-
1
-
-
0345889526
-
The implementation and control of advanced manufacturing systems
-
IFS Publications, Springer-Verlag, Berlin, UK
-
P. Anstiss, The implementation and control of advanced manufacturing systems, Control and Programming in Advanced Manufacturing, IFS Publications, Springer-Verlag, Berlin, UK, 1988.
-
(1988)
Control and Programming in Advanced Manufacturing
-
-
Anstiss, P.1
-
2
-
-
85031566014
-
A survey of factory control algorithms which can be implemented in a multi-agent heterachy
-
submitted
-
A.D. Baker, A survey of factory control algorithms which can be implemented in a multi-agent heterachy, submitted to the Journal of Manufacturing Systems, 1997.
-
(1997)
Journal of Manufacturing Systems
-
-
Baker, A.D.1
-
3
-
-
84885535756
-
Manufacturing over the Internet and into Your Living Room: Perspectives from the AARIA Project
-
submitted
-
A.D. Baker, H.V.D. Parunak, E. Erol, Manufacturing over the Internet and into Your Living Room: Perspectives from the AARIA Project, submitted to the IEEE Internet Computing, 1997.
-
(1997)
IEEE Internet Computing
-
-
Baker, A.D.1
Parunak, H.V.D.2
Erol, E.3
-
4
-
-
0001328675
-
Changing the Role of Top Management: Beyond Structure to Process
-
C.A. Bartlett, S. Ghoshal, Changing the Role of Top Management: Beyond Structure to Process, National Productivity Review, January-February, 1995, 86-96.
-
(1995)
National Productivity Review
, vol.JANUARY-FEBRUARY
, pp. 86-96
-
-
Bartlett, C.A.1
Ghoshal, S.2
-
7
-
-
0024128204
-
New trends in machine scheduling
-
J. Blazewicz, G. Finke, R. Haupt, G. Schmidt, New trends in machine scheduling, European Journal of Operational Research 36 (1988) 303-316.
-
(1988)
European Journal of Operational Research
, vol.36
, pp. 303-316
-
-
Blazewicz, J.1
Finke, G.2
Haupt, R.3
Schmidt, G.4
-
8
-
-
0003025656
-
Scheduling execution in holonic manufacturing systems
-
L. Bongaerts, P. Valckenaers, H. Van Brussel, P. Peeters, 1997, Scheduling execution in holonic manufacturing systems, in: Proc. 29th CIRP International Seminar on Manufacturing Systems, 209-214.
-
(1997)
Proc. 29th CIRP International Seminar on Manufacturing Systems
, pp. 209-214
-
-
Bongaerts, L.1
Valckenaers, P.2
Van Brussel, H.3
Peeters, P.4
-
9
-
-
0029179964
-
A more effective Lagrangian relaxation approach
-
H. Chen, C. Chu, J.M. Proth, A more effective Lagrangian relaxation approach, in: Proc. IEEE Int. Conf. on Robotics and Automation, 1995, 496-501.
-
(1995)
Proc. IEEE Int. Conf. on Robotics and Automation
, pp. 496-501
-
-
Chen, H.1
Chu, C.2
Proth, J.M.3
-
10
-
-
0242665905
-
A proposed structure for distributed shop floor control
-
T.J. Crowe, E.J. Stahlman, A proposed structure for distributed shop floor control, Integrated Manufacturing Systems 6 (6) (1995) 31-36.
-
(1995)
Integrated Manufacturing Systems
, vol.6
, Issue.6
, pp. 31-36
-
-
Crowe, T.J.1
Stahlman, E.J.2
-
11
-
-
0028413489
-
Scheduling products with bills of materials using an improved Lagrangian relaxation technique
-
C.S. Czerwinski, P.B. Luh, Scheduling products with bills of materials using an improved Lagrangian relaxation technique, IEEE Trans. Robotics and Automation 10 (2) (1994) 99-111.
-
(1994)
IEEE Trans. Robotics and Automation
, vol.10
, Issue.2
, pp. 99-111
-
-
Czerwinski, C.S.1
Luh, P.B.2
-
12
-
-
0001903311
-
The Coming of the New Organization
-
P.F. Drucker, The Coming of the New Organization, Harvard Business Review, January-February, 1988, 45-53.
-
(1988)
Harvard Business Review
, vol.JANUARY-FEBRUARY
, pp. 45-53
-
-
Drucker, P.F.1
-
14
-
-
0028590749
-
Real-time distributed scheduling of heterarchical manufacturing systems
-
N.A. Duffie, V.V. Prabhu, Real-time distributed scheduling of heterarchical manufacturing systems, Journal of Manufacturing Systems 13 (2) (1994) 175-179.
-
(1994)
Journal of Manufacturing Systems
, vol.13
, Issue.2
, pp. 175-179
-
-
Duffie, N.A.1
Prabhu, V.V.2
-
15
-
-
0002504366
-
Management, technology and agility: The emergence of a new ear in manufacturing
-
S.L. Goldman, R.N. Nagel, Management, technology and agility: the emergence of a new ear in manufacturing, International Journal of Technology Management 8 (1/2) (1993) 18-38.
-
(1993)
International Journal of Technology Management
, vol.8
, Issue.1-2
, pp. 18-38
-
-
Goldman, S.L.1
Nagel, R.N.2
-
16
-
-
0003162455
-
Holonic planning and scheduling for a robotic assembly test bed
-
L. Gou, T. Hasegawa, P.B. Luh, S. Tamura, J.M. Oblak, Holonic planning and scheduling for a robotic assembly test bed, in: Proc. 4th International Conference on Computer Integrated Manufacturing and Automation Technology, 1994, 142-149.
-
(1994)
Proc. 4th International Conference on Computer Integrated Manufacturing and Automation Technology
, pp. 142-149
-
-
Gou, L.1
Hasegawa, T.2
Luh, P.B.3
Tamura, S.4
Oblak, J.M.5
-
17
-
-
0345889512
-
MRP/MRP II
-
A. Rolstadas (Ed.), Springer-Verlag
-
J. Harhen, MRP/MRP II, in: A. Rolstadas (Ed.), Computer-Aided Production Management, Springer-Verlag, 1988, 23-35.
-
(1988)
Computer-Aided Production Management
, pp. 23-35
-
-
Harhen, J.1
-
18
-
-
0009350971
-
Holonic planning and scheduling architecture for manufacturing
-
Keele, UK
-
T. Hasegawa, L. Gou, S. Tamura, P.B. Luh, J.M. Oblak, Holonic planning and scheduling architecture for manufacturing, in: Proc. 2nd International Working Conference on Cooperating Knowledge Based Systems, Keele, UK, 1994, 125-139.
-
(1994)
Proc. 2nd International Working Conference on Cooperating Knowledge Based Systems
, pp. 125-139
-
-
Hasegawa, T.1
Gou, L.2
Tamura, S.3
Luh, P.B.4
Oblak, J.M.5
-
19
-
-
0000759103
-
Intelligence and cooperation in heterarchic manufacturing systems
-
J. Hatvany, Intelligence and cooperation in heterarchic manufacturing systems, Robotics Computer-Integrated Manufacturing 2 (2) (1985) 101-104.
-
(1985)
Robotics Computer-Integrated Manufacturing
, vol.2
, Issue.2
, pp. 101-104
-
-
Hatvany, J.1
-
23
-
-
84950937653
-
Integrated shop floor control using autonomous agents
-
G.Y. Lin, J.J. Solberg, Integrated shop floor control using autonomous agents, HE Transaction 24 (3) (1992) 57-71.
-
(1992)
HE Transaction
, vol.24
, Issue.3
, pp. 57-71
-
-
Lin, G.Y.1
Solberg, J.J.2
-
24
-
-
0005340114
-
Modeling uncertainty in job shop scheduling
-
India
-
P.B. Luh, D. Chen, L.S. Thakur, Modeling uncertainty in job shop scheduling, in: Proc. 1st International Conference on Operations and Quantitative Management Jaipur, India, 1997, 490-497.
-
(1997)
Proc. 1st International Conference on Operations and Quantitative Management Jaipur
, pp. 490-497
-
-
Luh, P.B.1
Chen, D.2
Thakur, L.S.3
-
25
-
-
0041375052
-
Job shop scheduling with group-dependent setups, finite buffers, and long time horizon
-
P.B. Luh, L. Gou, Y. Zhang, T. Odahara, M. Tsuji, K. Yoneda, T. Hasegawa, Y. Kyoya, Job shop scheduling with group-dependent setups, finite buffers, and long time horizon, Annals of Operations Research 76 (1998) 233-259.
-
(1998)
Annals of Operations Research
, vol.76
, pp. 233-259
-
-
Luh, P.B.1
Gou, L.2
Zhang, Y.3
Odahara, T.4
Tsuji, M.5
Yoneda, K.6
Hasegawa, T.7
Kyoya, Y.8
-
26
-
-
0027625736
-
Scheduling of manufacturing systems using the Lagrangian relaxation technique
-
P.B. Luh, D.J. Hoitomt, Scheduling of manufacturing systems using the Lagrangian relaxation technique, IEEE Trans. Automatic Control 38 (6) (1993) 1066-1080.
-
(1993)
IEEE Trans. Automatic Control
, vol.38
, Issue.6
, pp. 1066-1080
-
-
Luh, P.B.1
Hoitomt, D.J.2
-
27
-
-
0029409075
-
Organization foundations of intelligent manufacturing systems - The Holonic Viewpoint
-
J. Mathews, Organization foundations of intelligent manufacturing systems - The Holonic Viewpoint, Computer Integrated Manufacturing Systems 8 (4) (1995) 237-243.
-
(1995)
Computer Integrated Manufacturing Systems
, vol.8
, Issue.4
, pp. 237-243
-
-
Mathews, J.1
-
29
-
-
0026986735
-
Production Scheduling in Autonomous Distributed Manufacturing Systems
-
ASME
-
T. Moriwaki, N. Sugimura, Y.Y. Matawirya, S.H. Wirjomartono, Production Scheduling in Autonomous Distributed Manufacturing Systems, in: Quality Assurance Through Integration of Manufacturing Processes and Systems, PED-Vol. 56, ASME, 1993, 175-186.
-
(1993)
Quality Assurance Through Integration of Manufacturing Processes and Systems
, vol.56
, pp. 175-186
-
-
Moriwaki, T.1
Sugimura, N.2
Matawirya, Y.Y.3
Wirjomartono, S.H.4
-
30
-
-
0003764518
-
-
Iacocca Institute, Lehigh University, Bethlehem, PA
-
R.N. Nagel, R.D. Dove, 21st Century Manufacturing Enterprise Strategy, Iacocca Institute, Lehigh University, Bethlehem, PA, 1991.
-
(1991)
21st Century Manufacturing Enterprise Strategy
-
-
Nagel, R.N.1
Dove, R.D.2
-
32
-
-
0030673502
-
The AARIA agent architecture: An example of requirements-driven agent-based system design
-
H.V.D. Parunak, A.D. Baker, S.J. Clark, The AARIA agent architecture: an example of requirements-driven agent-based system design, in: Proc. 1st International Conference on Autonomous Agents, 1997, 482-483.
-
(1997)
Proc. 1st International Conference on Autonomous Agents
, pp. 482-483
-
-
Parunak, H.V.D.1
Baker, A.D.2
Clark, S.J.3
-
34
-
-
0242480387
-
-
The Report of HMS Consortium
-
D. Seidel, M. Hopf, J.M. Prado, E. Garcia-Herreros, T.D. Strasser, J.H. Christensen, J.M. Oblak, HMS - Strategies, Vol. 0, The Report of HMS Consortium, 1994.
-
(1994)
HMS - Strategies
-
-
Seidel, D.1
Hopf, M.2
Prado, J.M.3
Garcia-Herreros, E.4
Strasser, T.D.5
Christensen, J.H.6
Oblak, J.M.7
-
35
-
-
0023830408
-
Dynamic scheduling in cellular manufacturing systems: A framework for networked decision making
-
M.J. Shaw, Dynamic scheduling in cellular manufacturing systems: a framework for networked decision making, Journal of Manufacturing Systems 7 (2) (1988) 83-94.
-
(1988)
Journal of Manufacturing Systems
, vol.7
, Issue.2
, pp. 83-94
-
-
Shaw, M.J.1
-
36
-
-
0019180974
-
The contract net protocol: High-level communication and control in a distributed problem solver
-
R.G. Smith, The contract net protocol: high-level communication and control in a distributed problem solver, IEEE Trans. Computer 29 (12) (1980) 1104-1113.
-
(1980)
IEEE Trans. Computer
, vol.29
, Issue.12
, pp. 1104-1113
-
-
Smith, R.G.1
-
37
-
-
85033926317
-
-
Techno Japan, No. 10
-
H. Suda, Future Factory System Formulated in Japan, Techno Japan, Part 1: Vol. 22, No. 10, 15-25; Part 2: Vol. 23, No. 3, 1989 and 1990, 51-61.
-
Future Factory System Formulated in Japan
, vol.22
, Issue.1 PART
, pp. 15-25
-
-
Suda, H.1
-
38
-
-
0346520391
-
-
No. 3
-
H. Suda, Future Factory System Formulated in Japan, Techno Japan, Part 1: Vol. 22, No. 10, 15-25; Part 2: Vol. 23, No. 3, 1989 and 1990, 51-61.
-
(1989)
Future Factory System Formulated in Japan
, vol.23
, Issue.2 PART
, pp. 51-61
-
-
-
40
-
-
84904295520
-
Comparison of the bionic, fractal and holonic manufacturing system concepts
-
A. Tharumarajah, A.J. Wells, L. Nemes, Comparison of the bionic, fractal and holonic manufacturing system concepts, International Journal of Computer Integrated Manufacturing 9 (3) (1996) 217-226.
-
(1996)
International Journal of Computer Integrated Manufacturing
, vol.9
, Issue.3
, pp. 217-226
-
-
Tharumarajah, A.1
Wells, A.J.2
Nemes, L.3
-
41
-
-
0347780799
-
IMS test case 5, holonic manufacturing systems
-
appear
-
P. Valckenaers, H. Van Brussel, L. Bongaerts, J. Wyns, IMS test case 5, holonic manufacturing systems, to appear in Journal of Integrated Computer-Aided Engineering 4 (3) (1997) 123.
-
(1997)
Journal of Integrated Computer-Aided Engineering
, vol.4
, Issue.3
, pp. 123
-
-
Valckenaers, P.1
Van Brussel, H.2
Bongaerts, L.3
Wyns, J.4
-
43
-
-
0031121735
-
An Optimization-Based Algorithm for Job Shop Scheduling, SADHANA
-
April
-
J. Wang, P.B. Luh, X. Zhao, J. Wang, An Optimization-Based Algorithm for Job Shop Scheduling, SADHANA, a Journal of Indian Academy of Sciences, a Special Issue on Competitive Manufacturing Systems, Vol. 22, Part 2, April 1997, pp. 241-256.
-
(1997)
Journal of Indian Academy of Sciences, a Special Issue on Competitive Manufacturing Systems
, vol.22
, Issue.2 PART
, pp. 241-256
-
-
Wang, J.1
Luh, P.B.2
Zhao, X.3
Wang, J.4
|