-
1
-
-
0028460891
-
Optimal operation of manufacturing systems with controlled work-in-process levels
-
Askin, R.G. and Krisht, A.H., Optimal operation of manufacturing systems with controlled work-in-process levels. Int. J. Prod. Econ., 1994, 37, 1637-1653.
-
(1994)
Int. J. Prod. Econ
, vol.37
, pp. 1637-1653
-
-
Askin, R.G.1
Krisht, A.H.2
-
2
-
-
0000914493
-
Multi-criteria decision analysis with fuzzy pairwise comparisons
-
Boender, C.G.E, de Graan, J.G. and Lootsma, F.A., Multi-criteria decision analysis with fuzzy pairwise comparisons. Fuzzy Set Syst., 1989, 29, 133-143.
-
(1989)
Fuzzy Set Syst
, vol.29
, pp. 133-143
-
-
Boender, C.G.E.1
de Graan, J.G.2
Lootsma, F.A.3
-
3
-
-
0031095866
-
A comparison of production-line control mechanisms
-
Bonvik, A.M., Couch, C.E. and Gershwin, S.B., A comparison of production-line control mechanisms. Int. J. Prod. Res., 1997, 25, 789-804.
-
(1997)
Int. J. Prod. Res
, vol.25
, pp. 789-804
-
-
Bonvik, A.M.1
Couch, C.E.2
Gershwin, S.B.3
-
4
-
-
0022748217
-
Performance analysis techniques for IC manufacturing lines
-
Burman, D.Y., Gurrola-Gal, F.J., Nozari, A., Sathaye, S. and Sitarik, J.P., Performance analysis techniques for IC manufacturing lines. AT&T Tech. J., 1986, 65, 46-57.
-
(1986)
AT&T Tech. J
, vol.65
, pp. 46-57
-
-
Burman, D.Y.1
Gurrola-Gal, F.J.2
Nozari, A.3
Sathaye, S.4
Sitarik, J.P.5
-
5
-
-
0015202748
-
The role of banks in flow-line production systems
-
Buzacott, J.A., The role of banks in flow-line production systems. Int. J. Prod. Res., 1971, 9, 425-436.
-
(1971)
Int. J. Prod. Res
, vol.9
, pp. 425-436
-
-
Buzacott, J.A.1
-
6
-
-
0023981636
-
Empirical evaluation of a queueing network model for semiconductor wafer fabrication
-
Chen, H., Harrison, J.M, Mandelbaum, A. and Wein, L.M., Empirical evaluation of a queueing network model for semiconductor wafer fabrication. Oper. Res., 1998, 36, 202-215.
-
(1998)
Oper. Res
, vol.36
, pp. 202-215
-
-
Chen, H.1
Harrison, J.M.2
Mandelbaum, A.3
Wein, L.M.4
-
7
-
-
43949150392
-
Evaluating weapon system by AHP based on fuzzy scale
-
Cheng, C.H. and Mon, D.L., Evaluating weapon system by AHP based on fuzzy scale. Fuzzy Set Syst., 1994, 63, 1-10.
-
(1994)
Fuzzy Set Syst
, vol.63
, pp. 1-10
-
-
Cheng, C.H.1
Mon, D.L.2
-
8
-
-
0030837856
-
Evaluating naval tactical missile systems by fuzzy AHP based on the grade value of membership function
-
Cheng, C.H., Evaluating naval tactical missile systems by fuzzy AHP based on the grade value of membership function. Eur. J. Oper. Res., 1996, 96, 343-350.
-
(1996)
Eur. J. Oper. Res
, vol.96
, pp. 343-350
-
-
Cheng, C.H.1
-
9
-
-
0032688425
-
Evaluating attack helicopters by AHP based on linguistic variable weight
-
Cheng, C.H., Yang, K.L. and Hwang, C.L., Evaluating attack helicopters by AHP based on linguistic variable weight. Eur. J. Oper. Res., 1999, 116, 423-435.
-
(1999)
Eur. J. Oper. Res
, vol.116
, pp. 423-435
-
-
Cheng, C.H.1
Yang, K.L.2
Hwang, C.L.3
-
10
-
-
48249130004
-
-
Choobineh, F. and Sowrirajan, S., Capacitated - Constant Work in Process (C-CONWIP): a Job Shop Control System. Technical report, Industrial and Management Systems Engineering, University of Nebraska, Lincoln, Nebraska, 1996.
-
Choobineh, F. and Sowrirajan, S., Capacitated - Constant Work in Process (C-CONWIP): a Job Shop Control System. Technical report, Industrial and Management Systems Engineering, University of Nebraska, Lincoln, Nebraska, 1996.
-
-
-
-
11
-
-
0004995220
-
A new scheduling approach using combined dispatching criteria in wafer fab operations
-
Technical report IE-ORPS-99-001, Department of Industrial Engineering, Arizona State University, Tempe, AZ
-
Dabbas, R.M. and Fowler, J., A new scheduling approach using combined dispatching criteria in wafer fab operations. Technical report IE-ORPS-99-001, Department of Industrial Engineering, Arizona State University, Tempe, AZ, 1999.
-
(1999)
-
-
Dabbas, R.M.1
Fowler, J.2
-
12
-
-
0035307346
-
A Combined dispatching criteria approach to scheduling semiconductor manufacturing systems
-
Dabbas, R.M., Chen, H.N., Fowler, J.W. and Shunk, D., A Combined dispatching criteria approach to scheduling semiconductor manufacturing systems. Comput. Ind. Eng., 2001, 39, 307-324.
-
(2001)
Comput. Ind. Eng
, vol.39
, pp. 307-324
-
-
Dabbas, R.M.1
Chen, H.N.2
Fowler, J.W.3
Shunk, D.4
-
13
-
-
0031678025
-
Base-stock control for single product tandem make-to-stock systems
-
Duenyas, I. and Patananake, P., Base-stock control for single product tandem make-to-stock systems. IIE Transact., 1998, 30, 31-39.
-
(1998)
IIE Transact
, vol.30
, pp. 31-39
-
-
Duenyas, I.1
Patananake, P.2
-
14
-
-
0032272368
-
Effective implementation of cycle time reduction strategies for semiconductor back-end manufacturing
-
Domaschke, J., Brown, S., Robinson, J. and Leibl, F., Effective implementation of cycle time reduction strategies for semiconductor back-end manufacturing, in Proceedings of the 1998 Simulation Conference, 1998, 985-992.
-
(1998)
Proceedings of the 1998 Simulation Conference
, pp. 985-992
-
-
Domaschke, J.1
Brown, S.2
Robinson, J.3
Leibl, F.4
-
17
-
-
27544469154
-
Conjunctive simulated scheduling
-
Gupta, A.K. and Sivakumar, A.I., Conjunctive simulated scheduling. Int. J. Adv. Manuf. Tech., 2005, 26, 1409-1413.
-
(2005)
Int. J. Adv. Manuf. Tech
, vol.26
, pp. 1409-1413
-
-
Gupta, A.K.1
Sivakumar, A.I.2
-
19
-
-
0032656193
-
The construction of production performance prediction system for semiconductor manufacturing with artificial neural networks
-
Huang, C.L., Huang, Y.H., Chang, T.Y., Chang, S.H., Chung, C.H., Huang, D.T. and Li, R.J., The construction of production performance prediction system for semiconductor manufacturing with artificial neural networks. Int. J. Prod. Res., 1999, 37, 1387-1402.
-
(1999)
Int. J. Prod. Res
, vol.37
, pp. 1387-1402
-
-
Huang, C.L.1
Huang, Y.H.2
Chang, T.Y.3
Chang, S.H.4
Chung, C.H.5
Huang, D.T.6
Li, R.J.7
-
20
-
-
0028406188
-
Decomposition method application to a large scale linear programming WIP projection model
-
Kim, J.S. and Leachman, R.C., Decomposition method application to a large scale linear programming WIP projection model. Eur. J. Oper. Res., 1994, 74, 152-160.
-
(1994)
Eur. J. Oper. Res
, vol.74
, pp. 152-160
-
-
Kim, J.S.1
Leachman, R.C.2
-
21
-
-
0036467908
-
A decision support system for selecting convenience store location through integration of fuzzy AHP and artificial neural network
-
Kuo, R.J., Chi., S.C. and Kao, S.S., A decision support system for selecting convenience store location through integration of fuzzy AHP and artificial neural network. Comput. Ind., 2002, 47, 199-214.
-
(2002)
Comput. Ind
, vol.47
, pp. 199-214
-
-
Kuo, R.J.1
Chi, S.C.2
Kao, S.S.3
-
22
-
-
3042576321
-
Adaptive input control for job-shop type production systems with varying demands using inverse queuing network analysis
-
Kuroda, M. and Kawada, A., Adaptive input control for job-shop type production systems with varying demands using inverse queuing network analysis. Int. J. Prod. Econ., 1995, 41, 217-225.
-
(1995)
Int. J. Prod. Econ
, vol.41
, pp. 217-225
-
-
Kuroda, M.1
Kawada, A.2
-
23
-
-
3342943539
-
Implementation of a decision supporting for scheduling semiconductor test operations
-
Lee, C.Y., Martin-Vega, L.A., Uszoy, R. and Hinchman, J., Implementation of a decision supporting for scheduling semiconductor test operations. J. Electron. Manuf., 1993, 3, 121-131.
-
(1993)
J. Electron. Manuf
, vol.3
, pp. 121-131
-
-
Lee, C.Y.1
Martin-Vega, L.A.2
Uszoy, R.3
Hinchman, J.4
-
24
-
-
0034309436
-
Multi-objective production scheduling of probe process in semiconductor manufacturing
-
Lee, Y.H., Lee, B.K. and Jeong, B., Multi-objective production scheduling of probe process in semiconductor manufacturing. Prod. Plan. & Cont., 2000, 11, 660-669.
-
(2000)
Prod. Plan. & Cont
, vol.11
, pp. 660-669
-
-
Lee, Y.H.1
Lee, B.K.2
Jeong, B.3
-
25
-
-
0030084325
-
Minimum inventory dispatching in semiconductor wafer fabrication
-
Li, S., Tang, T. and Collins, D.W., Minimum inventory dispatching in semiconductor wafer fabrication. IEEE Trans. Semiconduct. M., 1996, 9, 145-149.
-
(1996)
IEEE Trans. Semiconduct. M
, vol.9
, pp. 145-149
-
-
Li, S.1
Tang, T.2
Collins, D.W.3
-
26
-
-
0035342034
-
A total standard wip estimation method for wafer fabrication
-
Lin, Y.H. and Lee, C.E., A total standard wip estimation method for wafer fabrication. Eur. J. Oper. Res., 2001, 131, 78-94.
-
(2001)
Eur. J. Oper. Res
, vol.131
, pp. 78-94
-
-
Lin, Y.H.1
Lee, C.E.2
-
27
-
-
0034247692
-
An effective method to reduce inventory in job shops
-
Luh, P.B., Zhou, X. and Tomastik, R.N., An effective method to reduce inventory in job shops. IEEE Trans. Robotic. Autom., 2000, 16, 420-424.
-
(2000)
IEEE Trans. Robotic. Autom
, vol.16
, pp. 420-424
-
-
Luh, P.B.1
Zhou, X.2
Tomastik, R.N.3
-
28
-
-
48249111746
-
-
Mamzione, L.T., Plastic Packaging of Microelectronic Devices. Technical Report, AT&T Bell Laboratories, 1990 [Also Plastic Packaging of Microelectronic Devices, 1990 (Van Nostrand Reinhold: New York)].
-
Mamzione, L.T., Plastic Packaging of Microelectronic Devices. Technical Report, AT&T Bell Laboratories, 1990 [Also Plastic Packaging of Microelectronic Devices, 1990 (Van Nostrand Reinhold: New York)].
-
-
-
-
29
-
-
84976808911
-
Simulation of a semiconductor manufacturing line
-
Miller, D.J., Simulation of a semiconductor manufacturing line. Commun. ACM, 1990, 33, 99-108.
-
(1990)
Commun. ACM
, vol.33
, pp. 99-108
-
-
Miller, D.J.1
-
31
-
-
33644697431
-
Fuzzy-AHP application to country risk assessment
-
Murtaza, M.B., Fuzzy-AHP application to country risk assessment. Am. Bus. Rev., 2003, 21, 109-116.
-
(2003)
Am. Bus. Rev
, vol.21
, pp. 109-116
-
-
Murtaza, M.B.1
-
32
-
-
0035900288
-
Optimal investment in setup reduction in manufacturing systems with WIP inventories
-
Nye, T.J., Jewkes, E.M. and Dilts, D.M., Optimal investment in setup reduction in manufacturing systems with WIP inventories. Eur. J. Oper. Res., 2001, 135, 128-141.
-
(2001)
Eur. J. Oper. Res
, vol.135
, pp. 128-141
-
-
Nye, T.J.1
Jewkes, E.M.2
Dilts, D.M.3
-
33
-
-
11844279037
-
Virtual production line based WIP control for semiconductor manufacturing systems
-
Qiu, R.G., Virtual production line based WIP control for semiconductor manufacturing systems. Int. J. Prod. Econ., 2005, 95, 165-178.
-
(2005)
Int. J. Prod. Econ
, vol.95
, pp. 165-178
-
-
Qiu, R.G.1
-
34
-
-
0029341463
-
The use of upstream and downstream information in scheduling semiconductor batch operations
-
Robinson, J.K., Fowler, J. and Bard, J., The use of upstream and downstream information in scheduling semiconductor batch operations. Int. J. Prod. Res., 1990, 7, 1849-1870.
-
(1990)
Int. J. Prod. Res
, vol.7
, pp. 1849-1870
-
-
Robinson, J.K.1
Fowler, J.2
Bard, J.3
-
35
-
-
0032265912
-
WIP Evaluation of a Semiconductor Factory after Bottleneck Work center Breakdown
-
Rose, O., WIP Evaluation of a Semiconductor Factory after Bottleneck Work center Breakdown, in Proceedings of the 1998 Winter Simulation Conference, 1998, pp. 997-1003.
-
(1998)
Proceedings of the 1998 Winter Simulation Conference
, pp. 997-1003
-
-
Rose, O.1
-
36
-
-
0038370170
-
Total WIP and WIP mix for a CONWIP controlled job shop
-
Ryan, S.M. and Choobineh, F.F., Total WIP and WIP mix for a CONWIP controlled job shop. IIE Transact., 2003, 35, 405-418.
-
(2003)
IIE Transact
, vol.35
, pp. 405-418
-
-
Ryan, S.M.1
Choobineh, F.F.2
-
38
-
-
0003552056
-
-
Semiconductor Industry Association, Semiconductor Industry Association: San. Jose, CA
-
Semiconductor Industry Association, National Technology Roadmap for Semiconductors, pp. 127-129, 1997 (Semiconductor Industry Association: San. Jose, CA).
-
(1997)
National Technology Roadmap for Semiconductors
, pp. 127-129
-
-
-
39
-
-
0035334647
-
A simulation based analysis of cycle time distribution and throughput in semiconductor backend manufacturing
-
Sivakumar, A.I. and Chong, C.S., A simulation based analysis of cycle time distribution and throughput in semiconductor backend manufacturing. Comput. Ind., 2001, 45, 59-78.
-
(2001)
Comput. Ind
, vol.45
, pp. 59-78
-
-
Sivakumar, A.I.1
Chong, C.S.2
-
40
-
-
0032048282
-
Constraint time buffer determination model
-
Tu, Y.M. and Li, R.L., Constraint time buffer determination model. Int. J. Prod. Res., 1998, 36, 1091-1130.
-
(1998)
Int. J. Prod. Res
, vol.36
, pp. 1091-1130
-
-
Tu, Y.M.1
Li, R.L.2
-
41
-
-
27844453227
-
Model to determine the backup capacity of a wafer foundry
-
Tu, Y.M., Chao, Y.H., Chang, S.H. and You, H.C., Model to determine the backup capacity of a wafer foundry. Int. J. Prod. Res., 2005, 43, 339-359.
-
(2005)
Int. J. Prod. Res
, vol.43
, pp. 339-359
-
-
Tu, Y.M.1
Chao, Y.H.2
Chang, S.H.3
You, H.C.4
-
42
-
-
84952240555
-
A review of production planning and scheduling models in the semiconductor industry part I: System characteristics, performance evaluation and production planning
-
Uzsoy, R., Lee, C.Y. and Martin-Vega, L.A., A review of production planning and scheduling models in the semiconductor industry part I: system characteristics, performance evaluation and production planning. IIE Transact., 1992, 24, 47-60.
-
(1992)
IIE Transact
, vol.24
, pp. 47-60
-
-
Uzsoy, R.1
Lee, C.Y.2
Martin-Vega, L.A.3
-
43
-
-
33748712013
-
Parallel algorithm for setting WIP levels for multi-product CONWIP system
-
Wang, L. and Prabhu, V., Parallel algorithm for setting WIP levels for multi-product CONWIP system. Int. J. Prod. Res., 2006, 44, 4681-4793.
-
(2006)
Int. J. Prod. Res
, vol.44
, pp. 4681-4793
-
-
Wang, L.1
Prabhu, V.2
-
44
-
-
0024055865
-
Scheduling semiconductor wafer fabrication
-
Wein, L.M., Scheduling semiconductor wafer fabrication. IEEE Trans. Semiconduct. Manuf., 1988, 1, 115-130.
-
(1988)
IEEE Trans. Semiconduct. Manuf
, vol.1
, pp. 115-130
-
-
Wein, L.M.1
-
45
-
-
0026869951
-
The relationship between yield and cycle time in semiconductor wafer fabrication
-
Wein, L.M., The relationship between yield and cycle time in semiconductor wafer fabrication. IEEE Trans. Semiconduct. Manuf., 1992, 5, 156-158.
-
(1992)
IEEE Trans. Semiconduct. Manuf
, vol.5
, pp. 156-158
-
-
Wein, L.M.1
-
47
-
-
33646191396
-
Dispatching in semiconductor fabs with machine-dedication features
-
Wu, M.C., Huang, Y.L. and Yang, K.F., Dispatching in semiconductor fabs with machine-dedication features. Int. J. Adv. Manuf. Tech., 2006, 28, 978-984.
-
(2006)
Int. J. Adv. Manuf. Tech
, vol.28
, pp. 978-984
-
-
Wu, M.C.1
Huang, Y.L.2
Yang, K.F.3
-
48
-
-
0036885562
-
-
Yu, C.S., A GP-AHP method for solving group decision-making fuzzy AHP problems. Comput. Oper. Res., 2002, 29, 1969-2001.
-
Yu, C.S., A GP-AHP method for solving group decision-making fuzzy AHP problems. Comput. Oper. Res., 2002, 29, 1969-2001.
-
-
-
-
49
-
-
0002425683
-
The analytic hierarchy process- a survey of the method and its applications
-
Zahedi, F., The analytic hierarchy process- a survey of the method and its applications. Interface, 1986, 16, 96-108.
-
(1986)
Interface
, vol.16
, pp. 96-108
-
-
Zahedi, F.1
|