메뉴 건너뛰기




Volumn 12, Issue 1, 2001, Pages 58-68

Survey of resource allocation methods for distributed manufacturing systems

Author keywords

Distributed manufacturing; Resource allocation; Scheduling

Indexed keywords

ALGORITHMS; PROBLEM SOLVING; PRODUCTION ENGINEERING; SCHEDULING;

EID: 0035241047     PISSN: 09537287     EISSN: None     Source Type: Journal    
DOI: 10.1080/09537280150203988     Document Type: Review
Times cited : (39)

References (45)
  • 2
    • 0031246746 scopus 로고    scopus 로고
    • Distributed bottleneck control for repetitive production systems
    • Banaszak, Z., 1997, Distributed bottleneck control for repetitive production systems, Journal of Intelligent Manufacturing, 8, 415-424.
    • (1997) Journal of Intelligent Manufacturing , vol.8 , pp. 415-424
    • Banaszak, Z.1
  • 3
    • 0011747423 scopus 로고
    • A distributed asynchronous system for predictive and reactive scheduling
    • Dept. of Computer Science, University of Strathclyde, Glasgow, UK
    • Burke, P., and Prosser, P., 1989, A distributed asynchronous system for predictive and reactive scheduling. Technical Report AISL-42-89, Dept. of Computer Science, University of Strathclyde, Glasgow, UK.
    • (1989) Technical Report AISL-42-89
    • Burke, P.1    Prosser, P.2
  • 4
    • 0018507737 scopus 로고
    • Less nervous MRP systems: A dynamic economic lot-sizing approach
    • Carlson, R.C., Jucker, J.V., and Kropp, D.H., 1979, Less nervous MRP systems: a dynamic economic lot-sizing approach. Management Science, 25, 755-761.
    • (1979) Management Science , vol.25 , pp. 755-761
    • Carlson, R.C.1    Jucker, J.V.2    Kropp, D.H.3
  • 5
    • 0011715680 scopus 로고
    • Autonomous material handling in computer integrated manufacture
    • A. Kusiak (ed.) (Amsterdam: Elsevier Science B.V.)
    • Cassandras, G., 1986, Autonomous material handling in computer integrated manufacture. In A. Kusiak (ed.) Modelling and Design of Flexible Manufacturing Systems (Amsterdam: Elsevier Science B.V.), pp. 81-98.
    • (1986) Modelling and Design of Flexible Manufacturing Systems , pp. 81-98
    • Cassandras, G.1
  • 6
    • 0029404744 scopus 로고    scopus 로고
    • A learning-based methodology for dynamic scheduling in distributed manufacturing systems
    • Chiu, C., and Yih, Ys., 1996, A learning-based methodology for dynamic scheduling in distributed manufacturing systems. International Journal of Production Research, 33, 3217-3232.
    • (1996) International Journal of Production Research , vol.33 , pp. 3217-3232
    • Chiu, C.1    Yih, Ys.2
  • 8
    • 0024717551 scopus 로고
    • Evolving coordination schemes in real-time production scheduling
    • Davis, W.J., 1989, Evolving coordination schemes in real-time production scheduling. Engineering Costs and Production Economics, 17, 111-124.
    • (1989) Engineering Costs and Production Economics , vol.17 , pp. 111-124
    • Davis, W.J.1
  • 10
    • 44949284972 scopus 로고
    • The evolution of control architectures for automated manufacturing systems
    • Dilts, N.P., Boyd, N.P., and Whorms, H.H., 1991, The evolution of control architectures for automated manufacturing systems, Journal of Manufacturing Systems, 10, 79-93.
    • (1991) Journal of Manufacturing Systems , vol.10 , pp. 79-93
    • Dilts, N.P.1    Boyd, N.P.2    Whorms, H.H.3
  • 13
    • 0011781937 scopus 로고
    • An architecture for real-time distributed scheduling
    • Hadavi, K., Wen-King, H., Tony, C. and Cheoung-Nam, L., 1992, An architecture for real-time distributed scheduling. AI Magazine, Fall, 46-56.
    • (1992) AI Magazine , vol.FALL , pp. 46-56
    • Hadavi, K.1    Wen-Ling, H.2    Tony, C.3    Cheoung-Nam, L.4
  • 14
    • 0011744748 scopus 로고
    • The monitor in production activity control systems
    • Higgins, P., and Browne, J., 1990, The monitor in production activity control systems. Production Planning & Control, 1, 17-26.
    • (1990) Production Planning & Control , vol.1 , pp. 17-26
    • Higgins, P.1    Browne, J.2
  • 16
    • 0032050336 scopus 로고    scopus 로고
    • CAMPS: A constraint-based architecture for multi-agent planning and scheduling
    • Kazuo, M., 1998, CAMPS: a constraint-based architecture for multi-agent planning and scheduling. Journal of Intelligent Manufacturing, 9, 147-154.
    • (1998) Journal of Intelligent Manufacturing , vol.9 , pp. 147-154
    • Kazuo, M.1
  • 17
    • 0032046606 scopus 로고
    • Distributed computing approaches toward manufacturing scheduling problems
    • Keyser, T.K., and Davis, R.P., 1988, Distributed computing approaches toward manufacturing scheduling problems. IIE Transactions, 30, 379-390.
    • (1988) IIE Transactions , vol.30 , pp. 379-390
    • Keyser, T.K.1    Davis, R.P.2
  • 20
    • 0000420958 scopus 로고
    • Intelligent agent systems for manufacturing applications
    • Kwok, A., and Norrie, D., 1993, Intelligent agent systems for manufacturing applications. Journal of Intelligent Manufacturing, 4, 285-293.
    • (1993) Journal of Intelligent Manufacturing , vol.4 , pp. 285-293
    • Kwok, A.1    Norrie, D.2
  • 26
    • 0026986735 scopus 로고
    • Production scheduling in autonomous distributed manufacturing system
    • Quality Assurance Through Integration of Manufacturing Processes and Systems
    • Moriwaki, T., Sugimura, N., Martawirya, Y.Y., and Wirjomartono, S.H., 1992, Production scheduling in autonomous distributed manufacturing system. Quality Assurance Through Integration of Manufacturing Processes and Systems, ASME, 56, 175-186.
    • (1992) ASME , vol.56 , pp. 175-186
    • Moriwaki, T.1    Sugimura, N.2    Martawirya, Y.Y.3    Wirjomartono, S.H.4
  • 27
    • 0023399098 scopus 로고    scopus 로고
    • Issues in intelligent cell control for flexible manufacturing systems
    • O'Grady, P.J., Bao, H., and Lee, K.H., 1997, Issues in intelligent cell control for flexible manufacturing systems. Computers in Industry, 9, 25-36.
    • (1997) Computers in Industry , vol.9 , pp. 25-36
    • O'Grady, P.J.1    Bao, H.2    Lee, K.H.3
  • 28
    • 0003136655 scopus 로고
    • A cooperative scheduling system
    • M.D. Oliff (ed.) (Amsterdam: Elsevier Science)
    • Ow, P.S., Smith, S.F., and Howie, R., 1988, A cooperative scheduling system. In M.D. Oliff (ed.) Expert Systems and Intelligent Manufacturing (Amsterdam: Elsevier Science), pp. 43-56.
    • (1988) Expert Systems and Intelligent Manufacturing , pp. 43-56
    • Ow, P.S.1    Smith, S.F.2    Howie, R.3
  • 31
    • 0026912423 scopus 로고
    • A constraint maintenance system for the distributed resource allocation problem
    • Prosser, P., Conway, C., and Muller, C., 1992, A constraint maintenance system for the distributed resource allocation problem. Intelligent Systems Engineering, Autumn, 76-83.
    • (1992) Intelligent Systems Engineering , vol.AUTUMN , pp. 76-83
    • Prosser, P.1    Conway, C.2    Muller, C.3
  • 32
    • 0001855846 scopus 로고
    • Communication perspectives in negotiations
    • L.L. Putnam and M.E. Roloff (eds) (Sage Publications)
    • Putnam, L.L., and Roloff, M.E., 1992, Communication perspectives in negotiations. In L.L. Putnam and M.E. Roloff (eds) Communication and Negotiation (Sage Publications), pp. 1-17.
    • (1992) Communication and Negotiation , pp. 1-17
    • Putnam, L.L.1    Roloff, M.E.2
  • 33
    • 0011743939 scopus 로고
    • IMS-holonic manufacturing systems: Glossary of terms
    • IFW, University of Hannover
    • Seidel, D., and Mey, M. (eds), 1994, IMS-holonic manufacturing systems: glossary of terms. IMS-Holonic Manufacturing Systems: Strategies (IFW, University of Hannover) 1.
    • (1994) IMS-Holonic Manufacturing Systems: Strategies , pp. 1
    • Seidel, D.1    Mey, M.2
  • 34
    • 0023294953 scopus 로고
    • Distributed planning in cellular flexible manufacturing systems
    • Shaw, M.J., 1987, Distributed planning in cellular flexible manufacturing systems. INFOR, 25, 13-25.
    • (1987) INFOR , vol.25 , pp. 13-25
    • Shaw, M.J.1
  • 36
    • 0032045595 scopus 로고    scopus 로고
    • A dynamic scheduling holon for manufacturing orders
    • Sousa, P., and Ramos, C., 1998, A dynamic scheduling holon for manufacturing orders. Journal of Intelligent Manufacturing, 9, 107-112.
    • (1998) Journal of Intelligent Manufacturing , vol.9 , pp. 107-112
    • Sousa, P.1    Ramos, C.2
  • 37
    • 0026103848 scopus 로고
    • Resource allocation in distributed factory scheduling
    • Sycara, K.P., Roth, S.F., Sadeh, N., and Fox, M.S., 1991, Resource allocation in distributed factory scheduling. IEEE Expert, Feb., 29-40.
    • (1991) IEEE Expert , vol.FEB. , pp. 29-40
    • Sycara, K.P.1    Roth, S.F.2    Sadeh, N.3    Fox, M.S.4
  • 39
    • 0030721152 scopus 로고    scopus 로고
    • A behaviour-based approach to scheduling in distributed manufacturing systems
    • Tharumarajah, A., and Wells, A.J., 1997, A behaviour-based approach to scheduling in distributed manufacturing systems. Journal of Computer-Aided Engineering, 4, 235-249.
    • (1997) Journal of Computer-Aided Engineering , vol.4 , pp. 235-249
    • Tharumarajah, A.1    Wells, A.J.2
  • 43
    • 0031122139 scopus 로고    scopus 로고
    • Performance analysis of auction-based distributed shop floor control schemes from the perspective of the communication system
    • Veeramani, Dh., and Wang, K.-J., 1997, Performance analysis of auction-based distributed shop floor control schemes from the perspective of the communication system. International Journal of Flexible Manufacturing Systems, 9, 121-143.
    • (1997) International Journal of Flexible Manufacturing Systems , vol.9 , pp. 121-143
    • Veeramani, Dh.1    Wang, K.-J.2
  • 44
    • 0001125703 scopus 로고
    • Hierarchical architectures for production planning and control
    • A. Archetti, M. Lucertini and P. Serafini (eds) (Springer)
    • Villa, A., 1989, Hierarchical architectures for production planning and control. In A. Archetti, M. Lucertini and P. Serafini (eds) Operations Research Models in Flexible Manufacturing Systems (Springer), pp. 261-287.
    • (1989) Operations Research Models in Flexible Manufacturing Systems , pp. 261-287
    • Villa, A.1
  • 45
    • 0027814220 scopus 로고
    • Accommodation of priority parts in a distributed computer-controlled manufacturing system with aggregate bidding schemes
    • Yang, E.H., Barash, M.M., and Upton, D.M., 1993, Accommodation of priority parts in a distributed computer-controlled manufacturing system with aggregate bidding schemes. In Proceedings of the 2nd Industrial Engineering Research Conference, pp. 827-831.
    • (1993) Proceedings of the 2nd Industrial Engineering Research Conference , pp. 827-831
    • Yang, E.H.1    Barash, M.M.2    Upton, D.M.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.