-
1
-
-
0031189107
-
Rescheduling job shops under disruptions
-
ABUMAIZAR, R. J., and SVESTKA, J. A., 1997, Rescheduling job shops under disruptions. International Journal of Production Research, 35, 2065-2082.
-
(1997)
International Journal of Production Research
, vol.35
, pp. 2065-2082
-
-
Abumaizar, R.J.1
Svestka, J.A.2
-
2
-
-
0000522889
-
Analysis of periodic and event-driven rescheduling policies in dynamic shops
-
CHURCH, L. K., and UZSOY, R., 1992, Analysis of periodic and event-driven rescheduling policies in dynamic shops. International Journal of Computer Integrated Manufacturing, 5, 153-163.
-
(1992)
International Journal of Computer Integrated Manufacturing
, vol.5
, pp. 153-163
-
-
Church, L.K.1
Uzsoy, R.2
-
3
-
-
0002310295
-
Real-time operations scheduling for flexible manufacturing systems
-
DHINGRA, J. S., MUSSER, K. L., and BLANKENSHIP, G. L., 1992, Real-time operations scheduling for flexible manufacturing systems. Proceeding of the 1992 Winter Simulation Conference, pp. 849-855.
-
(1992)
Proceeding of the 1992 Winter Simulation Conference
, pp. 849-855
-
-
Dhingra, J.S.1
Musser, K.L.2
Blankenship, G.L.3
-
4
-
-
0030676526
-
A rolling horizon job shop rescheduling strategy in the dynamic environment
-
FANG, J., and Xi, Y., 1997, A rolling horizon job shop rescheduling strategy in the dynamic environment. The International Journal of Advanced Manufacturing Technology, 13, 227-232.
-
(1997)
The International Journal of Advanced Manufacturing Technology
, vol.13
, pp. 227-232
-
-
Fang, J.1
Xi, Y.2
-
5
-
-
0030786875
-
Production scheduling/rescheduling in flexible manufacturing
-
JAIN, A. K., and ELMARAGHY, H. A., 1997, Production scheduling/rescheduling in flexible manufacturing. International Journal of Production Research, 35, 281-309.
-
(1997)
International Journal of Production Research
, vol.35
, pp. 281-309
-
-
Jain, A.K.1
Elmaraghy, H.A.2
-
6
-
-
0028594405
-
Simulation-based real-time scheduling in a flexible manufacturing system
-
KIM, M. H., and KIM, Y.-D., 1994, Simulation-based real-time scheduling in a flexible manufacturing system. Journal of Manufacturing Systems, 13, 85-93.
-
(1994)
Journal of Manufacturing Systems
, vol.13
, pp. 85-93
-
-
Kim, M.H.1
Kim, Y.-D.2
-
7
-
-
0027641665
-
A heuristic rescheduling algorithm for computer-based production scheduling systems
-
LI, R.-K., SHYU, Y.-T., and ADIGA, S., 1993, A heuristic rescheduling algorithm for computer-based production scheduling systems. International Journal of Production Research, 31, 1815-1826.
-
(1993)
International Journal of Production Research
, vol.31
, pp. 1815-1826
-
-
Li, R.-K.1
Shyu, Y.-T.2
Adiga, S.3
-
8
-
-
0032097829
-
Predictable scheduling of a job shop subject to breakdowns
-
MEHTA, S. V., and UZSOY, R. M., 1998, Predictable scheduling of a job shop subject to breakdowns. IEEE Transactions on Robotics and Automation, 14, 365-378.
-
(1998)
IEEE Transactions on Robotics and Automation
, vol.14
, pp. 365-378
-
-
Mehta, S.V.1
Uzsoy, R.M.2
-
9
-
-
0027224847
-
One-machine rescheduling heuristics with efficiency and stability as criteria
-
WU, S. D., STORER, R. H., and CHANG, P. -C., 1993, One-machine rescheduling heuristics with efficiency and stability as criteria. Computers & Operations Research, 20, 1-14.
-
(1993)
Computers & Operations Research
, vol.20
, pp. 1-14
-
-
Wu, S.D.1
Storer, R.H.2
Chang, P.C.3
-
10
-
-
0027700624
-
Scheduling and rescheduling with iterative repair
-
ZWEBEN, M., DAVIS, E., DAUN, B., and DEALE, M. J., 1993, Scheduling and rescheduling with iterative repair. IEEE Transactions on Systems, Man, and Cybernetics, 23, 1588-1596.
-
(1993)
IEEE Transactions on Systems, Man, and Cybernetics
, vol.23
, pp. 1588-1596
-
-
Zweben, M.1
Davis, E.2
Daun, B.3
Deale, M.J.4
|