메뉴 건너뛰기




Volumn 29, Issue 2, 1998, Pages 479-496

The value of using scheduling information in planning material requirements

Author keywords

Heuristics; Job shop scheduling; Material requirements planning; Order release; Production and inventory control systems; Queuing theory, and simulation

Indexed keywords


EID: 0032366810     PISSN: 00117315     EISSN: None     Source Type: Journal    
DOI: 10.1111/j.1540-5915.1998.tb01585.x     Document Type: Article
Times cited : (21)

References (9)
  • 1
    • 0004282654 scopus 로고
    • (Publication No. 73(9)). Washington, DC: Department of Commerce
    • Bureau of Economic Research. (1993). Survey of current business (Publication No. 73(9)). Washington, DC: Department of Commerce.
    • (1993) Survey of Current Business
  • 3
    • 0000131281 scopus 로고
    • Algorithms for solving production scheduling problems
    • Giffler, B., & Thompson, G. L. (1960). Algorithms for solving production scheduling problems. Operations Research, 8(4), 487-503.
    • (1960) Operations Research , vol.8 , Issue.4 , pp. 487-503
    • Giffler, B.1    Thompson, G.L.2
  • 4
    • 0039224557 scopus 로고
    • Unpublished doctoral dissertation, The Pennsylvania State University, University Park, PA
    • Kanet, J. J. (1979). Job shop scheduling to meet due dates: A simulation study. Unpublished doctoral dissertation, The Pennsylvania State University, University Park, PA.
    • (1979) Job Shop Scheduling to Meet Due Dates: A Simulation Study
    • Kanet, J.J.1
  • 6
    • 0025488846 scopus 로고
    • The electronic leitstand: A new tool for shop scheduling
    • Kanet, J. J., & Sridharan, V. (1990). The electronic leitstand: A new tool for shop scheduling. Manufacturing Review, 3(3), 161-170.
    • (1990) Manufacturing Review , vol.3 , Issue.3 , pp. 161-170
    • Kanet, J.J.1    Sridharan, V.2
  • 7
    • 0023310940 scopus 로고
    • Lot sizes, lead times, and in-process inventories
    • Karmarkar, U. S. (1987). Lot sizes, lead times, and in-process inventories. Management Science, 33(4), 409-418.
    • (1987) Management Science , vol.33 , Issue.4 , pp. 409-418
    • Karmarkar, U.S.1
  • 8
    • 0030262170 scopus 로고    scopus 로고
    • A decision theory based scheduling procedure for single-machine weighted earliness and tardiness problems
    • Sridharan, V., & Zhou, Z. (1996). A decision theory based scheduling procedure for single-machine weighted earliness and tardiness problems. European Journal of Operational Research, 94, 292-301.
    • (1996) European Journal of Operational Research , vol.94 , pp. 292-301
    • Sridharan, V.1    Zhou, Z.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.