메뉴 건너뛰기




Volumn 30, Issue 1, 1998, Pages 31-39

Base-stock control for single-product tandem make-to-stock systems

Author keywords

[No Author keywords available]

Indexed keywords

APPROXIMATION THEORY; COMPUTER SIMULATION; DECISION MAKING; DECISION THEORY; MARKOV PROCESSES; OPTIMIZATION; PRODUCTION CONTROL;

EID: 0031678025     PISSN: 0740817X     EISSN: 15458830     Source Type: Journal    
DOI: 10.1080/07408179808966435     Document Type: Article
Times cited : (18)

References (21)
  • 1
    • 0025564738 scopus 로고
    • Analysis of a kanban discipline for cell coordination in production lines. I
    • Mitra, D., and Mitrani, I., (1990) Analysis of a kanban discipline for cell coordination in production lines. I. Management Science, 36, 1548–1566.
    • (1990) Management Science , vol.36 , pp. 1548-1566
    • Mitra, D.1    Mitrani, I.2
  • 2
    • 0029288838 scopus 로고
    • A comparison of alternative kanban control mechanisms, I, II
    • Muckstadt, J.A., and Tayur, S.R., (1995) A comparison of alternative kanban control mechanisms, I, II. HE Transactions, 27 (2), 140–161.
    • (1995) HE Transactions , vol.27 , Issue.2 , pp. 140-161
    • Muckstadt, J.A.1    Tayur, S.R.2
  • 3
    • 0026223819 scopus 로고
    • Analysis of a kanban discipline for cell coordination in production lines. II. Stochastic demands
    • Mitra, D., and. Mitrani, I., (1991) Analysis of a kanban discipline for cell coordination in production lines. II. Stochastic demands. Operations Research, 39, 807–823.
    • (1991) Operations Research , vol.39 , pp. 807-823
    • Mitra, D.1    Mitrani, I.2
  • 4
    • 0000167230 scopus 로고
    • Release policies for assembly systems
    • Duenyas, I., and Keblis, M., (1995) Release policies for assembly systems. HE Transactions, II, 507–518.
    • (1995) HE Transactions, II , pp. 507-518
    • Duenyas, I.1    Keblis, M.2
  • 6
    • 33746011471 scopus 로고
    • Determining the number of kanbans and lotsizes in a generic kanban system a simulated annealing approach
    • Chang, T.M., and Yih, Y., (1994) Determining the number of kanbans and lotsizes in a generic kanban system a simulated annealing approach. International Journal of Production Research, 32, (8), 1991–2004.
    • (1994) International Journal of Production Research , vol.32 , Issue.8 , pp. 1991-2004
    • Chang, T.M.1    Yih, Y.2
  • 7
    • 0027353436 scopus 로고
    • Determining the number of kanbans in multi-item just-in-time systems
    • Askin, R.G., Mitsawi, M.G., and Goldberg, J.B., (1993) Determining the number of kanbans in multi-item just-in-time systems. HE Transactions, 25, (1), 89–98.
    • (1993) HE Transactions , vol.25 , Issue.1 , pp. 89-98
    • Askin, R.G.1    Mitsawi, M.G.2    Goldberg, J.B.3
  • 8
    • 0028439455 scopus 로고
    • Production planning for a multi-item, single-stage kanban system
    • Mitsawi, M.G., and Askin, R.G., (1994) Production planning for a multi-item, single-stage kanban system. International Journal of Production Research, 32 (5), 1173–1195.
    • (1994) International Journal of Production Research , vol.32 , Issue.5 , pp. 1173-1195
    • Mitsawi, M.G.1    Askin, R.G.2
  • 10
    • 0026119502 scopus 로고
    • Throughput of a constant work in process manufacturing line subject to failures
    • Hopp, W.J., and Spearman, M.L., (1991) Throughput of a constant work in process manufacturing line subject to failures. International Journal of Production Research, 29, 635–655.
    • (1991) International Journal of Production Research , vol.29 , pp. 635-655
    • Hopp, W.J.1    Spearman, M.L.2
  • 11
    • 0027647549 scopus 로고
    • Characterizing the output process of a CONWIP line with deterministic processing and random
    • Duenyas, I., Hopp, W.J., and Spearman, M.L., (1993) Characterizing the output process of a CONWIP line with deterministic processing and random. Management Science, 39, 975–988.
    • (1993) Management Science , vol.39 , pp. 975-988
    • Duenyas, I.1    Hopp, W.J.2    Spearman, M.L.3
  • 12
    • 0027647549 scopus 로고
    • Characterizing the output process of a CONWIP line with deterministic processing and random outages
    • Duenyas, I., and Hopp, W.J., (1993) Characterizing the output process of a CONWIP line with deterministic processing and random outages. Management Science, 39, 975–988.
    • (1993) Management Science , vol.39 , pp. 975-988
    • Duenyas, I.1    Hopp, W.J.2
  • 13
    • 0028457112 scopus 로고
    • Estimating the throughput of a cyclic assembly system
    • Duenyas, I., (1994) Estimating the throughput of a cyclic assembly system. International Journal of Production Research, 32, 1403–1419.
    • (1994) International Journal of Production Research , vol.32 , pp. 1403-1419
    • Duenyas, I.1
  • 14
    • 0011525421 scopus 로고
    • Service levels in multistage MRP and base stock controlled production systems
    • Fandel, G., Gulledge, T. and Jones, A. (eds, Springer, Berlin
    • Buzacott, J.A., Price, S., and Shanthikumar, J.G., (1992) Service levels in multistage MRP and base stock controlled production systems, in New Directions for Operations Research in Manufacturing, Fandel, G., Gulledge, T. and Jones, A. (eds), Springer, Berlin, pp. 445–463.
    • (1992) New Directions for Operations Research in Manufacturing , pp. 445-463
    • Buzacott, J.A.1    Price, S.2    Shanthikumar, J.G.3
  • 16
    • 0026923203 scopus 로고
    • Tandem queues with planned inventories
    • Lee, Y.J., and Zipkin, P., (1992) Tandem queues with planned inventories. Operations Research, 40, 936–947.
    • (1992) Operations Research , vol.40 , pp. 936-947
    • Lee, Y.J.1    Zipkin, P.2
  • 17
    • 0000115495 scopus 로고    scopus 로고
    • Setting base stock levels using product-form queueing networks
    • Rubio, R., and Wein, L.M., (1996) Setting base stock levels using product-form queueing networks. Management Science, 42 (2), 259–268.
    • (1996) Management Science , vol.42 , Issue.2 , pp. 259-268
    • Rubio, R.1    Wein, L.M.2
  • 18
    • 0028496979 scopus 로고
    • A review of production planning and scheduling models in the semiconductor industry, Part II. Shop floor control
    • Uzsoy, R., Lee, C. Y., Martin-Vega, L.A., (1994) A review of production planning and scheduling models in the semiconductor industry, Part II. Shop floor control. HE Transactions on Scheduling and Logistics, 26, 44–55.
    • (1994) HE Transactions on Scheduling and Logistics , vol.26 , pp. 44-55
    • Uzsoy, R.1    Lee, C.Y.2    Martin-Vega, L.A.3
  • 19
    • 0028383504 scopus 로고
    • Optimal control of a two-station tandem production/inventory system
    • Veatch, M.H., and Wein, L.M., (1994) Optimal control of a two-station tandem production/inventory system. Operations Research, 42, 337–350.
    • (1994) Operations Research , vol.42 , pp. 337-350
    • Veatch, M.H.1    Wein, L.M.2
  • 20
    • 0028547827 scopus 로고
    • A simple release policy for networks of queues with controllable inputs
    • Duenyas, I., (1994) A simple release policy for networks of queues with controllable inputs. Operations Research, 42, 1162–1171.
    • (1994) Operations Research , vol.42 , pp. 1162-1171
    • Duenyas, I.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.