메뉴 건너뛰기





Volumn 2, Issue , 1998, Pages 997-1003

WIP evolution of a semiconductor factory after a bottleneck workcenter breakdown

Author keywords

[No Author keywords available]

Indexed keywords

PROCESS ENGINEERING; PRODUCTION CONTROL; PRODUCTION ENGINEERING; QUEUEING THEORY; SEMICONDUCTOR DEVICE MANUFACTURE;

EID: 0032265912     PISSN: 02750708     EISSN: None     Source Type: Conference Proceeding    
DOI: None     Document Type: Conference Paper
Times cited : (30)

References (7)
  • Reference 정보가 존재하지 않습니다.

* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.