
, Issue.4
, pp. 297-321
-
-
Jiao, R.J.1
Tseng, M.M.2
Ma, S.3
Zhou, Y.4
-
40
-
-
0032366810
-
The Value of Using Scheduling Information in Planning Material Requirements*
-
John JK, Sridharan V (1998). The Value of Using Scheduling Information in Planning Material Requirements*. Decision Sci. 29 (2): 479-496.
-
(1998)
Decision Sci
, vol.29
, Issue.2
, pp. 479-496
-
-
John, J.K.1
Sridharan, V.2
-
42
-
-
38249032550
-
Impact of investing in quality improvement on the lot size model. OMEGA
-
Keller G, Noori H (1988). Impact of investing in quality improvement on the lot size model. OMEGA Int. J. Manage. Sci. 15: 595-601.
-
(1988)
Int. J. Manage. Sci
, vol.15
, pp. 595-601
-
-
Keller, G.1
Noori, H.2
-
43
-
-
0032320279
-
Manufacturing lot-sizing under MRP II environment: An improved analytical model & a heuristic procedure
-
Kim HJ, Hosni YA (1998). Manufacturing lot-sizing under MRP II environment: An improved analytical model & a heuristic procedure. Comput. Ind. Eng. 35 (3-4): 423-426.
-
(1998)
Comput. Ind. Eng
, vol.35
, Issue.3-4
, pp. 423-426
-
-
Kim, H.J.1
Hosni, Y.A.2
-
44
-
-
17444379378
-
Integrated quality and quantity modeling of a production line
-
Kim J, Gershwin SB (2005). Integrated quality and quantity modeling of a production line. OR Spectrum, 27 (2-3): 287-314.
-
(2005)
Or Spectrum
, vol.27
, Issue.2-3
, pp. 287-314
-
-
Kim, J.1
Gershwin, S.B.2
-
45
-
-
0031069689
-
A stochastic linear programming approach to hierarchical production planning
-
Kira D, Kusy M, Rakita I (1997). A stochastic linear programming approach to hierarchical production planning. J. Oper. Res. Soc. 48: 207-211.
-
(1997)
J. Oper. Res. Soc
, vol.48
, pp. 207-211
-
-
Kira, D.1
Kusy, M.2
Rakita, I.3
-
46
-
-
33645806554
-
A knowledge management approach for managing uncertainty in manufacturing
-
Koh SCL, Gunasekaran A (2006). A knowledge management approach for managing uncertainty in manufacturing. Ind. Manage. Data Syst. 106 (4): 439-459.
-
(2006)
Ind. Manage. Data Syst
, vol.106
, Issue.4
, pp. 439-459
-
-
Koh, S.C.L.1
Gunasekaran, A.2
-
47
-
-
0037323569
-
MRP-controlled manufacturing environment disturbed by uncertainty
-
Koh SCL, Saad SM (2003). MRP-controlled manufacturing environment disturbed by uncertainty. Robotics and Computer-Integrated Manufacturing 19 (1-2): 157-171.
-
(2003)
Robotics and Computer-integrated Manufacturing
, vol.19
, Issue.1-2
, pp. 157-171
-
-
Koh, S.C.L.1
Saad, S.M.2
-
48
-
-
0037054916
-
Uncertainty under MRP-planned manufacture: Review and categorisation
-
Koh SCL, Saad SM, Jones MH (2002). Uncertainty under MRP-planned manufacture: Review and categorisation. Int. J. Prod. Res. 40 (10): 2399-2421.
-
(2002)
Int. J. Prod. Res
, vol.40
, Issue.10
, pp. 2399-2421
-
-
Koh, S.C.L.1
Saad, S.M.2
Jones, M.H.3
-
49
-
-
27544508424
-
A combinatorial manufacturing resource planning model for long-term CNC machining industry
-
Lan CH, Lan TS (2005). A combinatorial manufacturing resource planning model for long-term CNC machining industry. Int. J. Adv. Manuf. Technol. 26: 1157-1162.
-
(2005)
Int. J. Adv. Manuf. Technol
, vol.26
, pp. 1157-1162
-
-
Lan, C.H.1
Lan, T.S.2
-
50
-
-
0031377329
-
Simulation of Manufacturing Systems
-
In: Andradóttir S, Healy KJ, Withers DH, Nelson BL (Eds.), Renaissance Waverly Hotel, Atlanta, GA
-
Law AM, Mccomas MG (1997). Simulation of Manufacturing Systems. In: Andradóttir S, Healy KJ, Withers DH, Nelson BL (Eds.) Winter Simulation Conference. Renaissance Waverly Hotel, Atlanta, GA.
-
(1997)
Winter Simulation Conference
-
-
Law, A.M.1
McComas, M.G.2
-
51
-
-
33847296636
-
A robust optimization model for multi-site production planning problem in an uncertain environment
-
Leung SCH, Tsang SOS, Ng WL, Wu Y (2007). A robust optimization model for multi-site production planning problem in an uncertain environment. Eur. J. Oper. Res. 181: 224-238.
-
(2007)
Eur. J. Oper. Res
, vol.181
, pp. 224-238
-
-
Leung, S.C.H.1
Tsang, S.O.S.2
Ng, W.L.3
Wu, Y.4
-
52
-
-
0002505095
-
An analytical determination of lead time with normal demand
-
Liao CJ, Shyu CH (1991). An analytical determination of lead time with normal demand. Int. J. Oper. Prod. Manage. 11: 72-78.
-
(1991)
Int. J. Oper. Prod. Manage
, vol.11
, pp. 72-78
-
-
Liao, C.J.1
Shyu, C.H.2
-
54
-
-
0036833069
-
Commonality and postponement in multistage assembly systems
-
Ma SH, Wang W, Liu LM (2002). Commonality and postponement in multistage assembly systems. Eur. J. Oper. Res. 142 (3): 523-538.
-
(2002)
Eur. J. Oper. Res
, vol.142
, Issue.3
, pp. 523-538
-
-
Ma, S.H.1
Wang, W.2
Liu, L.M.3
-
55
-
-
0001900362
-
Comparison between simple infinite loading and loading considering a workload status under uncertainty in job operation times
-
Matsuura H, Tsubone H, Kataoka K (1995). Comparison between simple infinite loading and loading considering a workload status under uncertainty in job operation times. Int. J. Prod. Econ. 40 (1): 45-55.
-
(1995)
Int. J. Prod. Econ
, vol.40
, Issue.1
, pp. 45-55
-
-
Matsuura, H.1
Tsubone, H.2
Kataoka, K.3
-
56
-
-
0035924657
-
Improving manufacturing costs and lead times with quality-oriented operating curves
-
Mayer M, Nusswald M (2001). Improving manufacturing costs and lead times with quality-oriented operating curves. J. Mater. Process Technol. 119 (1-3): 83-89.
-
(2001)
J. Mater. Process Technol
, vol.119
, Issue.1-3
, pp. 83-89
-
-
Mayer, M.1
Nusswald, M.2
-
57
-
-
0031553259
-
Fuzzy production planning model for fresh tomato packing
-
Miller WA, Leung LC, Azhar TM, Sargent S (1997). Fuzzy production planning model for fresh tomato packing. Int. J. Prod. Econ. 53 (3-4): 227-238.
-
(1997)
Int. J. Prod. Econ
, vol.53
, Issue.3-4
, pp. 227-238
-
-
Miller, W.A.1
Leung, L.C.2
Azhar, T.M.3
Sargent, S.4
-
58
-
-
0025206966
-
Interaction effects on MRP nervousness
-
Minifie JR, Davis RA (1990). Interaction effects on MRP nervousness. Int. J. Prod. Res. 28 (1): 173-183.
-
(1990)
Int. J. Prod. Res
, vol.28
, Issue.1
, pp. 173-183
-
-
Minifie, J.R.1
Davis, R.A.2
-
59
-
-
11244335426
-
Component commonality: Models with product-specific service constraints
-
Mirchandani P, Mishra AK (2002). Component commonality: models with product-specific service constraints. Prod. Oper. Manage, 11 (2): 199-215.
-
(2002)
Prod. Oper. Manage
, vol.11
, Issue.2
, pp. 199-215
-
-
Mirchandani, P.1
Mishra, A.K.2
-
60
-
-
20344396080
-
The impact of component commonality in an assemble-to-order environment under supply and demand uncertainty
-
Mohebbi E, Choobineh F (2005). The impact of component commonality in an assemble-to-order environment under supply and demand uncertainty. Omega, Int. J. Manage. Sci. 33: 472-482.
-
(2005)
Omega, Int. J. Manage. Sci
, vol.33
, pp. 472-482
-
-
Mohebbi, E.1
Choobineh, F.2
-
61
-
-
0032210280
-
A note on lead time and distributional assumptions in continuous review inventory models
-
Moon I, Choi S (1998). A note on lead time and distributional assumptions in continuous review inventory models. Comp. Oper. Res. 25: 1007-1012.
-
(1998)
Comp. Oper. Res
, vol.25
, pp. 1007-1012
-
-
Moon, I.1
Choi, S.2
-
62
-
-
67649410319
-
Joint procurement and production decisions in remanufacturing under quality and demand uncertainty
-
Mukhopadhyay SK, Ma H (2009). Joint procurement and production decisions in remanufacturing under quality and demand uncertainty. Int. J. Prod. Econ. 120 (1): 5-17.
-
(2009)
Int. J. Prod. Econ
, vol.120
, Issue.1
, pp. 5-17
-
-
Mukhopadhyay, S.K.1
Ma, H.2
-
63
-
-
27344448554
-
MRP with flexible constraints: A fuzzy mathematical programming approach
-
Mula J, Poler R, Garcia JP (2006). MRP with flexible constraints: A fuzzy mathematical programming approach. Fuzzy Sets Syst. 157: 74-97.
-
(2006)
Fuzzy Sets Syst
, vol.157
, pp. 74-97
-
-
Mula, J.1
Poler, R.2
Garcia, J.P.3
-
64
-
-
33846833792
-
Material Requirement Planning with fuzzy constraints and fuzzy coefficients
-
Mula J, Poler R, Garcia-Sabater JP (2007). Material Requirement Planning with fuzzy constraints and fuzzy coefficients. Fuzzy Sets Syst. 158: 783-793.
-
(2007)
Fuzzy Sets Syst
, vol.158
, pp. 783-793
-
-
Mula, J.1
Poler, R.2
Garcia-Sabater, J.P.3
-
65
-
-
52049094177
-
Finding and identifying optimal inventory levels for systems with common components
-
doi:10.1016/j.ejor.2007.08.045
-
Nonas SL (2007). Finding and identifying optimal inventory levels for systems with common components. Eur. J. Oper. Res. doi:10.1016/j.ejor.2007.08.045.
-
(2007)
Eur. J. Oper. Res
-
-
Nonas, S.L.1
-
66
-
-
2942631360
-
The MPS parameterization under lead time uncertainty
-
Ould-Louly MA, Dolgui A (2004). The MPS parameterization under lead time uncertainty. Int. J. Prod. Econ. 90: 369-376.
-
(2004)
Int. J. Prod. Econ
, vol.90
, pp. 369-376
-
-
Ould-Louly, M.A.1
Dolgui, A.2
-
67
-
-
34249930610
-
An integrated vendor-buyer inventory model with quality improvement and lead time reduction
-
Ouyang L.-Y, Wu K-S, Ho C-H (2007). An integrated vendor-buyer inventory model with quality improvement and lead time reduction. Int. J. Prod. Econ. 108 (1-2): 349-358.
-
(2007)
Int. J. Prod. Econ
, vol.108
, Issue.1-2
, pp. 349-358
-
-
Ouyang, L.-Y.1
Wu, K.-S.2
Ho, C.-H.3
-
68
-
-
0034286621
-
Impact of investing in quality improvement on (Q,r, L) model involving the imperfect production process
-
Ouyang LY, Chang HC (2000). Impact of investing in quality improvement on (Q,r, L) model involving the imperfect production process. Prod. Plan. Control, 11 (6): 598-607.
-
(2000)
Prod. Plan. Control
, vol.11
, Issue.6
, pp. 598-607
-
-
Ouyang, L.Y.1
Chang, H.C.2
-
69
-
-
0036778937
-
Quality improvement, setup cost and lead-time reductions in lot size reorder point models with an imperfect production process
-
Ouyang LY, Chen CK, Chang HC (2002). Quality improvement, setup cost and lead-time reductions in lot size reorder point models with an imperfect production process. Comput. Oper. Res. 29: 1701-1717.
-
(2002)
Comput. Oper. Res
, vol.29
, pp. 1701-1717
-
-
Ouyang, L.Y.1
Chen, C.K.2
Chang, H.C.3
-
70
-
-
0030170083
-
Mixture inventory model with backorders and lost sales for variable lead time
-
Ouyang LY, Yeh NC, Wu KS (1996). Mixture inventory model with backorders and lost sales for variable lead time. J. Oper. Res. Soc. 47: 829-832.
-
(1996)
J. Oper. Res. Soc
, vol.47
, pp. 829-832
-
-
Ouyang, L.Y.1
Yeh, N.C.2
Wu, K.S.3
-
71
-
-
0022613610
-
Optimal lot sizing, process quality improvement and setup cost reduction
-
Porteus EL (1986). Optimal lot sizing, process quality improvement and setup cost reduction. Oper. Res. 34 (1): 137-144.
-
(1986)
Oper. Res.
, vol.34
, Issue.1
, pp. 137-144
-
-
Porteus, E.L.1
-
72
-
-
18844373618
-
Product platform commonization: Platform construction and platform elements capture
-
Qin H, Zhong Y, Xiao R, Zhang W (2005). Product platform commonization: Platform construction and platform elements capture. Int. J. Adv. Manuf. Technol. 25: 1071-1077.
-
(2005)
Int. J. Adv. Manuf. Technol
, vol.25
, pp. 1071-1077
-
-
Qin, H.1
Zhong, Y.2
Xiao, R.3
Zhang, W.4
-
73
-
-
65549107388
-
Integration of uncertain and imprecise orders in MRPII
-
Conference on Production System Design, Supply Chain Management & Logistics. Miedzyzdroje, Pologne
-
Reynoso G, Grabot B, Geneste L, Ve ́ Rot S (2002). Integration of uncertain and imprecise orders in MRPII. Ninth International Multi-Conference on Advanced Computer Systems, Conference on Production System Design, Supply Chain Management & Logistics. Miedzyzdroje, Pologne.
-
(2002)
Ninth International Multi-conference On Advanced Computer Systems
-
-
Reynoso, G.1
Grabot, B.2
Geneste, L.3
VéRot, S.4
-
74
-
-
0022676316
-
Economic production cycles with imperfect production processes
-
Rosenblatt MJ, Lee HL (1986). Economic production cycles with imperfect production processes. IIE Transactions, 18, 48-55.
-
(1986)
Iie Transactions
, vol.18
, pp. 48-55
-
-
Rosenblatt, M.J.1
Lee, H.L.2
-
75
-
-
0029216440
-
Effects of equipment failure uncertainty in batch production scheduling
-
Sanmartí E, Espuña A, Puigjaner L (1995). Effects of equipment failure uncertainty in batch production scheduling. Computers & Chemical Engineering, 19 (Supplement 1): 565-570.
-
(1995)
Computers & Chemical Engineering
, vol.19
, Issue.SUPPL. 1
, pp. 565-570
-
-
Sanmartí, E.1
Espuña, A.2
Puigjaner, L.3
-
78
-
-
84867954072
-
A Multi-Stage Stochastic Integer Programming Approach for Capacity Expansion under Uncertainty
-
Shabbir A, Alan JK, Gyana P (2003). A Multi-Stage Stochastic Integer Programming Approach for Capacity Expansion under Uncertainty. J. Global Optim. 26 (1): 3-24.
-
(2003)
J. Global Optim
, vol.26
, Issue.1
, pp. 3-24
-
-
Shabbir, A.1
Alan, J.K.2
Gyana, P.3
-
79
-
-
65549159624
-
Applied Systems and Cybernetics
-
Lasker, G.E ed. New York., Academic Press
-
Sommer G (1981). Applied Systems and Cybernetics. Fuzzy inventory scheduling. Lasker, G.E ed. New York., Academic Press.
-
(1981)
Fuzzy Inventory Scheduling
-
-
Sommer, G.1
-
80
-
-
0001827031
-
Time -the next source of competitive advantage
-
July-August
-
Stalk GJ (1988). Time -the next source of competitive advantage, Harvard Business Review (July-August).
-
(1988)
Harvard Business Review
-
-
Stalk, G.J.1
-
81
-
-
0037063281
-
Planning and replanning the master production schedule under demand uncertainty
-
Tang O, Grubbström RW (2002). Planning and replanning the master production schedule under demand uncertainty. Int. J. Prod. Econ. 78 (3): 323-334.
-
(2002)
Int. J. Prod. Econ
, vol.78
, Issue.3
, pp. 323-334
-
-
Tang, O.1
Grubbström, R.W.2
-
82
-
-
0032634574
-
Finding Optimal Material Release Times Using Simulation-Based Optimization
-
Tito HDM, Alexander S, Mark LS (1999). Finding Optimal Material Release Times Using Simulation-Based Optimization. Manage. Sci. 45 (1): 86-102.
-
(1999)
Manage. Sci
, vol.45
, Issue.1
, pp. 86-102
-
-
Tito, H.D.M.1
Alexander, S.2
Mark, L.S.3
-
83
-
-
0038278770
-
An EOQ model with process reliability considerations
-
Tripathy PK, Wee WM, Majhi PR (2003). An EOQ model with process reliability considerations. J. Oper. Res. Soc. 54: 549-554.
-
(2003)
J. Oper. Res. Soc
, vol.54
, pp. 549-554
-
-
Tripathy, P.K.1
Wee, W.M.2
Majhi, P.R.3
-
85
-
-
0030086447
-
Adapting lot-sizing techniques to stochastic demand through production scheduling policy
-
Vargas GA, Metters R (1996). Adapting lot-sizing techniques to stochastic demand through production scheduling policy. IIE Trans. 28 (2): 141-148.
-
(1996)
IIE Trans
, vol.28
, Issue.2
, pp. 141-148
-
-
Vargas, G.A.1
Metters, R.2
-
86
-
-
0003063660
-
The complementary nature of manufacturing goals by their relationship to throughput time: A theory of internal variability of production systems
-
Wacker JG (1987). The complementary nature of manufacturing goals by their relationship to throughput time: a theory of internal variability of production systems. J. Oper. Manage. 7 (2): 91-106.
-
(1987)
J. Oper. Manage
, vol.7
, Issue.2
, pp. 91-106
-
-
Wacker, J.G.1
-
89
-
-
41149171659
-
A meta-modeling paradigm of the manufacturing resources using mathematical logic for process planning
-
Xu HM, Li DB (2008). A meta-modeling paradigm of the manufacturing resources using mathematical logic for process planning. Int. J. Adv. Manuf. Technol. 36: 1022-1031.
-
(2008)
Int. J. Adv. Manuf. Technol
, vol.36
, pp. 1022-1031
-
-
Xu, H.M.1
Li, D.B.2
-
90
-
-
0000301836
-
Demand fulfillment rates in an assemble-to-order system with multiple products and dependent demand
-
Zhang AX (1997). Demand fulfillment rates in an assemble-to-order system with multiple products and dependent demand. Prod. Oper. Manage. 6 (3): 309-324.
-
(1997)
Prod. Oper. Manage
, vol.6
, Issue.3
, pp. 309-324
-
-
Zhang, A.X.1
-
91
-
-
2642532757
-
Analysis of the effect of commonality in multi-level inventory systems applying MRP theory
-
Zhou L, Grubbstrom RW (2004). Analysis of the effect of commonality in multi-level inventory systems applying MRP theory. Int. J. Prod. Econ. 90 (2): 251-263.
-
(2004)
Int. J. Prod. Econ
, vol.90
, Issue.2
, pp. 251-263
-
-
Zhou, L.1
Grubbstrom, R.W.2
|