메뉴 건너뛰기




Volumn 4, Issue 12, 2009, Pages 1505-1517

Impacts of common components on production system in an uncertain environment

Author keywords

Commonality; Uncertainty; WITNESS

Indexed keywords


EID: 72849117850     PISSN: None     EISSN: 19922248     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (8)

References (91)
  • 2
    • 84867954072 scopus 로고    scopus 로고
    • A Multi-Stage Stochastic Integer Programming Approach for Capacity Expansion under Uncertainty
    • Ahmed S, King A, Parija G (2003). A Multi-Stage Stochastic Integer Programming Approach for Capacity Expansion under Uncertainty. J. Global Optim. 26: 3-24.
    • (2003) J. Global Optim , vol.26 , pp. 3-24
    • Ahmed, S.1    King, A.2    Parija, G.3
  • 3
    • 70349195949 scopus 로고    scopus 로고
    • An agent based approach for integrating manufacturing operations
    • doi:10.1016/j.ijpe.2006.10.013
    • Anosike AI, Zhang DZ (2007). An agent based approach for integrating manufacturing operations. Int. J. Prod. Econ. doi:10.1016/j.ijpe.2006.10.013.
    • (2007) Int. J. Prod. Econ
    • Anosike, A.I.1    Zhang, D.Z.2
  • 4
    • 70349195949 scopus 로고    scopus 로고
    • An agent-based approach for integrating manufacturing operations
    • Anosike AI, Zhang DZ (2009). An agent-based approach for integrating manufacturing operations. Int. J. Prod. Econ. 121 (2): 333-352.
    • (2009) Int. J. Prod. Econ , vol.121 , Issue.2 , pp. 333-352
    • Anosike, A.I.1    Zhang, D.Z.2
  • 5
    • 38349016573 scopus 로고    scopus 로고
    • Stability and optimality of a multi-product production and storage system under demand uncertainty
    • Arruda EF, Do Val JBR (2008). Stability and optimality of a multi-product production and storage system under demand uncertainty. Eur. J. Oper. Res. 188 (2); 406-427.
    • (2008) Eur. J. Oper. Res , vol.188 , Issue.2 , pp. 406-427
    • Arruda, E.F.1    Do Val, J.B.R.2
  • 6
    • 0029774985 scopus 로고    scopus 로고
    • Process planning for aluminum tubes: An engineering operations perspective
    • Balakrishnan A, Brown S (1996). Process planning for aluminum tubes: An engineering operations perspective. Operations Res. 44 (1): 7-20.
    • (1996) Operations Res , vol.44 , Issue.1 , pp. 7-20
    • Balakrishnan, A.1    Brown, S.2
  • 7
    • 33750466515 scopus 로고    scopus 로고
    • Multi-period planning and uncertainty issues in cellular manufacturing: A review and future directions
    • Balakrishnan J, Cheng CH (2007). Multi-period planning and uncertainty issues in cellular manufacturing: A review and future directions. Eur. J. Oper. Res. 177 (1): 281-309.
    • (2007) Eur. J. Oper. Res , vol.177 , Issue.1 , pp. 281-309
    • Balakrishnan, J.1    Cheng, C.H.2
  • 8
    • 34548668647 scopus 로고    scopus 로고
    • Integrated inventory and inspection policies for stochastic demand
    • Ben-Daya M, Noman SM (2008). Integrated inventory and inspection policies for stochastic demand. Eur. J. Oper. Res. 185 (1): 159-169.
    • (2008) Eur. J. Oper. Res , vol.185 , Issue.1 , pp. 159-169
    • Ben-Daya, M.1    Noman, S.M.2
  • 9
    • 0028439401 scopus 로고
    • Inventory models involving lead time as a decision variable
    • Ben-Daya M, Raouf A (1994). Inventory models involving lead time as a decision variable. J. Oper. Res. Soc. 45 (5): 579-582.
    • (1994) J. Oper. Res. Soc , vol.45 , Issue.5 , pp. 579-582
    • Ben-Daya, M.1    Raouf, A.2
  • 10
    • 84985855354 scopus 로고
    • Vendor performance and alternative manufacturing environments
    • Benton WC, Krajewski LJ (1990). Vendor performance and alternative manufacturing environments. Decision Sci. 21 (2): 403-415.
    • (1990) Decision Sci , vol.21 , Issue.2 , pp. 403-415
    • Benton, W.C.1    Krajewski, L.J.2
  • 11
    • 0020832935 scopus 로고
    • Mathematical programming approaches to capacity-constrained MRP systems: Review formulation and problem reduction
    • Billington PJ, Mcclain JO, Thomas LJ (1983). Mathematical programming approaches to capacity-constrained MRP systems: Review formulation and problem reduction. Manage Sci. 29 (10): 1126-1141.
    • (1983) Manage Sci , vol.29 , Issue.10 , pp. 1126-1141
    • Billington, P.J.1    McClain, J.O.2    Thomas, L.J.3
  • 13
    • 0001267220 scopus 로고
    • The strategic use of capacity slack in the economic lot scheduling problem with random demand
    • Bourland KE, Yano CA (1994). The strategic use of capacity slack in the economic lot scheduling problem with random demand. Manage. Sci. 40 (12): 1690-1704.
    • (1994) Manage. Sci , vol.40 , Issue.12 , pp. 1690-1704
    • Bourland, K.E.1    Yano, C.A.2
  • 14
    • 0027624544 scopus 로고
    • A structured analysis of material requirements planning systems under combined demand and supply uncertainty
    • Brennan L, Gupta SM (1993). A structured analysis of material requirements planning systems under combined demand and supply uncertainty. Int. J. Prod. Res. 31 (7): 1689-1707.
    • (1993) Int. J. Prod. Res , vol.31 , Issue.7 , pp. 1689-1707
    • Brennan, L.1    Gupta, S.M.2
  • 15
    • 59649096759 scopus 로고    scopus 로고
    • Production decisions under joint price and production uncertainty
    • Dalal AJ, Alghalith M (2009) Production decisions under joint price and production uncertainty. Eur. J. Oper. Res. 197 (1): 84-92.
    • (2009) Eur. J. Oper. Res , vol.197 , Issue.1 , pp. 84-92
    • Dalal, A.J.1    Alghalith, M.2
  • 16
    • 0037151234 scopus 로고    scopus 로고
    • A model for supply planning under lead time uncertainty
    • Dolgui A, Ould-Louly MA (2002). A model for supply planning under lead time uncertainty. Int. J. Prod. Econ. 78: 145-152.
    • (2002) Int. J. Prod. Econ , vol.78 , pp. 145-152
    • Dolgui, A.1    Ould-Louly, M.A.2
  • 17
    • 0034250264 scopus 로고    scopus 로고
    • Methodology for managing the effect of uncertainty in simulation based design
    • Du X, Chen W (2000). Methodology for managing the effect of uncertainty in simulation based design. AIAA J. 38 (8): 1471-1478.
    • (2000) Aiaa J , vol.38 , Issue.8 , pp. 1471-1478
    • Du, X.1    Chen, W.2
  • 18
    • 0035866458 scopus 로고    scopus 로고
    • MRP performance effects due to lot size and planned lead-time settings
    • Enns ST (2001). MRP performance effects due to lot size and planned lead-time settings. Int. J. Prod. Res. 39 (3): 461-480.
    • (2001) Int. J. Prod. Res , vol.39 , Issue.3 , pp. 461-480
    • Enns, S.T.1
  • 19
    • 0005461851 scopus 로고
    • MRP modelling via scenarios
    • In: Ciriani TA, Leachman RC (Eds.). John Wiley and Sons
    • Escudero LF, Kamesam PV (1993). MRP modelling via scenarios. In: Ciriani TA, Leachman RC (Eds.) Optimization in Industry. John Wiley and Sons.
    • (1993) Optimization In Industry
    • Escudero, L.F.1    Kamesam, P.V.2
  • 20
    • 0344704224 scopus 로고    scopus 로고
    • Product platform design to improve commonality in custom products
    • Farrell RS, Simpson TW (2003). Product platform design to improve commonality in custom products. J. Intell. Manuf. 14 (6): 541-556.
    • (2003) J. Intell. Manuf , vol.14 , Issue.6 , pp. 541-556
    • Farrell, R.S.1    Simpson, T.W.2
  • 21
    • 14344263054 scopus 로고    scopus 로고
    • Self-configuring components approach to product variant development. Artificial Intelligence for Engineering Design, Anal
    • Germani M, Mandorli F (2004). Self-configuring components approach to product variant development. Artificial Intelligence for Engineering Design, Anal. Manuf. 18: 41-54.
    • (2004) Manuf , vol.18 , pp. 41-54
    • Germani, M.1    Mandorli, F.2
  • 23
    • 0032627275 scopus 로고    scopus 로고
    • A net present value to approach to safety stocks in a multi-level MRP system
    • Grubbstrom RW (1999). A net present value to approach to safety stocks in a multi-level MRP system. Int. J. Prod. Econ. 59 (1-3): 361-375.
    • (1999) Int. J. Prod. Econ , vol.59 , Issue.1-3 , pp. 361-375
    • Grubbstrom, R.W.1
  • 24
    • 0345072526 scopus 로고    scopus 로고
    • Analysis of an inventory system under supply uncertainty
    • Güllü R, Önol E, Erkip N (1999). Analysis of an inventory system under supply uncertainty. Int. J. Prod. Econ. 59 (1-3), 377-385.
    • (1999) Int. J. Prod. Econ , vol.59 , Issue.1-3 , pp. 377-385
    • Güllü, R.1    Önol, E.2    Erkip, N.3
  • 25
    • 0034175277 scopus 로고    scopus 로고
    • A review of techniques for buffering against uncertainty with MRP systems
    • Guide VDR, Srivastava R (2000). A review of techniques for buffering against uncertainty with MRP systems. Prod. Plan. Control, 11 (3): 223-233.
    • (2000) Prod. Plan. Control , vol.11 , Issue.3 , pp. 223-233
    • Guide, V.D.R.1    Srivastava, R.2
  • 26
    • 0033079082 scopus 로고    scopus 로고
    • Some stochastic inventory models with deterministic variable lead time
    • Hariga M, Ben-Daya M (1999). Some stochastic inventory models with deterministic variable lead time. Eur. J. Oper. Res. 113, 42-51.
    • (1999) Eur. J. Oper. Res , vol.113 , pp. 42-51
    • Hariga, M.1    Ben-Daya, M.2
  • 27
    • 33646384940 scopus 로고    scopus 로고
    • Product line design with component commonality and cost-reduction effort
    • Heese HS, Swaminathan JM (2006). Product line design with component commonality and cost-reduction effort. Manuf. Serv. Oper. Manage. 8 (2): 206-219.
    • (2006) Manuf. Serv. Oper. Manage , vol.8 , Issue.2 , pp. 206-219
    • Heese, H.S.1    Swaminathan, J.M.2
  • 28
    • 0037120624 scopus 로고    scopus 로고
    • The costs and benefits of commonality in assemble-to-order systems with a (Q, r)-policy for component replenishment
    • Hillier MS (2002). The costs and benefits of commonality in assemble-to-order systems with a (Q, r)-policy for component replenishment. Eur. J. Oper. Res. 141 (3), 570-586.
    • (2002) Eur. J. Oper. Res , vol.141 , Issue.3 , pp. 570-586
    • Hillier, M.S.1
  • 29
    • 0029734543 scopus 로고    scopus 로고
    • An investigation of alternative dampening procedures to cope with MRP system nervousness
    • Ho CJ, Carter PL (1996). An investigation of alternative dampening procedures to cope with MRP system nervousness. Int. J. Prod. Res. 34 (1), 137-156.
    • (1996) Int. J. Prod. Res , vol.34 , Issue.1 , pp. 137-156
    • Ho, C.J.1    Carter, P.L.2
  • 30
    • 70449383987 scopus 로고
    • Uncertainty dampening methods for reducing MRP system nervousness
    • Ho CJ, Law WK, Rampal R (1995). Uncertainty dampening methods for reducing MRP system nervousness. Int. J. Prod. Res. 33 (2): 483-496.
    • (1995) Int. J. Prod. Res , vol.33 , Issue.2 , pp. 483-496
    • Ho, C.J.1    Law, W.K.2    Rampal, R.3
  • 31
    • 0029344857 scopus 로고
    • Joint investment in quality improvement and setup reduction
    • Hong JD, Hayya JC (1995). Joint investment in quality improvement and setup reduction. Comput. Oper. Res. 22: 567-574.
    • (1995) Comput. Oper. Res , vol.22 , pp. 567-574
    • Hong, J.D.1    Hayya, J.C.2
  • 32
    • 0035314299 scopus 로고    scopus 로고
    • Possibilistic programming in production planning of assemble-to-order environments
    • Hsu H, Wang W (2001). Possibilistic programming in production planning of assemble-to-order environments. Fuzzy Sets and Syst. 119 (1): 59-70.
    • (2001) Fuzzy Sets and Syst , vol.119 , Issue.1 , pp. 59-70
    • Hsu, H.1    Wang, W.2
  • 33
    • 0020203987 scopus 로고
    • Analysis of material and capacity requirements with Q-GERT
    • Huang PY, Clayton ER, Moore LJ (1982). Analysis of material and capacity requirements with Q-GERT. Int. J. Prod. Res. 20 (6): 701-713.
    • (1982) Int. J. Prod. Res , vol.20 , Issue.6 , pp. 701-713
    • Huang, P.Y.1    Clayton, E.R.2    Moore, L.J.3
  • 34
    • 0022161887 scopus 로고
    • Integrating the MRP-based control level and the multistage shop level of a manufacturing system via network simulation
    • Huang PY, Rees LP, Taylor BW (1985). Integrating the MRP-based control level and the multistage shop level of a manufacturing system via network simulation. Int. J. Prod. Res. 23 (6): 1217-1231.
    • (1985) Int. J. Prod. Res , vol.23 , Issue.6 , pp. 1217-1231
    • Huang, P.Y.1    Rees, L.P.2    Taylor, B.W.3
  • 35
    • 0027560761 scopus 로고
    • Multiproduct economic lot size models with investments costs for setup reduction and quality improvement
    • Hwang H, Kim DB, Kim YD (1993). Multiproduct economic lot size models with investments costs for setup reduction and quality improvement. Int. J. Prod. Res. 31: 691-703.
    • (1993) Int. J. Prod. Res , vol.31 , pp. 691-703
    • Hwang, H.1    Kim, D.B.2    Kim, Y.D.3
  • 36
    • 35348946887 scopus 로고    scopus 로고
    • Analysis of an industrial component commonality problem
    • Jans R, Degraeve Z, Schepens L (2008). Analysis of an industrial component commonality problem. Eur. J. Oper. Res. 186 (2): 801-811.
    • (2008) Eur. J. Oper. Res , vol.186 , Issue.2 , pp. 801-811
    • Jans, R.1    Degraeve, Z.2    Schepens, L.3
  • 37
    • 0040810819 scopus 로고    scopus 로고
    • Understanding Product Family for Mass Customization by Developing Commonality Indices
    • Jiao J, Tseng MM (2000). Understanding Product Family for Mass Customization by Developing Commonality Indices. J. Eng. Design, 11 (3): 225-243.
    • (2000) J. Eng. Design , vol.11 , Issue.3 , pp. 225-243
    • Jiao, J.1    Tseng, M.M.2
  • 38
    • 0032643783 scopus 로고    scopus 로고
    • A methodology of developing product family architecture for mass customization
    • Jiao RJ, Tseng MM (1999). A methodology of developing product family architecture for mass customization. J. Intel. Manuf. 10: 3-20.
    • (1999) J. Intel. Manuf , vol.10 , pp. 3-20
    • Jiao, R.J.1    Tseng, M.M.2
  • 39
    • 0034467625 scopus 로고    scopus 로고
    • Generic bill-of-material-and-operations for high-variety production management
    • Jiao RJ, Tseng MM, Ma S, Zhou Y (2000). Generic bill-of-material-and-operations for high-variety production management. Concurrent Engineering: Res. Appl. 8 (4): 297-321.
    • (2000) Concurrent Engineering: Res. Appl , vol.8 , Issue.4 , pp. 297-321
    • Jiao, R.J.1    Tseng, M.M.2    Ma, S.3    Zhou, Y.4
  • 40
    • 0032366810 scopus 로고    scopus 로고
    • The Value of Using Scheduling Information in Planning Material Requirements*
    • John JK, Sridharan V (1998). The Value of Using Scheduling Information in Planning Material Requirements*. Decision Sci. 29 (2): 479-496.
    • (1998) Decision Sci , vol.29 , Issue.2 , pp. 479-496
    • John, J.K.1    Sridharan, V.2
  • 42
    • 38249032550 scopus 로고
    • Impact of investing in quality improvement on the lot size model. OMEGA
    • Keller G, Noori H (1988). Impact of investing in quality improvement on the lot size model. OMEGA Int. J. Manage. Sci. 15: 595-601.
    • (1988) Int. J. Manage. Sci , vol.15 , pp. 595-601
    • Keller, G.1    Noori, H.2
  • 43
    • 0032320279 scopus 로고    scopus 로고
    • Manufacturing lot-sizing under MRP II environment: An improved analytical model & a heuristic procedure
    • Kim HJ, Hosni YA (1998). Manufacturing lot-sizing under MRP II environment: An improved analytical model & a heuristic procedure. Comput. Ind. Eng. 35 (3-4): 423-426.
    • (1998) Comput. Ind. Eng , vol.35 , Issue.3-4 , pp. 423-426
    • Kim, H.J.1    Hosni, Y.A.2
  • 44
    • 17444379378 scopus 로고    scopus 로고
    • Integrated quality and quantity modeling of a production line
    • Kim J, Gershwin SB (2005). Integrated quality and quantity modeling of a production line. OR Spectrum, 27 (2-3): 287-314.
    • (2005) Or Spectrum , vol.27 , Issue.2-3 , pp. 287-314
    • Kim, J.1    Gershwin, S.B.2
  • 45
    • 0031069689 scopus 로고    scopus 로고
    • A stochastic linear programming approach to hierarchical production planning
    • Kira D, Kusy M, Rakita I (1997). A stochastic linear programming approach to hierarchical production planning. J. Oper. Res. Soc. 48: 207-211.
    • (1997) J. Oper. Res. Soc , vol.48 , pp. 207-211
    • Kira, D.1    Kusy, M.2    Rakita, I.3
  • 46
    • 33645806554 scopus 로고    scopus 로고
    • A knowledge management approach for managing uncertainty in manufacturing
    • Koh SCL, Gunasekaran A (2006). A knowledge management approach for managing uncertainty in manufacturing. Ind. Manage. Data Syst. 106 (4): 439-459.
    • (2006) Ind. Manage. Data Syst , vol.106 , Issue.4 , pp. 439-459
    • Koh, S.C.L.1    Gunasekaran, A.2
  • 47
    • 0037323569 scopus 로고    scopus 로고
    • MRP-controlled manufacturing environment disturbed by uncertainty
    • Koh SCL, Saad SM (2003). MRP-controlled manufacturing environment disturbed by uncertainty. Robotics and Computer-Integrated Manufacturing 19 (1-2): 157-171.
    • (2003) Robotics and Computer-integrated Manufacturing , vol.19 , Issue.1-2 , pp. 157-171
    • Koh, S.C.L.1    Saad, S.M.2
  • 48
    • 0037054916 scopus 로고    scopus 로고
    • Uncertainty under MRP-planned manufacture: Review and categorisation
    • Koh SCL, Saad SM, Jones MH (2002). Uncertainty under MRP-planned manufacture: Review and categorisation. Int. J. Prod. Res. 40 (10): 2399-2421.
    • (2002) Int. J. Prod. Res , vol.40 , Issue.10 , pp. 2399-2421
    • Koh, S.C.L.1    Saad, S.M.2    Jones, M.H.3
  • 49
    • 27544508424 scopus 로고    scopus 로고
    • A combinatorial manufacturing resource planning model for long-term CNC machining industry
    • Lan CH, Lan TS (2005). A combinatorial manufacturing resource planning model for long-term CNC machining industry. Int. J. Adv. Manuf. Technol. 26: 1157-1162.
    • (2005) Int. J. Adv. Manuf. Technol , vol.26 , pp. 1157-1162
    • Lan, C.H.1    Lan, T.S.2
  • 50
    • 0031377329 scopus 로고    scopus 로고
    • Simulation of Manufacturing Systems
    • In: Andradóttir S, Healy KJ, Withers DH, Nelson BL (Eds.), Renaissance Waverly Hotel, Atlanta, GA
    • Law AM, Mccomas MG (1997). Simulation of Manufacturing Systems. In: Andradóttir S, Healy KJ, Withers DH, Nelson BL (Eds.) Winter Simulation Conference. Renaissance Waverly Hotel, Atlanta, GA.
    • (1997) Winter Simulation Conference
    • Law, A.M.1    McComas, M.G.2
  • 51
    • 33847296636 scopus 로고    scopus 로고
    • A robust optimization model for multi-site production planning problem in an uncertain environment
    • Leung SCH, Tsang SOS, Ng WL, Wu Y (2007). A robust optimization model for multi-site production planning problem in an uncertain environment. Eur. J. Oper. Res. 181: 224-238.
    • (2007) Eur. J. Oper. Res , vol.181 , pp. 224-238
    • Leung, S.C.H.1    Tsang, S.O.S.2    Ng, W.L.3    Wu, Y.4
  • 52
    • 0002505095 scopus 로고
    • An analytical determination of lead time with normal demand
    • Liao CJ, Shyu CH (1991). An analytical determination of lead time with normal demand. Int. J. Oper. Prod. Manage. 11: 72-78.
    • (1991) Int. J. Oper. Prod. Manage , vol.11 , pp. 72-78
    • Liao, C.J.1    Shyu, C.H.2
  • 54
    • 0036833069 scopus 로고    scopus 로고
    • Commonality and postponement in multistage assembly systems
    • Ma SH, Wang W, Liu LM (2002). Commonality and postponement in multistage assembly systems. Eur. J. Oper. Res. 142 (3): 523-538.
    • (2002) Eur. J. Oper. Res , vol.142 , Issue.3 , pp. 523-538
    • Ma, S.H.1    Wang, W.2    Liu, L.M.3
  • 55
    • 0001900362 scopus 로고
    • Comparison between simple infinite loading and loading considering a workload status under uncertainty in job operation times
    • Matsuura H, Tsubone H, Kataoka K (1995). Comparison between simple infinite loading and loading considering a workload status under uncertainty in job operation times. Int. J. Prod. Econ. 40 (1): 45-55.
    • (1995) Int. J. Prod. Econ , vol.40 , Issue.1 , pp. 45-55
    • Matsuura, H.1    Tsubone, H.2    Kataoka, K.3
  • 56
    • 0035924657 scopus 로고    scopus 로고
    • Improving manufacturing costs and lead times with quality-oriented operating curves
    • Mayer M, Nusswald M (2001). Improving manufacturing costs and lead times with quality-oriented operating curves. J. Mater. Process Technol. 119 (1-3): 83-89.
    • (2001) J. Mater. Process Technol , vol.119 , Issue.1-3 , pp. 83-89
    • Mayer, M.1    Nusswald, M.2
  • 57
    • 0031553259 scopus 로고    scopus 로고
    • Fuzzy production planning model for fresh tomato packing
    • Miller WA, Leung LC, Azhar TM, Sargent S (1997). Fuzzy production planning model for fresh tomato packing. Int. J. Prod. Econ. 53 (3-4): 227-238.
    • (1997) Int. J. Prod. Econ , vol.53 , Issue.3-4 , pp. 227-238
    • Miller, W.A.1    Leung, L.C.2    Azhar, T.M.3    Sargent, S.4
  • 58
    • 0025206966 scopus 로고
    • Interaction effects on MRP nervousness
    • Minifie JR, Davis RA (1990). Interaction effects on MRP nervousness. Int. J. Prod. Res. 28 (1): 173-183.
    • (1990) Int. J. Prod. Res , vol.28 , Issue.1 , pp. 173-183
    • Minifie, J.R.1    Davis, R.A.2
  • 59
    • 11244335426 scopus 로고    scopus 로고
    • Component commonality: Models with product-specific service constraints
    • Mirchandani P, Mishra AK (2002). Component commonality: models with product-specific service constraints. Prod. Oper. Manage, 11 (2): 199-215.
    • (2002) Prod. Oper. Manage , vol.11 , Issue.2 , pp. 199-215
    • Mirchandani, P.1    Mishra, A.K.2
  • 60
    • 20344396080 scopus 로고    scopus 로고
    • The impact of component commonality in an assemble-to-order environment under supply and demand uncertainty
    • Mohebbi E, Choobineh F (2005). The impact of component commonality in an assemble-to-order environment under supply and demand uncertainty. Omega, Int. J. Manage. Sci. 33: 472-482.
    • (2005) Omega, Int. J. Manage. Sci , vol.33 , pp. 472-482
    • Mohebbi, E.1    Choobineh, F.2
  • 61
    • 0032210280 scopus 로고    scopus 로고
    • A note on lead time and distributional assumptions in continuous review inventory models
    • Moon I, Choi S (1998). A note on lead time and distributional assumptions in continuous review inventory models. Comp. Oper. Res. 25: 1007-1012.
    • (1998) Comp. Oper. Res , vol.25 , pp. 1007-1012
    • Moon, I.1    Choi, S.2
  • 62
    • 67649410319 scopus 로고    scopus 로고
    • Joint procurement and production decisions in remanufacturing under quality and demand uncertainty
    • Mukhopadhyay SK, Ma H (2009). Joint procurement and production decisions in remanufacturing under quality and demand uncertainty. Int. J. Prod. Econ. 120 (1): 5-17.
    • (2009) Int. J. Prod. Econ , vol.120 , Issue.1 , pp. 5-17
    • Mukhopadhyay, S.K.1    Ma, H.2
  • 63
    • 27344448554 scopus 로고    scopus 로고
    • MRP with flexible constraints: A fuzzy mathematical programming approach
    • Mula J, Poler R, Garcia JP (2006). MRP with flexible constraints: A fuzzy mathematical programming approach. Fuzzy Sets Syst. 157: 74-97.
    • (2006) Fuzzy Sets Syst , vol.157 , pp. 74-97
    • Mula, J.1    Poler, R.2    Garcia, J.P.3
  • 64
    • 33846833792 scopus 로고    scopus 로고
    • Material Requirement Planning with fuzzy constraints and fuzzy coefficients
    • Mula J, Poler R, Garcia-Sabater JP (2007). Material Requirement Planning with fuzzy constraints and fuzzy coefficients. Fuzzy Sets Syst. 158: 783-793.
    • (2007) Fuzzy Sets Syst , vol.158 , pp. 783-793
    • Mula, J.1    Poler, R.2    Garcia-Sabater, J.P.3
  • 65
    • 52049094177 scopus 로고    scopus 로고
    • Finding and identifying optimal inventory levels for systems with common components
    • doi:10.1016/j.ejor.2007.08.045
    • Nonas SL (2007). Finding and identifying optimal inventory levels for systems with common components. Eur. J. Oper. Res. doi:10.1016/j.ejor.2007.08.045.
    • (2007) Eur. J. Oper. Res
    • Nonas, S.L.1
  • 66
    • 2942631360 scopus 로고    scopus 로고
    • The MPS parameterization under lead time uncertainty
    • Ould-Louly MA, Dolgui A (2004). The MPS parameterization under lead time uncertainty. Int. J. Prod. Econ. 90: 369-376.
    • (2004) Int. J. Prod. Econ , vol.90 , pp. 369-376
    • Ould-Louly, M.A.1    Dolgui, A.2
  • 67
    • 34249930610 scopus 로고    scopus 로고
    • An integrated vendor-buyer inventory model with quality improvement and lead time reduction
    • Ouyang L.-Y, Wu K-S, Ho C-H (2007). An integrated vendor-buyer inventory model with quality improvement and lead time reduction. Int. J. Prod. Econ. 108 (1-2): 349-358.
    • (2007) Int. J. Prod. Econ , vol.108 , Issue.1-2 , pp. 349-358
    • Ouyang, L.-Y.1    Wu, K.-S.2    Ho, C.-H.3
  • 68
    • 0034286621 scopus 로고    scopus 로고
    • Impact of investing in quality improvement on (Q,r, L) model involving the imperfect production process
    • Ouyang LY, Chang HC (2000). Impact of investing in quality improvement on (Q,r, L) model involving the imperfect production process. Prod. Plan. Control, 11 (6): 598-607.
    • (2000) Prod. Plan. Control , vol.11 , Issue.6 , pp. 598-607
    • Ouyang, L.Y.1    Chang, H.C.2
  • 69
    • 0036778937 scopus 로고    scopus 로고
    • Quality improvement, setup cost and lead-time reductions in lot size reorder point models with an imperfect production process
    • Ouyang LY, Chen CK, Chang HC (2002). Quality improvement, setup cost and lead-time reductions in lot size reorder point models with an imperfect production process. Comput. Oper. Res. 29: 1701-1717.
    • (2002) Comput. Oper. Res , vol.29 , pp. 1701-1717
    • Ouyang, L.Y.1    Chen, C.K.2    Chang, H.C.3
  • 70
    • 0030170083 scopus 로고    scopus 로고
    • Mixture inventory model with backorders and lost sales for variable lead time
    • Ouyang LY, Yeh NC, Wu KS (1996). Mixture inventory model with backorders and lost sales for variable lead time. J. Oper. Res. Soc. 47: 829-832.
    • (1996) J. Oper. Res. Soc , vol.47 , pp. 829-832
    • Ouyang, L.Y.1    Yeh, N.C.2    Wu, K.S.3
  • 71
    • 0022613610 scopus 로고
    • Optimal lot sizing, process quality improvement and setup cost reduction
    • Porteus EL (1986). Optimal lot sizing, process quality improvement and setup cost reduction. Oper. Res. 34 (1): 137-144.
    • (1986) Oper. Res. , vol.34 , Issue.1 , pp. 137-144
    • Porteus, E.L.1
  • 72
    • 18844373618 scopus 로고    scopus 로고
    • Product platform commonization: Platform construction and platform elements capture
    • Qin H, Zhong Y, Xiao R, Zhang W (2005). Product platform commonization: Platform construction and platform elements capture. Int. J. Adv. Manuf. Technol. 25: 1071-1077.
    • (2005) Int. J. Adv. Manuf. Technol , vol.25 , pp. 1071-1077
    • Qin, H.1    Zhong, Y.2    Xiao, R.3    Zhang, W.4
  • 73
    • 65549107388 scopus 로고    scopus 로고
    • Integration of uncertain and imprecise orders in MRPII
    • Conference on Production System Design, Supply Chain Management & Logistics. Miedzyzdroje, Pologne
    • Reynoso G, Grabot B, Geneste L, Ve ́ Rot S (2002). Integration of uncertain and imprecise orders in MRPII. Ninth International Multi-Conference on Advanced Computer Systems, Conference on Production System Design, Supply Chain Management & Logistics. Miedzyzdroje, Pologne.
    • (2002) Ninth International Multi-conference On Advanced Computer Systems
    • Reynoso, G.1    Grabot, B.2    Geneste, L.3    VéRot, S.4
  • 74
    • 0022676316 scopus 로고
    • Economic production cycles with imperfect production processes
    • Rosenblatt MJ, Lee HL (1986). Economic production cycles with imperfect production processes. IIE Transactions, 18, 48-55.
    • (1986) Iie Transactions , vol.18 , pp. 48-55
    • Rosenblatt, M.J.1    Lee, H.L.2
  • 75
    • 0029216440 scopus 로고
    • Effects of equipment failure uncertainty in batch production scheduling
    • Sanmartí E, Espuña A, Puigjaner L (1995). Effects of equipment failure uncertainty in batch production scheduling. Computers & Chemical Engineering, 19 (Supplement 1): 565-570.
    • (1995) Computers & Chemical Engineering , vol.19 , Issue.SUPPL. 1 , pp. 565-570
    • Sanmartí, E.1    Espuña, A.2    Puigjaner, L.3
  • 78
    • 84867954072 scopus 로고    scopus 로고
    • A Multi-Stage Stochastic Integer Programming Approach for Capacity Expansion under Uncertainty
    • Shabbir A, Alan JK, Gyana P (2003). A Multi-Stage Stochastic Integer Programming Approach for Capacity Expansion under Uncertainty. J. Global Optim. 26 (1): 3-24.
    • (2003) J. Global Optim , vol.26 , Issue.1 , pp. 3-24
    • Shabbir, A.1    Alan, J.K.2    Gyana, P.3
  • 79
    • 65549159624 scopus 로고
    • Applied Systems and Cybernetics
    • Lasker, G.E ed. New York., Academic Press
    • Sommer G (1981). Applied Systems and Cybernetics. Fuzzy inventory scheduling. Lasker, G.E ed. New York., Academic Press.
    • (1981) Fuzzy Inventory Scheduling
    • Sommer, G.1
  • 80
    • 0001827031 scopus 로고
    • Time -the next source of competitive advantage
    • July-August
    • Stalk GJ (1988). Time -the next source of competitive advantage, Harvard Business Review (July-August).
    • (1988) Harvard Business Review
    • Stalk, G.J.1
  • 81
    • 0037063281 scopus 로고    scopus 로고
    • Planning and replanning the master production schedule under demand uncertainty
    • Tang O, Grubbström RW (2002). Planning and replanning the master production schedule under demand uncertainty. Int. J. Prod. Econ. 78 (3): 323-334.
    • (2002) Int. J. Prod. Econ , vol.78 , Issue.3 , pp. 323-334
    • Tang, O.1    Grubbström, R.W.2
  • 82
    • 0032634574 scopus 로고    scopus 로고
    • Finding Optimal Material Release Times Using Simulation-Based Optimization
    • Tito HDM, Alexander S, Mark LS (1999). Finding Optimal Material Release Times Using Simulation-Based Optimization. Manage. Sci. 45 (1): 86-102.
    • (1999) Manage. Sci , vol.45 , Issue.1 , pp. 86-102
    • Tito, H.D.M.1    Alexander, S.2    Mark, L.S.3
  • 83
    • 0038278770 scopus 로고    scopus 로고
    • An EOQ model with process reliability considerations
    • Tripathy PK, Wee WM, Majhi PR (2003). An EOQ model with process reliability considerations. J. Oper. Res. Soc. 54: 549-554.
    • (2003) J. Oper. Res. Soc , vol.54 , pp. 549-554
    • Tripathy, P.K.1    Wee, W.M.2    Majhi, P.R.3
  • 85
    • 0030086447 scopus 로고    scopus 로고
    • Adapting lot-sizing techniques to stochastic demand through production scheduling policy
    • Vargas GA, Metters R (1996). Adapting lot-sizing techniques to stochastic demand through production scheduling policy. IIE Trans. 28 (2): 141-148.
    • (1996) IIE Trans , vol.28 , Issue.2 , pp. 141-148
    • Vargas, G.A.1    Metters, R.2
  • 86
    • 0003063660 scopus 로고
    • The complementary nature of manufacturing goals by their relationship to throughput time: A theory of internal variability of production systems
    • Wacker JG (1987). The complementary nature of manufacturing goals by their relationship to throughput time: a theory of internal variability of production systems. J. Oper. Manage. 7 (2): 91-106.
    • (1987) J. Oper. Manage , vol.7 , Issue.2 , pp. 91-106
    • Wacker, J.G.1
  • 89
    • 41149171659 scopus 로고    scopus 로고
    • A meta-modeling paradigm of the manufacturing resources using mathematical logic for process planning
    • Xu HM, Li DB (2008). A meta-modeling paradigm of the manufacturing resources using mathematical logic for process planning. Int. J. Adv. Manuf. Technol. 36: 1022-1031.
    • (2008) Int. J. Adv. Manuf. Technol , vol.36 , pp. 1022-1031
    • Xu, H.M.1    Li, D.B.2
  • 90
    • 0000301836 scopus 로고    scopus 로고
    • Demand fulfillment rates in an assemble-to-order system with multiple products and dependent demand
    • Zhang AX (1997). Demand fulfillment rates in an assemble-to-order system with multiple products and dependent demand. Prod. Oper. Manage. 6 (3): 309-324.
    • (1997) Prod. Oper. Manage , vol.6 , Issue.3 , pp. 309-324
    • Zhang, A.X.1
  • 91
    • 2642532757 scopus 로고    scopus 로고
    • Analysis of the effect of commonality in multi-level inventory systems applying MRP theory
    • Zhou L, Grubbstrom RW (2004). Analysis of the effect of commonality in multi-level inventory systems applying MRP theory. Int. J. Prod. Econ. 90 (2): 251-263.
    • (2004) Int. J. Prod. Econ , vol.90 , Issue.2 , pp. 251-263
    • Zhou, L.1    Grubbstrom, R.W.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.