메뉴 건너뛰기




Volumn 37, Issue 3, 1998, Pages 213-231

Holonic manufacturing scheduling: Architecture, cooperation mechanism, and implementation

Author keywords

Agent based systems; Holonic systems; Intelligent manufacturing systems; Lagrangian relaxation; Manufacturing scheduling

Indexed keywords

ARTIFICIAL INTELLIGENCE; COMPUTER SIMULATION; DECISION MAKING; DECISION SUPPORT SYSTEMS; DISTRIBUTED COMPUTER SYSTEMS; OPTIMIZATION; SCHEDULING;

EID: 0032202838     PISSN: 01663615     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0166-3615(98)00100-6     Document Type: Article
Times cited : (132)

References (43)
  • 1
    • 0345889526 scopus 로고
    • The implementation and control of advanced manufacturing systems
    • IFS Publications, Springer-Verlag, Berlin, UK
    • P. Anstiss, The implementation and control of advanced manufacturing systems, Control and Programming in Advanced Manufacturing, IFS Publications, Springer-Verlag, Berlin, UK, 1988.
    • (1988) Control and Programming in Advanced Manufacturing
    • Anstiss, P.1
  • 2
    • 85031566014 scopus 로고    scopus 로고
    • A survey of factory control algorithms which can be implemented in a multi-agent heterachy
    • submitted
    • A.D. Baker, A survey of factory control algorithms which can be implemented in a multi-agent heterachy, submitted to the Journal of Manufacturing Systems, 1997.
    • (1997) Journal of Manufacturing Systems
    • Baker, A.D.1
  • 3
    • 84885535756 scopus 로고    scopus 로고
    • Manufacturing over the Internet and into Your Living Room: Perspectives from the AARIA Project
    • submitted
    • A.D. Baker, H.V.D. Parunak, E. Erol, Manufacturing over the Internet and into Your Living Room: Perspectives from the AARIA Project, submitted to the IEEE Internet Computing, 1997.
    • (1997) IEEE Internet Computing
    • Baker, A.D.1    Parunak, H.V.D.2    Erol, E.3
  • 4
    • 0001328675 scopus 로고
    • Changing the Role of Top Management: Beyond Structure to Process
    • C.A. Bartlett, S. Ghoshal, Changing the Role of Top Management: Beyond Structure to Process, National Productivity Review, January-February, 1995, 86-96.
    • (1995) National Productivity Review , vol.JANUARY-FEBRUARY , pp. 86-96
    • Bartlett, C.A.1    Ghoshal, S.2
  • 10
    • 0242665905 scopus 로고
    • A proposed structure for distributed shop floor control
    • T.J. Crowe, E.J. Stahlman, A proposed structure for distributed shop floor control, Integrated Manufacturing Systems 6 (6) (1995) 31-36.
    • (1995) Integrated Manufacturing Systems , vol.6 , Issue.6 , pp. 31-36
    • Crowe, T.J.1    Stahlman, E.J.2
  • 11
    • 0028413489 scopus 로고
    • Scheduling products with bills of materials using an improved Lagrangian relaxation technique
    • C.S. Czerwinski, P.B. Luh, Scheduling products with bills of materials using an improved Lagrangian relaxation technique, IEEE Trans. Robotics and Automation 10 (2) (1994) 99-111.
    • (1994) IEEE Trans. Robotics and Automation , vol.10 , Issue.2 , pp. 99-111
    • Czerwinski, C.S.1    Luh, P.B.2
  • 12
    • 0001903311 scopus 로고
    • The Coming of the New Organization
    • P.F. Drucker, The Coming of the New Organization, Harvard Business Review, January-February, 1988, 45-53.
    • (1988) Harvard Business Review , vol.JANUARY-FEBRUARY , pp. 45-53
    • Drucker, P.F.1
  • 14
    • 0028590749 scopus 로고
    • Real-time distributed scheduling of heterarchical manufacturing systems
    • N.A. Duffie, V.V. Prabhu, Real-time distributed scheduling of heterarchical manufacturing systems, Journal of Manufacturing Systems 13 (2) (1994) 175-179.
    • (1994) Journal of Manufacturing Systems , vol.13 , Issue.2 , pp. 175-179
    • Duffie, N.A.1    Prabhu, V.V.2
  • 15
    • 0002504366 scopus 로고
    • Management, technology and agility: The emergence of a new ear in manufacturing
    • S.L. Goldman, R.N. Nagel, Management, technology and agility: the emergence of a new ear in manufacturing, International Journal of Technology Management 8 (1/2) (1993) 18-38.
    • (1993) International Journal of Technology Management , vol.8 , Issue.1-2 , pp. 18-38
    • Goldman, S.L.1    Nagel, R.N.2
  • 17
    • 0345889512 scopus 로고
    • MRP/MRP II
    • A. Rolstadas (Ed.), Springer-Verlag
    • J. Harhen, MRP/MRP II, in: A. Rolstadas (Ed.), Computer-Aided Production Management, Springer-Verlag, 1988, 23-35.
    • (1988) Computer-Aided Production Management , pp. 23-35
    • Harhen, J.1
  • 19
    • 0000759103 scopus 로고
    • Intelligence and cooperation in heterarchic manufacturing systems
    • J. Hatvany, Intelligence and cooperation in heterarchic manufacturing systems, Robotics Computer-Integrated Manufacturing 2 (2) (1985) 101-104.
    • (1985) Robotics Computer-Integrated Manufacturing , vol.2 , Issue.2 , pp. 101-104
    • Hatvany, J.1
  • 23
    • 84950937653 scopus 로고
    • Integrated shop floor control using autonomous agents
    • G.Y. Lin, J.J. Solberg, Integrated shop floor control using autonomous agents, HE Transaction 24 (3) (1992) 57-71.
    • (1992) HE Transaction , vol.24 , Issue.3 , pp. 57-71
    • Lin, G.Y.1    Solberg, J.J.2
  • 26
    • 0027625736 scopus 로고
    • Scheduling of manufacturing systems using the Lagrangian relaxation technique
    • P.B. Luh, D.J. Hoitomt, Scheduling of manufacturing systems using the Lagrangian relaxation technique, IEEE Trans. Automatic Control 38 (6) (1993) 1066-1080.
    • (1993) IEEE Trans. Automatic Control , vol.38 , Issue.6 , pp. 1066-1080
    • Luh, P.B.1    Hoitomt, D.J.2
  • 27
    • 0029409075 scopus 로고
    • Organization foundations of intelligent manufacturing systems - The Holonic Viewpoint
    • J. Mathews, Organization foundations of intelligent manufacturing systems - The Holonic Viewpoint, Computer Integrated Manufacturing Systems 8 (4) (1995) 237-243.
    • (1995) Computer Integrated Manufacturing Systems , vol.8 , Issue.4 , pp. 237-243
    • Mathews, J.1
  • 28
    • 0030216517 scopus 로고    scopus 로고
    • Multi-agent mediator architecture for distributed manufacturing
    • F.P. Maturana, D.H. Norrie, Multi-agent mediator architecture for distributed manufacturing, Journal of Intelligent Manufacturing 7 (1996) 257-270.
    • (1996) Journal of Intelligent Manufacturing , vol.7 , pp. 257-270
    • Maturana, F.P.1    Norrie, D.H.2
  • 35
    • 0023830408 scopus 로고
    • Dynamic scheduling in cellular manufacturing systems: A framework for networked decision making
    • M.J. Shaw, Dynamic scheduling in cellular manufacturing systems: a framework for networked decision making, Journal of Manufacturing Systems 7 (2) (1988) 83-94.
    • (1988) Journal of Manufacturing Systems , vol.7 , Issue.2 , pp. 83-94
    • Shaw, M.J.1
  • 36
    • 0019180974 scopus 로고
    • The contract net protocol: High-level communication and control in a distributed problem solver
    • R.G. Smith, The contract net protocol: high-level communication and control in a distributed problem solver, IEEE Trans. Computer 29 (12) (1980) 1104-1113.
    • (1980) IEEE Trans. Computer , vol.29 , Issue.12 , pp. 1104-1113
    • Smith, R.G.1
  • 37
    • 85033926317 scopus 로고    scopus 로고
    • Techno Japan, No. 10
    • H. Suda, Future Factory System Formulated in Japan, Techno Japan, Part 1: Vol. 22, No. 10, 15-25; Part 2: Vol. 23, No. 3, 1989 and 1990, 51-61.
    • Future Factory System Formulated in Japan , vol.22 , Issue.1 PART , pp. 15-25
    • Suda, H.1
  • 38
    • 0346520391 scopus 로고
    • No. 3
    • H. Suda, Future Factory System Formulated in Japan, Techno Japan, Part 1: Vol. 22, No. 10, 15-25; Part 2: Vol. 23, No. 3, 1989 and 1990, 51-61.
    • (1989) Future Factory System Formulated in Japan , vol.23 , Issue.2 PART , pp. 51-61


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.