-
1
-
-
84876823885
-
State of the Art in Construction Simulation
-
ed. J. J. Swain, D. Goldsman, R. C. Crain, and J. R. Wilson, Piscataway, New Jersey: Institute of Electrical and Electronics Engineers
-
Abourizk, S. M., D. W. Halpin, and J. D. Lutz. 1992. State of the Art in Construction Simulation. In Proceedings of the 1992 Winter Simulation Conference, ed. J. J. Swain, D. Goldsman, R. C. Crain, and J. R. Wilson, 1271-1277. Piscataway, New Jersey: Institute of Electrical and Electronics Engineers.
-
(1992)
Proceedings of the 1992 Winter Simulation Conference
, pp. 1271-1277
-
-
Abourizk, S.M.1
Halpin, D.W.2
Lutz, J.D.3
-
2
-
-
0032104987
-
A Framework for Applying Simulation in the Construction Industry
-
AbouRizk, S. M., and D. Hajjar. 1998. A Framework for Applying Simulation in the Construction Industry. Canadian Journal of Civil Engineering, 25(3), 604-617.
-
(1998)
Canadian Journal of Civil Engineering
, vol.25
, Issue.3
, pp. 604-617
-
-
AbouRizk, S.M.1
Hajjar, D.2
-
3
-
-
0034430715
-
Simphony-An Integrated Environment for Construction Simulation
-
ed. J. A. Joines, R. R. Barton, K. Kang, and P. A. Fishwick, Piscataway, New Jersey: Institute of Electrical and Electronics Engineers. 2000
-
AbouRizk, S. M. and Y. Mohammad. 2000. Simphony-An Integrated Environment for Construction Simulation. In Proceedings of the 2000 Winter Simulation Conference, ed. J. A. Joines, R. R. Barton, K. Kang, and P. A. Fishwick, 1907-1914. Piscataway, New Jersey: Institute of Electrical and Electronics Engineers.
-
(1907)
Proceedings of the 2000 Winter Simulation Conference
-
-
AbouRizk, S.M.1
Mohammad, Y.2
-
4
-
-
46149084399
-
-
ACIMS. 2005. DEVSJAVA [online]. Available via 〈www.acims.arizona. edu/SOFTWARE/software.shtml.〉 [accessed March 31, 2006].
-
ACIMS. 2005. DEVSJAVA [online]. Available via 〈www.acims.arizona. edu/SOFTWARE/software.shtml.〉 [accessed March 31, 2006].
-
-
-
-
5
-
-
11644288742
-
Shielding Production: Essential Step in Production Control
-
Ballard, G. and G. Howell. 1998. Shielding Production: Essential Step in Production Control. Journal of Construction Engineering and Management, ASCE, 124(1), 11-17.
-
(1998)
Journal of Construction Engineering and Management, ASCE
, vol.124
, Issue.1
, pp. 11-17
-
-
Ballard, G.1
Howell, G.2
-
6
-
-
13944266838
-
Improving Work Flow Reliability
-
IGLC-7, Berkeley, California, USA, 26-28 July
-
Ballard, G. 1999. Improving Work Flow Reliability. 7th Annual Conference of the International Group for Lean Construction (IGLC-7), Berkeley, California, USA, 26-28 July 1999.
-
(1999)
7th Annual Conference of the International Group for Lean Construction
-
-
Ballard, G.1
-
7
-
-
1642563359
-
Implications of Even Flow Production Methodology for the U.S. Housing Industry
-
Bashford, H. H., A. Sawhney, K. D. Walsh, and K. Kot. 2003. Implications of Even Flow Production Methodology for the U.S. Housing Industry. Journal of Construction Engineering and Management, ASCE, 129(3), 330-337.
-
(2003)
Journal of Construction Engineering and Management, ASCE
, vol.129
, Issue.3
, pp. 330-337
-
-
Bashford, H.H.1
Sawhney, A.2
Walsh, K.D.3
Kot, K.4
-
8
-
-
0006238013
-
RESQUE: A Resource Oriented Simulation System for Multiple Resource Constrained Processes
-
Milwaukee, Wisconsin
-
Chang, D. Y. and R. I. Carr. 1987. RESQUE: A Resource Oriented Simulation System for Multiple Resource Constrained Processes. Proceedings of the PMI Seminar/Symposium, Milwaukee, Wisconsin, 4-19.
-
(1987)
Proceedings of the PMI Seminar/Symposium
, pp. 4-19
-
-
Chang, D.Y.1
Carr, R.I.2
-
9
-
-
0030157058
-
Parallel DEVS: A Parallel, Hierarchical, Modular Modeling Formalism and Its Distributed Simulator
-
Chow, A. 1996. Parallel DEVS: A Parallel, Hierarchical, Modular Modeling Formalism and Its Distributed Simulator. SCS Transactions on Simulation, 13(2), 55-102.
-
(1996)
SCS Transactions on Simulation
, vol.13
, Issue.2
, pp. 55-102
-
-
Chow, A.1
-
10
-
-
46149122498
-
-
City of Peoria. 2004. Record of Inspections Completed from October 2003 to September 2004. Peoria, Arizona.
-
City of Peoria. 2004. Record of Inspections Completed from October 2003 to September 2004. Peoria, Arizona.
-
-
-
-
11
-
-
0034227963
-
Application Framework for Development of Simulation Tools
-
Hajjar, D. and S. M. AbouRizk. 2000. Application Framework for Development of Simulation Tools. Journal of Computing in Civil Engineering, ASCE, 14(3), 160-167.
-
(2000)
Journal of Computing in Civil Engineering, ASCE
, vol.14
, Issue.3
, pp. 160-167
-
-
Hajjar, D.1
AbouRizk, S.M.2
-
12
-
-
0041304359
-
Unified Modeling Methodology for Construction Simulation
-
Hajjar, D. and S. M. AbouRizk. 2002. Unified Modeling Methodology for Construction Simulation. Journal of Construction Engineering and Management, ASCE, 128(2), 174-185.
-
(2002)
Journal of Construction Engineering and Management, ASCE
, vol.128
, Issue.2
, pp. 174-185
-
-
Hajjar, D.1
AbouRizk, S.M.2
-
13
-
-
0017539255
-
CYCLONE: Method for Modeling of Job Site Processes
-
Halpin, D. W. 1977. CYCLONE: Method for Modeling of Job Site Processes. Journal of the Construction Division, ASCE, 103(3), 489-499.
-
(1977)
Journal of the Construction Division, ASCE
, vol.103
, Issue.3
, pp. 489-499
-
-
Halpin, D.W.1
-
15
-
-
19944396294
-
UM-CYCLONE Discrete Event Simulation System User's Guide
-
Technical Report, UMCE-89-12, Dept. of Civil and Environmental Engineering, University of Michigan, Ann Arbor, Michigan
-
Ioannou, P. G. 1990. UM-CYCLONE Discrete Event Simulation System User's Guide. Technical Report, UMCE-89-12, Dept. of Civil and Environmental Engineering, University of Michigan, Ann Arbor, Michigan.
-
(1990)
-
-
Ioannou, P.G.1
-
17
-
-
0020101864
-
Construction Operation and Microcomputers
-
Lluch, J. F. and D. W. Halpin. 1982. Construction Operation and Microcomputers. Journal of the Construction Division, ASCE, 108(1), 129-145.
-
(1982)
Journal of the Construction Division, ASCE
, vol.108
, Issue.1
, pp. 129-145
-
-
Lluch, J.F.1
Halpin, D.W.2
-
18
-
-
0028741632
-
General Purpose Simulation using Stroboscope
-
ed. J. D. Tew, S. Manivannan, D.A. Sadowski, and A.F. Seila, Piscataway, New Jersey: Institute of Electrical and Electronics Engineers
-
Martinez, J.C and P.G. Ioannou. 1994. General Purpose Simulation using Stroboscope. Proceedings of the 1994 Winter Simulation Conference, ed. J. D. Tew, S. Manivannan, D.A. Sadowski, and A.F. Seila, 1159-1166. Piscataway, New Jersey: Institute of Electrical and Electronics Engineers.
-
(1994)
Proceedings of the 1994 Winter Simulation Conference
, pp. 1159-1166
-
-
Martinez, J.C.1
Ioannou, P.G.2
-
19
-
-
0032677122
-
General Purpose Systems for Effective Construction Simulation
-
Martinez, J. C. and P. G. Ioannou. 1999. General Purpose Systems for Effective Construction Simulation. Journal of Construction Engineering and Management, ASCE, 125(4), 265-276.
-
(1999)
Journal of Construction Engineering and Management, ASCE
, vol.125
, Issue.4
, pp. 265-276
-
-
Martinez, J.C.1
Ioannou, P.G.2
-
20
-
-
0343046793
-
Knowledge-Based Simulation of Construction Plans
-
ASCE, Dallas, Texas
-
Odeh, A. M., I. D. Tommelein, and R. I. Carr. 1992. Knowledge-Based Simulation of Construction Plans. Proceedings of the Eighth Conference on Computing in Civil Engineering, ASCE, Dallas, Texas, 1042-1049.
-
(1992)
Proceedings of the Eighth Conference on Computing in Civil Engineering
, pp. 1042-1049
-
-
Odeh, A.M.1
Tommelein, I.D.2
Carr, R.I.3
-
21
-
-
0017949082
-
Interactive Graphics for Simulating Construction Operations
-
Paulson, B. C. 1978. Interactive Graphics for Simulating Construction Operations. Journal of the Construction Division, ASCE, 104(1), 69-76.
-
(1978)
Journal of the Construction Division, ASCE
, vol.104
, Issue.1
, pp. 69-76
-
-
Paulson, B.C.1
-
22
-
-
46149105871
-
A Scalable Component-based Modeling Environment Supporting Model Validation
-
Orlando, FL
-
Sarjoughian, H. S. 2005. A Scalable Component-based Modeling Environment Supporting Model Validation. Interserive/Industry Training, Simulation, and Education Conference, 1-11, Orlando, FL.
-
(2005)
Interserive/Industry Training, Simulation, and Education Conference
, pp. 1-11
-
-
Sarjoughian, H.S.1
-
23
-
-
31344462120
-
Hybrid Discrete Event Simulation with Model Predictive Control for Semiconductor Supply-chain Manufacturing
-
Orlando, FL. Piscataway, New Jersey: Institute of Electrical and Electronics Engineers
-
Sarjoughian, H. S., D. Huang, W. Wang, D. E. Rivera, K. G. Kempf, G. W. Godding, H. D. Mittelmann. 2005. Hybrid Discrete Event Simulation with Model Predictive Control for Semiconductor Supply-chain Manufacturing. Proceedings of the 2005 Winter Simulation Conference, 256-266, Orlando, FL. Piscataway, New Jersey: Institute of Electrical and Electronics Engineers.
-
(2005)
Proceedings of the 2005 Winter Simulation Conference
, pp. 256-266
-
-
Sarjoughian, H.S.1
Huang, D.2
Wang, W.3
Rivera, D.E.4
Kempf, K.G.5
Godding, G.W.6
Mittelmann, H.D.7
-
24
-
-
0029499774
-
HSM - Simulation-based Project Planning Method for Construction Projects
-
Sawhney, A. and S. M. AbouRizk. 1995. HSM - Simulation-based Project Planning Method for Construction Projects. Journal of Construction Engineering and Management, ASCE, 121(3), 297-303.
-
(1995)
Journal of Construction Engineering and Management, ASCE
, vol.121
, Issue.3
, pp. 297-303
-
-
Sawhney, A.1
AbouRizk, S.M.2
-
25
-
-
0035705403
-
Simulation of Production Home Building using Simphony
-
ed. B. A. Peters, J. S. Smith, D. J. Medeiros, and M. W. Rohrer, Piscataway, New Jersey: Institute of Electrical and Electronics Engineers
-
Sawhney, A., H. H. Bashford, K. D. Walsh, A. Mund. 2001. Simulation of Production Home Building using Simphony. Proceedings of the 2001 Winter Simulation Conference, ed. B. A. Peters, J. S. Smith, D. J. Medeiros, and M. W. Rohrer, 1521-1527. Piscataway, New Jersey: Institute of Electrical and Electronics Engineers.
-
(2001)
Proceedings of the 2001 Winter Simulation Conference
, pp. 1521-1527
-
-
Sawhney, A.1
Bashford, H.H.2
Walsh, K.D.3
Mund, A.4
-
26
-
-
27144464137
-
-
Sawhney, A., H.H. Bashford, S. Palaniappan, K. D. Walsh, and J. Thompson. 2005. A Discrete Event Simulation Model to Analyze the Residential Construction Inspection Process. Proceedings of the 2005 ASCE International Conference on Computing in Civil Engineering, ed. L. Soibelman and F. Peña-Mora, July 12-15, 2005, Cancun, Mexico.
-
Sawhney, A., H.H. Bashford, S. Palaniappan, K. D. Walsh, and J. Thompson. 2005. A Discrete Event Simulation Model to Analyze the Residential Construction Inspection Process. Proceedings of the 2005 ASCE International Conference on Computing in Civil Engineering, ed. L. Soibelman and F. Peña-Mora, July 12-15, 2005, Cancun, Mexico.
-
-
-
-
27
-
-
0003880227
-
A Simulation Approach to the selection of Construction Equipment
-
Technical Report No. 26, The Construction Institute, Stanford University
-
Teicholz, P. 1963. A Simulation Approach to the selection of Construction Equipment. Technical Report No. 26, The Construction Institute, Stanford University.
-
(1963)
-
-
Teicholz, P.1
-
28
-
-
0032645520
-
Parade Game: Impact of Work Flow Variability on Trade Performance
-
Tommelein, I. D., D. Riley, and G. A. Howell. 1999. Parade Game: Impact of Work Flow Variability on Trade Performance, Journal of Construction Engineering and Management, ASCE, 125(5), 304-310.
-
(1999)
Journal of Construction Engineering and Management, ASCE
, vol.125
, Issue.5
, pp. 304-310
-
-
Tommelein, I.D.1
Riley, D.2
Howell, G.A.3
-
29
-
-
0003669295
-
-
Second Edition, Academic Press, New York, NY
-
Zeigler, B. P., T. G. Kim, and H. Praehofer. 2000. Theory of Modeling and Simulation. Second Edition, Academic Press, New York, NY.
-
(2000)
Theory of Modeling and Simulation
-
-
Zeigler, B.P.1
Kim, T.G.2
Praehofer, H.3
|