메뉴 건너뛰기




Volumn 39, Issue 14, 2001, Pages 3141-3158

Routing-based reactive scheduling policies for machine failures in dynamic job shops

Author keywords

[No Author keywords available]

Indexed keywords

COMPUTATIONAL METHODS; CONTROL SYSTEMS; FAILURE ANALYSIS; JOB ANALYSIS; MATERIALS HANDLING; REPAIR; TIME AND MOTION STUDY;

EID: 0035922494     PISSN: 00207543     EISSN: None     Source Type: Journal    
DOI: 10.1080/00207540110057909     Document Type: Article
Times cited : (52)

References (26)
  • 2
    • 0000229534 scopus 로고
    • Match-up scheduling with multiple resources, release dates and disruptions
    • Bean, J., Birge, J. R., Mittenhal, J. and Noon, C. E., 1991, Match-up scheduling with multiple resources, release dates and disruptions. Operations Research, 39, 470-483.
    • (1991) Operations Research , vol.39 , pp. 470-483
    • Bean, J.1    Birge, J.R.2    Mittenhal, J.3    Noon, C.E.4
  • 4
    • 0025555793 scopus 로고
    • Reacting to scheduling exceptions in FMS environments
    • Dutta, A., 1990, Reacting to scheduling exceptions in FMS environments. IIE Transactions, 22, 300-314.
    • (1990) IIE Transactions , vol.22 , pp. 300-314
    • Dutta, A.1
  • 5
    • 84982522109 scopus 로고
    • ISIS-a knowledge-based system for factory scheduling
    • Fox, M. S. and Smith, S. F., 1984, ISIS-a knowledge-based system for factory scheduling. Expert Systems, 1, 25-49.
    • (1984) Expert Systems , vol.1 , pp. 25-49
    • Fox, M.S.1    Smith, S.F.2
  • 8
    • 0028594405 scopus 로고
    • Simulation-based real-time scheduling in a flexible manufacturing system
    • Kim, M. H. and Kim, Y., Simulation-based real-time scheduling in a flexible manufacturing system. Journal of Manufacturing Systems, 13, 85-93.
    • (1994) Journal of Manufacturing Systems , vol.13 , pp. 85-93
    • Kim, M.H.1    Kim, Y.2
  • 10
    • 0032784020 scopus 로고    scopus 로고
    • An analysis of heuristics in a dynamic job shop with weighted tardiness objectives
    • Kutanoglu, E. and Sabuncuoglu, I., 1999, An analysis of heuristics in a dynamic job shop with weighted tardiness objectives. International Journal of Production Research, 37, 165-187.
    • (1999) International Journal of Production Research , vol.37 , pp. 165-187
    • Kutanoglu, E.1    Sabuncuoglu, I.2
  • 12
    • 0031069765 scopus 로고    scopus 로고
    • Heuristic, optimal, static, and dynamic schedules when processing times are uncertain
    • Lawrence, S. R. and Sewell, E. C., 1997, Heuristic, optimal, static, and dynamic schedules when processing times are uncertain. Journal of Operations Management, 15, 71-82.
    • (1997) Journal of Operations Management , vol.15 , pp. 71-82
    • Lawrence, S.R.1    Sewell, E.C.2
  • 13
    • 0028499648 scopus 로고
    • Robustness measures and robust scheduling for job shops
    • Leon, V. J., Wu, S. D. and Storer, R. H., 1994, Robustness measures and robust scheduling for job shops. IEE Transactions, 26, 1243-1263.
    • (1994) IEE Transactions , vol.26 , pp. 1243-1263
    • Leon, V.J.1    Wu, S.D.2    Storer, R.H.3
  • 18
    • 0001466672 scopus 로고
    • Adaptive/predictive scheduling: Review and a general framework
    • Nof, S. Y. and Grant, F. H., 1991, Adaptive/predictive scheduling: review and a general framework. Production Planning and Control, 2, 298-312.
    • (1991) Production Planning and Control , vol.2 , pp. 298-312
    • Nof, S.Y.1    Grant, F.H.2
  • 20
    • 0034326104 scopus 로고    scopus 로고
    • Analysis of reactive scheduling problems in a job shop environment
    • Sabuncuoglu, I. and Bayiz, M., 2000, Analysis of reactive scheduling problems in a job shop environment. European Journal of Operational Research, 126, 567-586.
    • (2000) European Journal of Operational Research , vol.126 , pp. 567-586
    • Sabuncuoglu, I.1    Bayiz, M.2
  • 21
    • 85058200200 scopus 로고    scopus 로고
    • Rescheduling frequency in an FMS with uncertain processing times and unreliiable machines
    • Sabuncuoglu, I. and Karabuk, S., 1999, Rescheduling frequency in an FMS with uncertain processing times and unreliiable machines. Journal of Manufacturing Systems, 18, 1-16.
    • (1999) Journal of Manufacturing Systems , vol.18 , pp. 1-16
    • Sabuncuoglu, I.1    Karabuk, S.2
  • 24
    • 0000927907 scopus 로고    scopus 로고
    • A graph-theoretic decomposition of job shop scheduling problems to achieve scheduling robustness
    • Wu, S. D., Byeon, E. S. and Storer, R. H., 1999, A graph-theoretic decomposition of job shop scheduling problems to achieve scheduling robustness. Operations Research, 47, 113-124.
    • (1999) Operations Research , vol.47 , pp. 113-124
    • Wu, S.D.1    Byeon, E.S.2    Storer, R.H.3
  • 25
    • 0027224847 scopus 로고
    • One-machine rescheduling heuristics with efficiency and stability as criteria
    • Wu, S. D., Storer, R. H. and Chang, P., 1993, One-machine rescheduling heuristics with efficiency and stability as criteria. Computers and Operations Research, 20, 1-13.
    • (1993) Computers and Operations Research , vol.20 , pp. 1-3
    • Wu, S.D.1    Storer, R.H.2    Chang, P.3
  • 26
    • 0022097890 scopus 로고
    • Scheduling and rescheduling in the manufacturing operating system environment
    • Yamamoto, M. and Nof, S. Y., 1985, Scheduling and rescheduling in the manufacturing operating system environment. International Journal of Production Research, 23, 705-722.
    • (1985) International Journal of Production Research , vol.23 , pp. 705-722
    • Yamamoto, M.1    Nof, S.Y.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.