-
1
-
-
84925891791
-
The decomposition of effects in path analysis
-
Alwin, E. F., and Hauser, R. M. (1975). "The decomposition of effects in path analysis." Am. Sociol. Rev., 40(1), 37-47.
-
(1975)
Am. Sociol. Rev.
, vol.40
, Issue.1
, pp. 37-47
-
-
Alwin, E.F.1
Hauser, R.M.2
-
2
-
-
2342418968
-
Implementing lead construction: Stabilizing work flow
-
L. Alarcon, ed., A. A. Balkema, Rotterdam, The Netherlands
-
Ballard, G., and Howell, G. (1997). "Implementing lead construction: Stabilizing work flow." Lean construction, L. Alarcon, ed., A. A. Balkema, Rotterdam, The Netherlands, 101-110.
-
(1997)
Lean Construction
, pp. 101-110
-
-
Ballard, G.1
Howell, G.2
-
3
-
-
13944278983
-
Path analysis
-
Garson, G. D. (2003). "Path analysis." An online textbook, 〈http:/www2.chass.ncsu.edu/garson/pa765/path.htm〉.
-
(2003)
An Online Textbook
-
-
Garson, G.D.1
-
4
-
-
3242662050
-
Assignment and allocation optimization of partially multiskilled workforce
-
Gomar, J. E., Hass, C. T., and Morton, D. P. (2002). "Assignment and allocation optimization of partially multiskilled workforce." J. Constr. Eng. Manage., 128(2), 103-109.
-
(2002)
J. Constr. Eng. Manage.
, vol.128
, Issue.2
, pp. 103-109
-
-
Gomar, J.E.1
Hass, C.T.2
Morton, D.P.3
-
5
-
-
84856668661
-
Improving performance through measurement: The application of lean production and organizational learning principles
-
International Group for Lean Construction, Brington
-
Lantelme, E., and Formoso, C. T. (2000). "Improving performance through measurement: The application of lean production and organizational learning principles." Proc., IGLC-8, International Group for Lean Construction, Brington.
-
(2000)
Proc., IGLC-8
-
-
Lantelme, E.1
Formoso, C.T.2
-
6
-
-
13944267676
-
Path analysis
-
Lea, S., and Webley, P. (1997). "Path analysis." Lecture Note, (http://www.exeter.ac.uk/~SEGLea/multivar2/pathanal.html).
-
(1997)
Lecture Note
-
-
Lea, S.1
Webley, P.2
-
8
-
-
0003795888
-
-
Lawrence Erlbaum, Mahwah, N.J.
-
Schumacker, R. E., and Lomax, R. G. (1996). A beginner's guide to structural equation modeling, Lawrence Erlbaum, Mahwah, N.J.
-
(1996)
A Beginner's Guide to Structural Equation Modeling
-
-
Schumacker, R.E.1
Lomax, R.G.2
-
11
-
-
13944264322
-
Reducing variability to improve performance as a lean construction principle
-
Thomas, H. R., Horman, M. J., de Souza, U. E. L., and Azvřski, I. (2002). "Reducing variability to improve performance as a lean construction principle." J. Constr. Eng. Manage., 128(2), 144-154.
-
(2002)
J. Constr. Eng. Manage.
, vol.128
, Issue.2
, pp. 144-154
-
-
Thomas, H.R.1
Horman, M.J.2
De Souza, U.E.L.3
Azvřski, I.4
-
12
-
-
12344327099
-
Improving labor flow reliability for better productivity as lean construction principle
-
Thomas, H. R., Horman, M. J., Minchin, R. E., Jr., and Chen, D. (2003). "Improving labor flow reliability for better productivity as lean construction principle." J. Constr. Eng. Manage., 129(3), 251-261.
-
(2003)
J. Constr. Eng. Manage.
, vol.129
, Issue.3
, pp. 251-261
-
-
Thomas, H.R.1
Horman, M.J.2
Minchin Jr., R.E.3
Chen, D.4
-
13
-
-
0032645520
-
Parade game: Impact of work flow variability on trade performance
-
Tommelein, I. D., Riley, D. R., and Howell, G. A. (1999). "Parade game: Impact of work flow variability on trade performance." J. Constr. Eng. Manage., 125(5), 304-310.
-
(1999)
J. Constr. Eng. Manage.
, vol.125
, Issue.5
, pp. 304-310
-
-
Tommelein, I.D.1
Riley, D.R.2
Howell, G.A.3
|