메뉴 건너뛰기




Volumn , Issue , 2008, Pages 21-26

Power-state-aware buffered tree construction

Author keywords

[No Author keywords available]

Indexed keywords

SIGNAL PROCESSING; SYSTEMS ENGINEERING; TIMING CIRCUITS;

EID: 62349093962     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/ICCD.2008.4751835     Document Type: Conference Paper
Times cited : (3)

References (16)
  • 2
    • 0036811340 scopus 로고    scopus 로고
    • Maze routing with buffer insertion and wiresizing
    • Oct
    • M. Lai and D. F. Wong, "Maze routing with buffer insertion and wiresizing," IEEE Trans. Computer-Aided Design, vol. 21, no. 10, pp. 1205-1209, Oct. 2002.
    • (2002) IEEE Trans. Computer-Aided Design , vol.21 , Issue.10 , pp. 1205-1209
    • Lai, M.1    Wong, D.F.2
  • 5
    • 0034229328 scopus 로고    scopus 로고
    • Simultaneous routing and buffer insertion with restrictions on buffer locations
    • H. Zhou, M. D. Wong, I.-M. Liu, and A. Aziz, "Simultaneous routing and buffer insertion with restrictions on buffer locations," IEEE Trans. Computer-Aided Design, vol. 19, no. 7, pp. 819-824, 2000.
    • (2000) IEEE Trans. Computer-Aided Design , vol.19 , Issue.7 , pp. 819-824
    • Zhou, H.1    Wong, M.D.2    Liu, I.-M.3    Aziz, A.4
  • 7
    • 34547354294 scopus 로고    scopus 로고
    • A provably good approximation algorithm for power optimization using multiple supply voltages
    • June
    • H.-Y. Liu, W.-P. Lee, and Y.-W. Chang, "A provably good approximation algorithm for power optimization using multiple supply voltages," in Proc. ACM/IEEE Design Automation Conf. (DAC'07), June 2007, pp. 887-890.
    • (2007) Proc. ACM/IEEE Design Automation Conf. (DAC'07) , pp. 887-890
    • Liu, H.-Y.1    Lee, W.-P.2    Chang, Y.-W.3
  • 13
    • 27944470532 scopus 로고    scopus 로고
    • Power optimal dual-vdd buffered tree considering buffer stations and blockages
    • June
    • K. H. Tam and L. He, "Power optimal dual-vdd buffered tree considering buffer stations and blockages," in Proc. ACM/IEEE Design Automation Conf. (DAC'05), June 2005, pp. 497-502.
    • (2005) Proc. ACM/IEEE Design Automation Conf. (DAC'05) , pp. 497-502
    • Tam, K.H.1    He, L.2
  • 14
    • 43349083061 scopus 로고    scopus 로고
    • Blockage and voltage island-aware dualvdd buffered tree construction under fixed buffer locations
    • Apr
    • B. Tseng and H.-M. Chen, "Blockage and voltage island-aware dualvdd buffered tree construction under fixed buffer locations," in Proc. ACM Int. Symp. on Physical Design (ISPD'08), Apr. 2008, pp. 23-30.
    • (2008) Proc. ACM Int. Symp. on Physical Design (ISPD'08) , pp. 23-30
    • Tseng, B.1    Chen, H.-M.2
  • 15
    • 34748823693 scopus 로고
    • The transient response of damped linear networks with particular regard to wideband amplifiers
    • Jan
    • W. C. Elmore, "The transient response of damped linear networks with particular regard to wideband amplifiers," J. Applied Phys., vol. 19, pp. 55-63, Jan. 1948.
    • (1948) J. Applied Phys , vol.19 , pp. 55-63
    • Elmore, W.C.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.