메뉴 건너뛰기




Volumn 46, Issue 17, 2008, Pages 4903-4923

Improved customer satisfaction with a hybrid dispatching rule in semiconductor back-end factories

Author keywords

Dispatching; Fuzzy analytic hierarchy process; Semiconductor manufacturing; WIP balance

Indexed keywords

ACCIDENT PREVENTION; ANALYTIC HIERARCHY PROCESS; DECISION THEORY; ELECTRIC CONDUCTIVITY; ELECTRON BEAM LITHOGRAPHY; HIERARCHICAL SYSTEMS; MECHANISMS; OPTIMIZATION; SALES; SEMICONDUCTOR MATERIALS; THROUGHPUT;

EID: 48249085362     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207540701324168     Document Type: Article
Times cited : (29)

References (49)
  • 1
    • 0028460891 scopus 로고
    • Optimal operation of manufacturing systems with controlled work-in-process levels
    • Askin, R.G. and Krisht, A.H., Optimal operation of manufacturing systems with controlled work-in-process levels. Int. J. Prod. Econ., 1994, 37, 1637-1653.
    • (1994) Int. J. Prod. Econ , vol.37 , pp. 1637-1653
    • Askin, R.G.1    Krisht, A.H.2
  • 2
    • 0000914493 scopus 로고
    • Multi-criteria decision analysis with fuzzy pairwise comparisons
    • Boender, C.G.E, de Graan, J.G. and Lootsma, F.A., Multi-criteria decision analysis with fuzzy pairwise comparisons. Fuzzy Set Syst., 1989, 29, 133-143.
    • (1989) Fuzzy Set Syst , vol.29 , pp. 133-143
    • Boender, C.G.E.1    de Graan, J.G.2    Lootsma, F.A.3
  • 3
    • 0031095866 scopus 로고    scopus 로고
    • A comparison of production-line control mechanisms
    • Bonvik, A.M., Couch, C.E. and Gershwin, S.B., A comparison of production-line control mechanisms. Int. J. Prod. Res., 1997, 25, 789-804.
    • (1997) Int. J. Prod. Res , vol.25 , pp. 789-804
    • Bonvik, A.M.1    Couch, C.E.2    Gershwin, S.B.3
  • 5
    • 0015202748 scopus 로고
    • The role of banks in flow-line production systems
    • Buzacott, J.A., The role of banks in flow-line production systems. Int. J. Prod. Res., 1971, 9, 425-436.
    • (1971) Int. J. Prod. Res , vol.9 , pp. 425-436
    • Buzacott, J.A.1
  • 6
    • 0023981636 scopus 로고    scopus 로고
    • Empirical evaluation of a queueing network model for semiconductor wafer fabrication
    • Chen, H., Harrison, J.M, Mandelbaum, A. and Wein, L.M., Empirical evaluation of a queueing network model for semiconductor wafer fabrication. Oper. Res., 1998, 36, 202-215.
    • (1998) Oper. Res , vol.36 , pp. 202-215
    • Chen, H.1    Harrison, J.M.2    Mandelbaum, A.3    Wein, L.M.4
  • 7
    • 43949150392 scopus 로고
    • Evaluating weapon system by AHP based on fuzzy scale
    • Cheng, C.H. and Mon, D.L., Evaluating weapon system by AHP based on fuzzy scale. Fuzzy Set Syst., 1994, 63, 1-10.
    • (1994) Fuzzy Set Syst , vol.63 , pp. 1-10
    • Cheng, C.H.1    Mon, D.L.2
  • 8
    • 0030837856 scopus 로고    scopus 로고
    • Evaluating naval tactical missile systems by fuzzy AHP based on the grade value of membership function
    • Cheng, C.H., Evaluating naval tactical missile systems by fuzzy AHP based on the grade value of membership function. Eur. J. Oper. Res., 1996, 96, 343-350.
    • (1996) Eur. J. Oper. Res , vol.96 , pp. 343-350
    • Cheng, C.H.1
  • 9
    • 0032688425 scopus 로고    scopus 로고
    • Evaluating attack helicopters by AHP based on linguistic variable weight
    • Cheng, C.H., Yang, K.L. and Hwang, C.L., Evaluating attack helicopters by AHP based on linguistic variable weight. Eur. J. Oper. Res., 1999, 116, 423-435.
    • (1999) Eur. J. Oper. Res , vol.116 , pp. 423-435
    • Cheng, C.H.1    Yang, K.L.2    Hwang, C.L.3
  • 10
    • 48249130004 scopus 로고    scopus 로고
    • Choobineh, F. and Sowrirajan, S., Capacitated - Constant Work in Process (C-CONWIP): a Job Shop Control System. Technical report, Industrial and Management Systems Engineering, University of Nebraska, Lincoln, Nebraska, 1996.
    • Choobineh, F. and Sowrirajan, S., Capacitated - Constant Work in Process (C-CONWIP): a Job Shop Control System. Technical report, Industrial and Management Systems Engineering, University of Nebraska, Lincoln, Nebraska, 1996.
  • 11
    • 0004995220 scopus 로고    scopus 로고
    • A new scheduling approach using combined dispatching criteria in wafer fab operations
    • Technical report IE-ORPS-99-001, Department of Industrial Engineering, Arizona State University, Tempe, AZ
    • Dabbas, R.M. and Fowler, J., A new scheduling approach using combined dispatching criteria in wafer fab operations. Technical report IE-ORPS-99-001, Department of Industrial Engineering, Arizona State University, Tempe, AZ, 1999.
    • (1999)
    • Dabbas, R.M.1    Fowler, J.2
  • 12
    • 0035307346 scopus 로고    scopus 로고
    • A Combined dispatching criteria approach to scheduling semiconductor manufacturing systems
    • Dabbas, R.M., Chen, H.N., Fowler, J.W. and Shunk, D., A Combined dispatching criteria approach to scheduling semiconductor manufacturing systems. Comput. Ind. Eng., 2001, 39, 307-324.
    • (2001) Comput. Ind. Eng , vol.39 , pp. 307-324
    • Dabbas, R.M.1    Chen, H.N.2    Fowler, J.W.3    Shunk, D.4
  • 13
    • 0031678025 scopus 로고    scopus 로고
    • Base-stock control for single product tandem make-to-stock systems
    • Duenyas, I. and Patananake, P., Base-stock control for single product tandem make-to-stock systems. IIE Transact., 1998, 30, 31-39.
    • (1998) IIE Transact , vol.30 , pp. 31-39
    • Duenyas, I.1    Patananake, P.2
  • 14
    • 0032272368 scopus 로고    scopus 로고
    • Effective implementation of cycle time reduction strategies for semiconductor back-end manufacturing
    • Domaschke, J., Brown, S., Robinson, J. and Leibl, F., Effective implementation of cycle time reduction strategies for semiconductor back-end manufacturing, in Proceedings of the 1998 Simulation Conference, 1998, 985-992.
    • (1998) Proceedings of the 1998 Simulation Conference , pp. 985-992
    • Domaschke, J.1    Brown, S.2    Robinson, J.3    Leibl, F.4
  • 19
    • 0032656193 scopus 로고    scopus 로고
    • The construction of production performance prediction system for semiconductor manufacturing with artificial neural networks
    • Huang, C.L., Huang, Y.H., Chang, T.Y., Chang, S.H., Chung, C.H., Huang, D.T. and Li, R.J., The construction of production performance prediction system for semiconductor manufacturing with artificial neural networks. Int. J. Prod. Res., 1999, 37, 1387-1402.
    • (1999) Int. J. Prod. Res , vol.37 , pp. 1387-1402
    • Huang, C.L.1    Huang, Y.H.2    Chang, T.Y.3    Chang, S.H.4    Chung, C.H.5    Huang, D.T.6    Li, R.J.7
  • 20
    • 0028406188 scopus 로고
    • Decomposition method application to a large scale linear programming WIP projection model
    • Kim, J.S. and Leachman, R.C., Decomposition method application to a large scale linear programming WIP projection model. Eur. J. Oper. Res., 1994, 74, 152-160.
    • (1994) Eur. J. Oper. Res , vol.74 , pp. 152-160
    • Kim, J.S.1    Leachman, R.C.2
  • 21
    • 0036467908 scopus 로고    scopus 로고
    • A decision support system for selecting convenience store location through integration of fuzzy AHP and artificial neural network
    • Kuo, R.J., Chi., S.C. and Kao, S.S., A decision support system for selecting convenience store location through integration of fuzzy AHP and artificial neural network. Comput. Ind., 2002, 47, 199-214.
    • (2002) Comput. Ind , vol.47 , pp. 199-214
    • Kuo, R.J.1    Chi, S.C.2    Kao, S.S.3
  • 22
    • 3042576321 scopus 로고
    • Adaptive input control for job-shop type production systems with varying demands using inverse queuing network analysis
    • Kuroda, M. and Kawada, A., Adaptive input control for job-shop type production systems with varying demands using inverse queuing network analysis. Int. J. Prod. Econ., 1995, 41, 217-225.
    • (1995) Int. J. Prod. Econ , vol.41 , pp. 217-225
    • Kuroda, M.1    Kawada, A.2
  • 23
    • 3342943539 scopus 로고
    • Implementation of a decision supporting for scheduling semiconductor test operations
    • Lee, C.Y., Martin-Vega, L.A., Uszoy, R. and Hinchman, J., Implementation of a decision supporting for scheduling semiconductor test operations. J. Electron. Manuf., 1993, 3, 121-131.
    • (1993) J. Electron. Manuf , vol.3 , pp. 121-131
    • Lee, C.Y.1    Martin-Vega, L.A.2    Uszoy, R.3    Hinchman, J.4
  • 24
    • 0034309436 scopus 로고    scopus 로고
    • Multi-objective production scheduling of probe process in semiconductor manufacturing
    • Lee, Y.H., Lee, B.K. and Jeong, B., Multi-objective production scheduling of probe process in semiconductor manufacturing. Prod. Plan. & Cont., 2000, 11, 660-669.
    • (2000) Prod. Plan. & Cont , vol.11 , pp. 660-669
    • Lee, Y.H.1    Lee, B.K.2    Jeong, B.3
  • 25
    • 0030084325 scopus 로고    scopus 로고
    • Minimum inventory dispatching in semiconductor wafer fabrication
    • Li, S., Tang, T. and Collins, D.W., Minimum inventory dispatching in semiconductor wafer fabrication. IEEE Trans. Semiconduct. M., 1996, 9, 145-149.
    • (1996) IEEE Trans. Semiconduct. M , vol.9 , pp. 145-149
    • Li, S.1    Tang, T.2    Collins, D.W.3
  • 26
    • 0035342034 scopus 로고    scopus 로고
    • A total standard wip estimation method for wafer fabrication
    • Lin, Y.H. and Lee, C.E., A total standard wip estimation method for wafer fabrication. Eur. J. Oper. Res., 2001, 131, 78-94.
    • (2001) Eur. J. Oper. Res , vol.131 , pp. 78-94
    • Lin, Y.H.1    Lee, C.E.2
  • 27
    • 0034247692 scopus 로고    scopus 로고
    • An effective method to reduce inventory in job shops
    • Luh, P.B., Zhou, X. and Tomastik, R.N., An effective method to reduce inventory in job shops. IEEE Trans. Robotic. Autom., 2000, 16, 420-424.
    • (2000) IEEE Trans. Robotic. Autom , vol.16 , pp. 420-424
    • Luh, P.B.1    Zhou, X.2    Tomastik, R.N.3
  • 28
    • 48249111746 scopus 로고    scopus 로고
    • Mamzione, L.T., Plastic Packaging of Microelectronic Devices. Technical Report, AT&T Bell Laboratories, 1990 [Also Plastic Packaging of Microelectronic Devices, 1990 (Van Nostrand Reinhold: New York)].
    • Mamzione, L.T., Plastic Packaging of Microelectronic Devices. Technical Report, AT&T Bell Laboratories, 1990 [Also Plastic Packaging of Microelectronic Devices, 1990 (Van Nostrand Reinhold: New York)].
  • 29
    • 84976808911 scopus 로고
    • Simulation of a semiconductor manufacturing line
    • Miller, D.J., Simulation of a semiconductor manufacturing line. Commun. ACM, 1990, 33, 99-108.
    • (1990) Commun. ACM , vol.33 , pp. 99-108
    • Miller, D.J.1
  • 31
    • 33644697431 scopus 로고    scopus 로고
    • Fuzzy-AHP application to country risk assessment
    • Murtaza, M.B., Fuzzy-AHP application to country risk assessment. Am. Bus. Rev., 2003, 21, 109-116.
    • (2003) Am. Bus. Rev , vol.21 , pp. 109-116
    • Murtaza, M.B.1
  • 32
    • 0035900288 scopus 로고    scopus 로고
    • Optimal investment in setup reduction in manufacturing systems with WIP inventories
    • Nye, T.J., Jewkes, E.M. and Dilts, D.M., Optimal investment in setup reduction in manufacturing systems with WIP inventories. Eur. J. Oper. Res., 2001, 135, 128-141.
    • (2001) Eur. J. Oper. Res , vol.135 , pp. 128-141
    • Nye, T.J.1    Jewkes, E.M.2    Dilts, D.M.3
  • 33
    • 11844279037 scopus 로고    scopus 로고
    • Virtual production line based WIP control for semiconductor manufacturing systems
    • Qiu, R.G., Virtual production line based WIP control for semiconductor manufacturing systems. Int. J. Prod. Econ., 2005, 95, 165-178.
    • (2005) Int. J. Prod. Econ , vol.95 , pp. 165-178
    • Qiu, R.G.1
  • 34
    • 0029341463 scopus 로고
    • The use of upstream and downstream information in scheduling semiconductor batch operations
    • Robinson, J.K., Fowler, J. and Bard, J., The use of upstream and downstream information in scheduling semiconductor batch operations. Int. J. Prod. Res., 1990, 7, 1849-1870.
    • (1990) Int. J. Prod. Res , vol.7 , pp. 1849-1870
    • Robinson, J.K.1    Fowler, J.2    Bard, J.3
  • 35
    • 0032265912 scopus 로고    scopus 로고
    • WIP Evaluation of a Semiconductor Factory after Bottleneck Work center Breakdown
    • Rose, O., WIP Evaluation of a Semiconductor Factory after Bottleneck Work center Breakdown, in Proceedings of the 1998 Winter Simulation Conference, 1998, pp. 997-1003.
    • (1998) Proceedings of the 1998 Winter Simulation Conference , pp. 997-1003
    • Rose, O.1
  • 36
    • 0038370170 scopus 로고    scopus 로고
    • Total WIP and WIP mix for a CONWIP controlled job shop
    • Ryan, S.M. and Choobineh, F.F., Total WIP and WIP mix for a CONWIP controlled job shop. IIE Transact., 2003, 35, 405-418.
    • (2003) IIE Transact , vol.35 , pp. 405-418
    • Ryan, S.M.1    Choobineh, F.F.2
  • 38
    • 0003552056 scopus 로고    scopus 로고
    • Semiconductor Industry Association, Semiconductor Industry Association: San. Jose, CA
    • Semiconductor Industry Association, National Technology Roadmap for Semiconductors, pp. 127-129, 1997 (Semiconductor Industry Association: San. Jose, CA).
    • (1997) National Technology Roadmap for Semiconductors , pp. 127-129
  • 39
    • 0035334647 scopus 로고    scopus 로고
    • A simulation based analysis of cycle time distribution and throughput in semiconductor backend manufacturing
    • Sivakumar, A.I. and Chong, C.S., A simulation based analysis of cycle time distribution and throughput in semiconductor backend manufacturing. Comput. Ind., 2001, 45, 59-78.
    • (2001) Comput. Ind , vol.45 , pp. 59-78
    • Sivakumar, A.I.1    Chong, C.S.2
  • 40
    • 0032048282 scopus 로고    scopus 로고
    • Constraint time buffer determination model
    • Tu, Y.M. and Li, R.L., Constraint time buffer determination model. Int. J. Prod. Res., 1998, 36, 1091-1130.
    • (1998) Int. J. Prod. Res , vol.36 , pp. 1091-1130
    • Tu, Y.M.1    Li, R.L.2
  • 41
    • 27844453227 scopus 로고    scopus 로고
    • Model to determine the backup capacity of a wafer foundry
    • Tu, Y.M., Chao, Y.H., Chang, S.H. and You, H.C., Model to determine the backup capacity of a wafer foundry. Int. J. Prod. Res., 2005, 43, 339-359.
    • (2005) Int. J. Prod. Res , vol.43 , pp. 339-359
    • Tu, Y.M.1    Chao, Y.H.2    Chang, S.H.3    You, H.C.4
  • 42
    • 84952240555 scopus 로고
    • A review of production planning and scheduling models in the semiconductor industry part I: System characteristics, performance evaluation and production planning
    • Uzsoy, R., Lee, C.Y. and Martin-Vega, L.A., A review of production planning and scheduling models in the semiconductor industry part I: system characteristics, performance evaluation and production planning. IIE Transact., 1992, 24, 47-60.
    • (1992) IIE Transact , vol.24 , pp. 47-60
    • Uzsoy, R.1    Lee, C.Y.2    Martin-Vega, L.A.3
  • 43
    • 33748712013 scopus 로고    scopus 로고
    • Parallel algorithm for setting WIP levels for multi-product CONWIP system
    • Wang, L. and Prabhu, V., Parallel algorithm for setting WIP levels for multi-product CONWIP system. Int. J. Prod. Res., 2006, 44, 4681-4793.
    • (2006) Int. J. Prod. Res , vol.44 , pp. 4681-4793
    • Wang, L.1    Prabhu, V.2
  • 44
    • 0024055865 scopus 로고
    • Scheduling semiconductor wafer fabrication
    • Wein, L.M., Scheduling semiconductor wafer fabrication. IEEE Trans. Semiconduct. Manuf., 1988, 1, 115-130.
    • (1988) IEEE Trans. Semiconduct. Manuf , vol.1 , pp. 115-130
    • Wein, L.M.1
  • 45
    • 0026869951 scopus 로고
    • The relationship between yield and cycle time in semiconductor wafer fabrication
    • Wein, L.M., The relationship between yield and cycle time in semiconductor wafer fabrication. IEEE Trans. Semiconduct. Manuf., 1992, 5, 156-158.
    • (1992) IEEE Trans. Semiconduct. Manuf , vol.5 , pp. 156-158
    • Wein, L.M.1
  • 47
    • 33646191396 scopus 로고    scopus 로고
    • Dispatching in semiconductor fabs with machine-dedication features
    • Wu, M.C., Huang, Y.L. and Yang, K.F., Dispatching in semiconductor fabs with machine-dedication features. Int. J. Adv. Manuf. Tech., 2006, 28, 978-984.
    • (2006) Int. J. Adv. Manuf. Tech , vol.28 , pp. 978-984
    • Wu, M.C.1    Huang, Y.L.2    Yang, K.F.3
  • 48
    • 0036885562 scopus 로고    scopus 로고
    • Yu, C.S., A GP-AHP method for solving group decision-making fuzzy AHP problems. Comput. Oper. Res., 2002, 29, 1969-2001.
    • Yu, C.S., A GP-AHP method for solving group decision-making fuzzy AHP problems. Comput. Oper. Res., 2002, 29, 1969-2001.
  • 49
    • 0002425683 scopus 로고
    • The analytic hierarchy process- a survey of the method and its applications
    • Zahedi, F., The analytic hierarchy process- a survey of the method and its applications. Interface, 1986, 16, 96-108.
    • (1986) Interface , vol.16 , pp. 96-108
    • Zahedi, F.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.