메뉴 건너뛰기




Volumn 22, Issue 1, 2004, Pages 47-54

Assessment of the propensity for revisions in design projects through the dichotomous characterization of designer effort

Author keywords

Design planning; Design process; Design revisions; Design rework; Rework propensity

Indexed keywords

DEMONSTRATIONS; PARAMETER ESTIMATION; PLANNING; PRODUCT DESIGN; SOCIAL ASPECTS;

EID: 1142281830     PISSN: 01446193     EISSN: None     Source Type: Journal    
DOI: 10.1080/0144619042000186059     Document Type: Article
Times cited : (11)

References (17)
  • 1
    • 0012083596 scopus 로고    scopus 로고
    • The design co-ordination framework: Key elements for effective product development
    • Duffy, A.H.B. (ed.) Springer-Verlag, London
    • Andreason, M.M., Duffy, A.H.B., MacCallum, K.J., Bowen, J. and Storm, T. (1998) The Design Co-ordination Framework: key elements for effective product development, in Duffy, A.H.B. (ed.) The Design Productivity Debate, Springer-Verlag, London, pp. 151-72.
    • (1998) The Design Productivity Debate , pp. 151-172
    • Andreason, M.M.1    Duffy, A.H.B.2    MacCallum, K.J.3    Bowen, J.4    Storm, T.5
  • 2
    • 0004747337 scopus 로고    scopus 로고
    • Improving design management in the building industry
    • Duffy, A.H.B. (ed.) Springer-Verlag, London
    • Baldwin, A.N., Austin, S.A. and Murray, M.A.P. (1998) Improving design management in the building industry, in Duffy, A.H.B. (ed.) The Design Productivity Debate, Springer-Verlag, London, pp. 255-67.
    • (1998) The Design Productivity Debate , pp. 255-267
    • Baldwin, A.N.1    Austin, S.A.2    Murray, M.A.P.3
  • 3
    • 0024038020 scopus 로고    scopus 로고
    • An ethnographic perspective an engineering design
    • Bucciarelli, L.L. (1998) An ethnographic perspective an engineering design. Design Studies, 9(3), 159-68.
    • (1998) Design Studies , vol.9 , Issue.3 , pp. 159-168
    • Bucciarelli, L.L.1
  • 4
    • 0004791348 scopus 로고    scopus 로고
    • Investigating productivity in engineering design: A theoretical and empirical perspective
    • Duffy, A.H.B. (ed.) Springer-Verlag, London
    • Cantamessa, M. (1998) Investigating productivity in engineering design: a theoretical and empirical perspective, in Duffy, A.H.B. (ed.) The Design Productivity Debate, Springer-Verlag, London, pp. 13-31.
    • (1998) The Design Productivity Debate , pp. 13-31
    • Cantamessa, M.1
  • 5
    • 0003355349 scopus 로고    scopus 로고
    • Design productivity
    • Duffy, A.H.B. (ed.) Springer-Verlag, London
    • Duffy, A.H.B. (1998) Design productivity, in Duffy, A.H.B. (ed.) The Design Productivity Debate, Springer-Verlag, London, pp. 1-9.
    • (1998) The Design Productivity Debate , pp. 1-9
    • Duffy, A.H.B.1
  • 6
    • 0041152854 scopus 로고    scopus 로고
    • A socio-technical system for the support of the management and control of engineering design projects
    • Duffy, A.H.B. (ed.) Springer-Verlag, London
    • Jagodzinski, A.P., Parsons, R., Burningham, C., Evans, J., Reid, F. and Culverhouse, P.F. (1998) A socio-technical system for the support of the management and control of engineering design projects, in Duffy, A.H.B. (ed.) The Design Productivity Debate, Springer-Verlag, London, pp. 113-50.
    • (1998) The Design Productivity Debate , pp. 113-150
    • Jagodzinski, A.P.1    Parsons, R.2    Burningham, C.3    Evans, J.4    Reid, F.5    Culverhouse, P.F.6
  • 7
    • 0000797825 scopus 로고    scopus 로고
    • Quantifying the causes and costs of rework in construction
    • Love, P.E.D. and Li, H. (2000a) Quantifying the causes and costs of rework in construction. Construction Management and Economics, 18, 479-90.
    • (2000) Construction Management and Economics , vol.18 , pp. 479-490
    • Love, P.E.D.1    Li, H.2
  • 8
    • 2142718584 scopus 로고    scopus 로고
    • Modelling the dynamics of design error induced rework in construction
    • Love, P.E.D. and Li, H. (2000b) Modelling the dynamics of design error induced rework in construction. Construction Management and Economics, 18, 567-74.
    • (2000) Construction Management and Economics , vol.18 , pp. 567-574
    • Love, P.E.D.1    Li, H.2
  • 9
    • 0001187120 scopus 로고    scopus 로고
    • Determining the causal structure of rework influences in construction
    • Love, P.E.D., Mandal, P. and Li, H. (1999) Determining the causal structure of rework influences in construction. Construction Management and Economics, 17, 505-17.
    • (1999) Construction Management and Economics , vol.17 , pp. 505-517
    • Love, P.E.D.1    Mandal, P.2    Li, H.3
  • 11
    • 0024088979 scopus 로고
    • Design productivity: A quality problem
    • ASCE
    • McGeorge, J.F. (1988) Design productivity: a quality problem. Journal of Management in Engineering, ASCE, 4(4), 350-62.
    • (1988) Journal of Management in Engineering , vol.4 , Issue.4 , pp. 350-362
    • McGeorge, J.F.1
  • 12
    • 0004804408 scopus 로고    scopus 로고
    • Negotiating right along: An extended case study of the social activity of engineering design
    • Duffy, A.H.B. (ed.) Springer-Verlag, London
    • Minneman, S.L. and Harrison, S.R. (1998) Negotiating right along: an extended case study of the social activity of engineering design, in Duffy, A.H.B. (ed.) The Design Productivity Debate, Springer-Verlag, London, pp. 14-31.
    • (1998) The Design Productivity Debate , pp. 14-31
    • Minneman, S.L.1    Harrison, S.R.2
  • 14
    • 0004256568 scopus 로고
    • Springer-Verlag, New York
    • Pitman, J. (1993) Probability, Springer-Verlag, New York.
    • (1993) Probability
    • Pitman, J.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.