메뉴 건너뛰기




Volumn 8, Issue 5-6, 2001, Pages 381-392

Investigating the effect of initial scope establishment on the performance of a project through system dynamics modelling

Author keywords

Design and build procurement; Project performance; Scope definition; System dynamics

Indexed keywords


EID: 84992974815     PISSN: 09699988     EISSN: None     Source Type: Journal    
DOI: 10.1108/eb021198     Document Type: Review
Times cited : (15)

References (18)
  • 1
    • 84861143214 scopus 로고
    • Design and build: a survey of construction contractors' views
    • Akintoye, A. (1994) Design and build: a survey of construction contractors' views. Construction Management and Economics, 12, 155–163
    • (1994) Construction Management and Economics , vol.12 , pp. 155-163
    • Akintoye, A.1
  • 3
    • 84993084106 scopus 로고    scopus 로고
    • The Contract and Dispute Resolution Arrangements in Hong Kong Procurement System
    • Tianjin University Press, China, ISBN 7–5618–0973–5
    • Chan, E.H. (1997) The Contract and Dispute Resolution Arrangements in Hong Kong Procurement System. Construction procurement practice in China and Hong Kong 1996 -Symposium. Tianjin University Press, China, ISBN 7–5618–0973–5, pp. 166–169
    • (1997) Construction procurement practice in China and Hong Kong 1996 -Symposium , pp. 166-169
    • Chan, E.H.1
  • 5
    • 84982698690 scopus 로고
    • Lessons from system dynamics modelling
    • Forrester, JAV. (1987) Lessons from system dynamics modelling. System Dynamics Review 3, 136–149
    • (1987) System Dynamics Review , vol.3 , pp. 136-149
    • Forrester, J.A.V.1
  • 7
    • 0040874828 scopus 로고    scopus 로고
    • Are contractors prepared to take on design and build contracts?
    • Durban, South Africa, 14–17 January
    • Ho, D.C.W., Chau, K.W. & Leung, H.F. (1996) Are contractors prepared to take on design and build contracts? Proceeding of CIB W92 Symposium on Procurement. Durban, South Africa, 14–17 January: 213–224
    • (1996) Proceeding of CIB W92 Symposium on Procurement , pp. 213-224
    • Ho, D.C.W.1    Chau, K.W.2    Leung, H.F.3
  • 9
    • 0346516248 scopus 로고
    • Management of Civil Engineering Design Project: A System Dynamics Model
    • Asian Institute of Technology, Bangkok
    • Lim, J. (1994) Management of Civil Engineering Design Project: A System Dynamics Model. AIT Thesis, No ST-94–10. Asian Institute of Technology, Bangkok
    • (1994) AIT Thesis, No ST-94–10
    • Lim, J.1
  • 10
    • 0023419162 scopus 로고
    • The architect-engineer's role in design-build contracts
    • Fall
    • Loulakis, M.C. (1987) The architect-engineer's role in design-build contracts. Civil Engineering Practice, Fall: 83–96
    • (1987) Civil Engineering Practice , pp. 83-96
    • Loulakis, M.C.1
  • 11
    • 84993081195 scopus 로고    scopus 로고
    • Design and build procurement method in Hong Kong: an overview
    • Montreal, Canada, 20–23 May
    • Mo, J.K. & Ng, L.Y. (1997) Design and build procurement method in Hong Kong: an overview. Proceeding of CIB W92 Symposium on Procurement. Montreal, Canada, 20–23 May: 453–162
    • (1997) Proceeding of CIB W92 Symposium on Procurement , pp. 162-453
    • Mo, J.K.1    Ng, L.Y.2
  • 12
    • 0242434230 scopus 로고    scopus 로고
    • Construction procurement by the design and build approach: a survey of problems
    • 1996, Durban, South Africa, 14–17 January
    • Ndekugri, I. &Church, R. (1996) Construction procurement by the design and build approach: a survey of problems. Procceding of CIB W92 Symposium on Procurement, Durban, South Africa, 14–17 January, 1996,452–462
    • (1996) Procceding of CIB W92 Symposium on Procurement , pp. 452-462
    • Ndekugri, I.1    Church, R.2
  • 13
    • 0028452760 scopus 로고
    • Building procurement by design and build approach. Journal of Construction Engineering and Management, 120, 255. Oberlender, G.D. (1993)
    • McGraw-Hill, New York
    • Ndekugri, I. & Turner, A. (1994) Building procurement by design and build approach. Journal of Construction Engineering and Management, 120, 255. Oberlender, G.D. (1993) Project Management for Engineering and Construction. McGraw-Hill, New York
    • (1994) Project Management for Engineering and Construction
    • Ndekugri, I.1    Turner, A.2
  • 17
    • 84993051178 scopus 로고    scopus 로고
    • The Identification of Inherent Risks in Design-Build Contracts
    • Asian Institute of Technology, Bangkok
    • Sutheerawatthana, P. (1998) The Identification of Inherent Risks in Design-Build Contracts. M.Eng. Thesis, ST-98–33. Asian Institute of Technology, Bangkok
    • (1998) M.Eng. Thesis, ST-98–33
    • Sutheerawatthana, P.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.