-
1
-
-
0032710315
-
Match-up scheduling under a machine breakdown
-
Akturk, M. S. and Gorgulu, E., 1998, Match-up scheduling under a machine breakdown. European Journal of Operational Research, 112, 80-96.
-
(1998)
European Journal of Operational Research
, vol.112
, pp. 80-96
-
-
Akturk, M.S.1
Gorgulu, E.2
-
2
-
-
0000229534
-
Match-up scheduling with multiple resources, release dates and disruptions
-
Bean, J., Birge, J. R., Mittenhal, J. and Noon, C. E., 1991, Match-up scheduling with multiple resources, release dates and disruptions. Operations Research, 39, 470-483.
-
(1991)
Operations Research
, vol.39
, pp. 470-483
-
-
Bean, J.1
Birge, J.R.2
Mittenhal, J.3
Noon, C.E.4
-
3
-
-
0032049255
-
Decomposition heuristics for robust job-shop scheduling
-
Byeon, E. S., Wu, S. D. and Storer, R. H., 1998, Decomposition heuristics for robust job-shop scheduling. IEEE Transactions on Robotics and Automation, 14, 303-313.
-
(1998)
IEEE Transactions on Robotics and Automation
, vol.14
, pp. 303-313
-
-
Byeon, E.S.1
Wu, S.D.2
Storer, R.H.3
-
4
-
-
0025555793
-
Reacting to scheduling exceptions in FMS environments
-
Dutta, A., 1990, Reacting to scheduling exceptions in FMS environments. IIE Transactions, 22, 300-314.
-
(1990)
IIE Transactions
, vol.22
, pp. 300-314
-
-
Dutta, A.1
-
5
-
-
84982522109
-
ISIS-a knowledge-based system for factory scheduling
-
Fox, M. S. and Smith, S. F., 1984, ISIS-a knowledge-based system for factory scheduling. Expert Systems, 1, 25-49.
-
(1984)
Expert Systems
, vol.1
, pp. 25-49
-
-
Fox, M.S.1
Smith, S.F.2
-
6
-
-
0002960598
-
Effects of inaccuracy of processing time estimation on effectiveness of dispatching rule
-
He, Y., Smith, M. L. and Dudek, R. A., 1994, Effects of inaccuracy of processing time estimation on effectiveness of dispatching rule. Proceedings of the 3rd Industrial Engineering Research Conference, pp. 308-313.
-
(1994)
Proceedings of the 3rd Industrial Engineering Research Conference
, pp. 308-313
-
-
He, Y.1
Smith, M.L.2
Dudek, R.A.3
-
7
-
-
0023210016
-
Real-time control of manufacturing systems with redundancy
-
Jain, S. and Foley, W. J., 1987, Real-time control of manufacturing systems with redundancy. Proceedings of the 1987 ASME International Computers in Engineering Conference and Exhibition, New York, pp. 235-239.
-
(1987)
Proceedings of the 1987 ASME International Computers in Engineering Conference and Exhibition, New York
, pp. 235-239
-
-
Jain, S.1
Foley, W.J.2
-
8
-
-
0028594405
-
Simulation-based real-time scheduling in a flexible manufacturing system
-
Kim, M. H. and Kim, Y., Simulation-based real-time scheduling in a flexible manufacturing system. Journal of Manufacturing Systems, 13, 85-93.
-
(1994)
Journal of Manufacturing Systems
, vol.13
, pp. 85-93
-
-
Kim, M.H.1
Kim, Y.2
-
10
-
-
0032784020
-
An analysis of heuristics in a dynamic job shop with weighted tardiness objectives
-
Kutanoglu, E. and Sabuncuoglu, I., 1999, An analysis of heuristics in a dynamic job shop with weighted tardiness objectives. International Journal of Production Research, 37, 165-187.
-
(1999)
International Journal of Production Research
, vol.37
, pp. 165-187
-
-
Kutanoglu, E.1
Sabuncuoglu, I.2
-
12
-
-
0031069765
-
Heuristic, optimal, static, and dynamic schedules when processing times are uncertain
-
Lawrence, S. R. and Sewell, E. C., 1997, Heuristic, optimal, static, and dynamic schedules when processing times are uncertain. Journal of Operations Management, 15, 71-82.
-
(1997)
Journal of Operations Management
, vol.15
, pp. 71-82
-
-
Lawrence, S.R.1
Sewell, E.C.2
-
13
-
-
0028499648
-
Robustness measures and robust scheduling for job shops
-
Leon, V. J., Wu, S. D. and Storer, R. H., 1994, Robustness measures and robust scheduling for job shops. IEE Transactions, 26, 1243-1263.
-
(1994)
IEE Transactions
, vol.26
, pp. 1243-1263
-
-
Leon, V.J.1
Wu, S.D.2
Storer, R.H.3
-
14
-
-
0027625187
-
Sequencing, dispatching, and switching in a dynamic manufacturing environment
-
Matsuura, H., Tsubone, H. and Kanezashi, M., 1993, Sequencing, dispatching, and switching in a dynamic manufacturing environment. International Journal of Production Research, 31, 1671-1688.
-
(1993)
International Journal of Production Research
, vol.31
, pp. 1671-1688
-
-
Matsuura, H.1
Tsubone, H.2
Kanezashi, M.3
-
15
-
-
0032097829
-
Predictable scheduling of a job shop subject to breakdowns
-
Mehta, S. V. and Uzsoy, R. M., 1998, Predictable scheduling of a job shop subject to breakdowns. IEEE Transactions on Robotics and Automation, 14, 365-378.
-
(1998)
IEEE Transactions on Robotics and Automation
, vol.14
, pp. 365-378
-
-
Mehta, S.V.1
Uzsoy, R.M.2
-
17
-
-
84952253486
-
Job shop scheduling heuristic and frequency of scheduling
-
Muhlemann, A. P., Lockett, A. G. and Farn, C. K., 1982, Job shop scheduling heuristic and frequency of scheduling. International Journal of Production Research, 20, 227-241.
-
(1982)
International Journal of Production Research
, vol.20
, pp. 227-241
-
-
Muhlemann, A.P.1
Lockett, A.G.2
Farn, C.K.3
-
18
-
-
0001466672
-
Adaptive/predictive scheduling: Review and a general framework
-
Nof, S. Y. and Grant, F. H., 1991, Adaptive/predictive scheduling: review and a general framework. Production Planning and Control, 2, 298-312.
-
(1991)
Production Planning and Control
, vol.2
, pp. 298-312
-
-
Nof, S.Y.1
Grant, F.H.2
-
20
-
-
0034326104
-
Analysis of reactive scheduling problems in a job shop environment
-
Sabuncuoglu, I. and Bayiz, M., 2000, Analysis of reactive scheduling problems in a job shop environment. European Journal of Operational Research, 126, 567-586.
-
(2000)
European Journal of Operational Research
, vol.126
, pp. 567-586
-
-
Sabuncuoglu, I.1
Bayiz, M.2
-
21
-
-
85058200200
-
Rescheduling frequency in an FMS with uncertain processing times and unreliiable machines
-
Sabuncuoglu, I. and Karabuk, S., 1999, Rescheduling frequency in an FMS with uncertain processing times and unreliiable machines. Journal of Manufacturing Systems, 18, 1-16.
-
(1999)
Journal of Manufacturing Systems
, vol.18
, pp. 1-16
-
-
Sabuncuoglu, I.1
Karabuk, S.2
-
22
-
-
0025442958
-
An integrated framework for generating and revising factory schedules
-
Smith, S. F., Ow, P. S., Potvin, J. and Matthys, D. C., 1990, An integrated framework for generating and revising factory schedules. Journal of the Operational Research Society, 41, 539-552.
-
(1990)
Journal of the Operational Research Society
, vol.41
, pp. 539-552
-
-
Smith, S.F.1
Ow, P.S.2
Potvin, J.3
Matthys, D.C.4
-
23
-
-
0002646899
-
Knowledge-based reactive scheduling
-
Szelke, E. and Kerr, R., 1994, Knowledge-based reactive scheduling. Production Planning and Control, 5, 124-145.
-
(1994)
Production Planning and Control
, vol.5
, pp. 124-145
-
-
Szelke, E.1
Kerr, R.2
-
24
-
-
0000927907
-
A graph-theoretic decomposition of job shop scheduling problems to achieve scheduling robustness
-
Wu, S. D., Byeon, E. S. and Storer, R. H., 1999, A graph-theoretic decomposition of job shop scheduling problems to achieve scheduling robustness. Operations Research, 47, 113-124.
-
(1999)
Operations Research
, vol.47
, pp. 113-124
-
-
Wu, S.D.1
Byeon, E.S.2
Storer, R.H.3
-
25
-
-
0027224847
-
One-machine rescheduling heuristics with efficiency and stability as criteria
-
Wu, S. D., Storer, R. H. and Chang, P., 1993, One-machine rescheduling heuristics with efficiency and stability as criteria. Computers and Operations Research, 20, 1-13.
-
(1993)
Computers and Operations Research
, vol.20
, pp. 1-3
-
-
Wu, S.D.1
Storer, R.H.2
Chang, P.3
-
26
-
-
0022097890
-
Scheduling and rescheduling in the manufacturing operating system environment
-
Yamamoto, M. and Nof, S. Y., 1985, Scheduling and rescheduling in the manufacturing operating system environment. International Journal of Production Research, 23, 705-722.
-
(1985)
International Journal of Production Research
, vol.23
, pp. 705-722
-
-
Yamamoto, M.1
Nof, S.Y.2
|