-
1
-
-
0023977010
-
The shifting bottleneck procedure for job shop scheduling
-
Adams, J., E. Balas, and D. Zawack. "The Shifting Bottleneck Procedure for Job Shop Scheduling." Management Science 34, no. 3 (1988): 391-401.
-
(1988)
Management Science
, vol.34
, Issue.3
, pp. 391-401
-
-
Adams, J.1
Balas, E.2
Zawack, D.3
-
3
-
-
0028403388
-
A simulation comparison of traditional, JIT and TOC manufacturing systems in a flow shop with bottlenecks
-
Cook, D.P. "A Simulation Comparison of Traditional, JIT and TOC Manufacturing Systems in a Flow Shop with Bottlenecks." Production and Inventory Management Journal 35, no. 1 (1994): 73-78.
-
(1994)
Production and Inventory Management Journal
, vol.35
, Issue.1
, pp. 73-78
-
-
Cook, D.P.1
-
4
-
-
0023544082
-
A procedure for implementing input/output control: A case study
-
Fry, T.D., and A.E. Smith. "A Procedure for Implementing Input/Output Control: A Case Study." Production and Inventory Management Journal 28, no. 4 (1987): 50-52.
-
(1987)
Production and Inventory Management Journal
, vol.28
, Issue.4
, pp. 50-52
-
-
Fry, T.D.1
Smith, A.E.2
-
5
-
-
0029544601
-
Automated scheduling by families. Part ii: Job shop and flow shop scheduling
-
Galvin, T.M. "Automated Scheduling by Families. Part II: Job Shop and Flow Shop Scheduling." Production and Inventory Management Journal 36, no. 4 (1995): 38-45.
-
(1995)
Production and Inventory Management Journal
, vol.36
, Issue.4
, pp. 38-45
-
-
Galvin, T.M.1
-
6
-
-
0002869129
-
The evolution of the theory of constraints
-
Gardiner, S.G., J.H. Blackstone Jr., and L.R. Gardiner. "The Evolution of the Theory of Constraints," Industrial Management 36, no. 3 (1994): 13-16.
-
(1994)
Industrial Management
, vol.36
, Issue.3
, pp. 13-16
-
-
Gardiner, S.G.1
Blackstone J.H., Jr.2
Gardiner, L.R.3
-
8
-
-
0030121742
-
Extending the shifting bottleneck procedure to real-life applications
-
Ivens, P., and M. Lambrecht. "Extending the Shifting Bottleneck Procedure to Real-Life Applications." European Journal of Operational Research 90, no. 2 (1996): 252-268.
-
(1996)
European Journal of Operational Research
, vol.90
, Issue.2
, pp. 252-268
-
-
Ivens, P.1
Lambrecht, M.2
-
9
-
-
0020177008
-
Toward understanding lead times in MRP systems
-
Kanet, J.J. "Toward Understanding Lead Times in MRP Systems." Production and Inventory Management Journal 23, no 3 (1982): 1-14.
-
(1982)
Production and Inventory Management Journal
, vol.23
, Issue.3
, pp. 1-14
-
-
Kanet, J.J.1
-
10
-
-
0030233703
-
How to use tooling analysis to reduce setup time and improve throughput
-
Karvonen, S., and J. Holmstrom. "How to Use Tooling Analysis to Reduce Setup Time and Improve Throughput." Production and Inventory Management Journal 37, no. 3 (1996): 75-80.
-
(1996)
Production and Inventory Management Journal
, vol.37
, Issue.3
, pp. 75-80
-
-
Karvonen, S.1
Holmstrom, J.2
-
11
-
-
84987012876
-
Shifting production bottlenecks: Causes, cures, and conundrums
-
Lawrence, S.R., and A.H. Buss. "Shifting Production Bottlenecks: Causes, Cures, and Conundrums," Production and Operations Management 3, no. 1 (1994): 21-37.
-
(1994)
Production and Operations Management
, vol.3
, Issue.1
, pp. 21-37
-
-
Lawrence, S.R.1
Buss, A.H.2
-
12
-
-
0003162762
-
Optimizing theory of constraints when new product alternatives exist
-
Lee, T.N., and G. Plenert. "Optimizing Theory of Constraints when New Product Alternatives Exist." Production and Inventory Management Journal 34, no. 3 (1993): 51-57.
-
(1993)
Production and Inventory Management Journal
, vol.34
, Issue.3
, pp. 51-57
-
-
Lee, T.N.1
Plenert, G.2
-
13
-
-
0040045235
-
John wiley & sons
-
New York
-
Pritsker, A., and B. Alan. Introduction to Simulation and SLAM II, 3rd edition, New York: John Wiley & Sons, 1986, 754.
-
(1986)
Introduction to Simulation and SLAM II, 3rd Edition
, pp. 754
-
-
Pritsker, A.1
Alan, B.2
-
15
-
-
0039453188
-
Competitive factors and performance measurement: Applying the theory of constraints to meet customer needs
-
Wahlers, J.L., and J.F. Cox III. "Competitive Factors and Performance Measurement: Applying the Theory of Constraints to Meet Customer Needs." International Journal of Production Economics 37, no. 2 (1994): 229-240.
-
(1994)
International Journal of Production Economics
, vol.37
, Issue.2
, pp. 229-240
-
-
Wahlers, J.L.1
Cox J.F., III.2
|