메뉴 건너뛰기




Volumn 14, Issue 5, 2003, Pages 457-470

A multi-agent architecture for dynamic scheduling of steel hot rolling

Author keywords

Dynamic scheduling; Multi agents; Rescheduling; Schedule repair; Steel production

Indexed keywords

COMPUTER ARCHITECTURE; COMPUTER INTEGRATED MANUFACTURING; COMPUTER SIMULATION; HEURISTIC METHODS; HOT ROLLING; MULTI AGENT SYSTEMS; REAL TIME SYSTEMS; REPAIR; ROBUSTNESS (CONTROL SYSTEMS); SCHEDULING; SYSTEM STABILITY;

EID: 0141919583     PISSN: 09565515     EISSN: None     Source Type: Journal    
DOI: 10.1023/A:1025701325275     Document Type: Review
Times cited : (88)

References (35)
  • 3
    • 0032345070 scopus 로고    scopus 로고
    • Modelling rolling batch planning as vehicle routing problem with time window
    • Chen, X., Wan, W. and Xu, X. (1998) Modelling rolling batch planning as vehicle routing problem with time window. Computers Operations Research, 25(12), 1127-1136.
    • (1998) Computers Operations Research , vol.25 , Issue.12 , pp. 1127-1136
    • Chen, X.1    Wan, W.2    Xu, X.3
  • 4
    • 0043271409 scopus 로고
    • Optimisation in steel rolling
    • John Wiley & Sons, Chichester, England
    • Cowling, P. I. (1995) Optimisation in steel rolling. Optimization in Industry, John Wiley & Sons, Chichester, England.
    • (1995) Optimization in Industry
    • Cowling, P.I.1
  • 5
    • 0036604832 scopus 로고    scopus 로고
    • Using real-time information for effective dynamic scheduling
    • Cowling, P. I. and Johansson, M. (2001) Using real-time information for effective dynamic scheduling. European Journal of Operational Research, 139(2), 230-244.
    • (2001) European Journal of Operational Research , vol.139 , Issue.2 , pp. 230-244
    • Cowling, P.I.1    Johansson, M.2
  • 8
    • 0001110087 scopus 로고    scopus 로고
    • Integration of continuous caster and hot strip mill planning for steel production
    • Cowling, P. I. and Rezig, W. (2000) Integration of continuous caster and hot strip mill planning for steel production. Journal of Scheduling, 3(4), 185-208.
    • (2000) Journal of Scheduling , vol.3 , Issue.4 , pp. 185-208
    • Cowling, P.I.1    Rezig, W.2
  • 9
    • 0009707516 scopus 로고
    • Reactive scheduling improving the robustness of schedules and restricting the effects of shop floor disturbances by fuzzy reasoning
    • Dorn, J. (1995) Reactive scheduling improving the robustness of schedules and restricting the effects of shop floor disturbances by fuzzy reasoning. International Journal of Human Computer Studies, 42, 687-704.
    • (1995) International Journal of Human Computer Studies , vol.42 , pp. 687-704
    • Dorn, J.1
  • 10
    • 0004215426 scopus 로고    scopus 로고
    • Fred Glover, Manuel Laguna, Kluwer Academic Publishers, Boston
    • Glover, F. (1997) Tabu Search, Fred Glover, Manuel Laguna, Kluwer Academic Publishers, Boston.
    • (1997) Tabu Search
    • Glover, F.1
  • 12
    • 84950937653 scopus 로고
    • Integrated shop floor control using autonomous agents
    • Lin, G. Y.-J. and Solberg, J. J. (1990) Integrated shop floor control using autonomous agents. IIE Transactions, 24(3), 57-71.
    • (1990) IIE Transactions , vol.24 , Issue.3 , pp. 57-71
    • Lin, G.Y.-J.1    Solberg, J.J.2
  • 13
    • 0032049311 scopus 로고    scopus 로고
    • The hot strip Mill production scheduling problem: A tabu search approach
    • Lopez, L., Carter, M. W. and Gendreau, M. (1998) The hot strip Mill production scheduling problem: a tabu search approach. European Journal of Operational Research, 106(2-3), 317-335.
    • (1998) European Journal of Operational Research , vol.106 , Issue.2-3 , pp. 317-335
    • Lopez, L.1    Carter, M.W.2    Gendreau, M.3
  • 14
    • 0030216517 scopus 로고    scopus 로고
    • Multi-agent mediator architecture for distributed manufacturing
    • Maturana, F. and Norrie, D. (1996) Multi-agent mediator architecture for distributed manufacturing. Journal of Intelligent Manufacturing, 7, 257-270.
    • (1996) Journal of Intelligent Manufacturing , vol.7 , pp. 257-270
    • Maturana, F.1    Norrie, D.2
  • 15
    • 0011586319 scopus 로고
    • Development of cooperative scheduling system for the steel-making process
    • Morgan Kaufman
    • Numao, M. (1994) Development of cooperative scheduling system for the steel-making process, Intelligent Scheduling, Morgan Kaufman, pp. 607-628.
    • (1994) Intelligent Scheduling , pp. 607-628
    • Numao, M.1
  • 19
    • 0028585426 scopus 로고
    • Exploiting shop floor status information to schedule complex job shops
    • Ovacik, I. M. and Uzsoy, R. (1994) Exploiting shop floor status information to schedule complex job shops. Journal of Manufacturing Systems, 13(2), 73-84.
    • (1994) Journal of Manufacturing Systems , vol.13 , Issue.2 , pp. 73-84
    • Ovacik, I.M.1    Uzsoy, R.2
  • 22
    • 29444438437 scopus 로고
    • Dynamic job shop scheduling: A survey of simulation research
    • Ramasesh, R. (1990) Dynamic job shop scheduling: a survey of simulation research. Omega International Journal of Management Science, 18(1), 43-57.
    • (1990) Omega International Journal of Management Science , vol.18 , Issue.1 , pp. 43-57
    • Ramasesh, R.1
  • 23
    • 0032624359 scopus 로고    scopus 로고
    • A distributed architecture and negotiation protocol for scheduling in manufacturing systems
    • Ramos, C. and Sousa, P. (1999) A distributed architecture and negotiation protocol for scheduling in manufacturing systems. Computers in Industry, 38(2), 103-113.
    • (1999) Computers in Industry , vol.38 , Issue.2 , pp. 103-113
    • Ramos, C.1    Sousa, P.2
  • 24
    • 0034204917 scopus 로고    scopus 로고
    • Automated contracting in distributed manufacturing among independent companies
    • Sandholm, T. W. (2000) Automated contracting in distributed manufacturing among independent companies. Journal of Intelligent Manufacturing, 11(3), 271-283.
    • (2000) Journal of Intelligent Manufacturing , vol.11 , Issue.3 , pp. 271-283
    • Sandholm, T.W.1
  • 25
    • 0033355662 scopus 로고    scopus 로고
    • Workshop on scheduling using practical inaccurate date-Part2: An investigation of the robustness of scheduling rules in a dynamic and stochastic environment
    • Shafai, R. and Bruno, P. (1999) Workshop on scheduling using practical inaccurate date-Part2: An investigation of the robustness of scheduling rules in a dynamic and stochastic environment. International Journal of Production Research, 37, 4105-4117.
    • (1999) International Journal of Production Research , vol.37 , pp. 4105-4117
    • Shafai, R.1    Bruno, P.2
  • 26
    • 0034205722 scopus 로고    scopus 로고
    • Metaphor II: An agent-based architecture for distributed intelligent design and manufacturing
    • Shen, W., Maturana, F. and Norrie, D. H. (2000) Metaphor II: An agent-based architecture for distributed intelligent design and manufacturing. Journal of Intelligent Manufacturing, 11(3), 237-251.
    • (2000) Journal of Intelligent Manufacturing , vol.11 , Issue.3 , pp. 237-251
    • Shen, W.1    Maturana, F.2    Norrie, D.H.3
  • 27
    • 85133749042 scopus 로고    scopus 로고
    • Agent based systems for intelligent manufacturing: A state of the art survey
    • Shen, W. and Norrie, D. H. (1999) Agent based systems for intelligent manufacturing: a state of the art survey. International Journal of Knowledge and Information Systems, 1(2), 129-156.
    • (1999) International Journal of Knowledge and Information Systems , vol.1 , Issue.2 , pp. 129-156
    • Shen, W.1    Norrie, D.H.2
  • 29
    • 0019180974 scopus 로고
    • The contract net protocol: High-level communication and control in a distributed problem solver
    • Smith, R. G. (1980) The contract net protocol: high-level communication and control in a distributed problem solver. IEEE Transactions on Computers, 29(12), 1104-1113.
    • (1980) IEEE Transactions on Computers , vol.29 , Issue.12 , pp. 1104-1113
    • Smith, R.G.1
  • 32
    • 0033741404 scopus 로고    scopus 로고
    • A multiple travelling salesman problem (MTSP) model for hot rolling scheduling in Baoshan Iron & Steel Complex
    • Tang, L., Liu, J., Rong, A. and Yang, Z. (2000) A multiple travelling salesman problem (MTSP) model for hot rolling scheduling in Baoshan Iron & Steel Complex. European Journal of Operational Research, 124(2), 267-282.
    • (2000) European Journal of Operational Research , vol.124 , Issue.2 , pp. 267-282
    • Tang, L.1    Liu, J.2    Rong, A.3    Yang, Z.4
  • 33
    • 0035899628 scopus 로고    scopus 로고
    • A review of planning and scheduling systems and methods for integrated steel production
    • Tang, L., Liu, J., Rong, A. and Yang, Z. (2001) A review of planning and scheduling systems and methods for integrated steel production. European Journal of Operational Research, 133(1), 1-20.
    • (2001) European Journal of Operational Research , vol.133 , Issue.1 , pp. 1-20
    • Tang, L.1    Liu, J.2    Rong, A.3    Yang, Z.4
  • 34
    • 0027224847 scopus 로고
    • One machine rescheduling heuristics with efficiency and stability as criteria
    • Wu, S. D., Storer, R. H. and Chang, P. (1993) One machine rescheduling heuristics with efficiency and stability as criteria. Computers & Operations Research, 20(1), 1-14.
    • (1993) Computers & Operations Research , vol.20 , Issue.1 , pp. 1-14
    • Wu, S.D.1    Storer, R.H.2    Chang, P.3
  • 35
    • 0022097890 scopus 로고
    • Scheduling/rescheduling in the manufacturing operating system environment
    • Yamamolto, M. and Nof, S. Y. (1985) Scheduling/rescheduling in the manufacturing operating system environment. International Journal of Production Research, 23(4), 705-722.
    • (1985) International Journal of Production Research , vol.23 , Issue.4 , pp. 705-722
    • Yamamolto, M.1    Nof, S.Y.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.