-
1
-
-
0004274964
-
-
American Production and Inventory Control Society, USA
-
APICS Dictionary, seventh ed. American Production and Inventory Control Society, USA.
-
APICS Dictionary, Seventh Ed.
-
-
-
4
-
-
0023979312
-
Theory and practice of load-oriented manufacturing control
-
Bechte W. Theory and practice of load-oriented manufacturing control. International Journal of Production Research. 26(3):1988a;375-395.
-
(1988)
International Journal of Production Research
, vol.26
, Issue.3
, pp. 375-395
-
-
Bechte, W.1
-
5
-
-
0037574733
-
Load oriented manufacturing control
-
Falls Church, VA, USA
-
Bechte, W., 1988b. Load oriented manufacturing control. In: 23rd Annual APICS Conference Proceeding. Falls Church, VA, USA, pp. 148-152.
-
(1988)
In: 23rd Annual APICS Conference Proceeding
, pp. 148-152
-
-
Bechte, W.1
-
6
-
-
0002479150
-
Load-oriented manufacturing control just-in-time production for job shops
-
Bechte W. Load-oriented manufacturing control just-in-time production for job shops. Production Planning. & Control 5(3):1994;292-307.
-
(1994)
Production Planning & Control
, vol.5
, Issue.3
, pp. 292-307
-
-
Bechte, W.1
-
8
-
-
0022748217
-
Performance analysis techniques for IC manufacturing lines
-
Burman D.Y., Gurrola-Gal F.J., Nozari A., Sathaye S., Sitarik J.P. Performance analysis techniques for IC manufacturing lines. AT. & T Technical Journal 65(4):1986;46-57.
-
(1986)
AT & T Technical Journal
, vol.65
, Issue.4
, pp. 46-57
-
-
Burman, D.Y.1
Gurrola-Gal, F.J.2
Nozari, A.3
Sathaye, S.4
Sitarik, J.P.5
-
10
-
-
0023981636
-
Empirical evaluation of a queueing network model for semiconductor wafer fabrication
-
Chen H., Harrison J.M., Mandelbaum A., Ackere A.V., Wein L.M. Empirical evaluation of a queueing network model for semiconductor wafer fabrication. Operations Research. 36(2):1988;202-215.
-
(1988)
Operations Research
, vol.36
, Issue.2
, pp. 202-215
-
-
Chen, H.1
Harrison, J.M.2
Mandelbaum, A.3
Ackere, A.V.4
Wein, L.M.5
-
12
-
-
0002958880
-
Simulation of VLSI manufacturing areas
-
December
-
Dayhoff, J.E., Atherton, R.W., 1984. Simulation of VLSI manufacturing areas. VLSI Design, December, pp. 84-92.
-
(1984)
VLSI Design
, pp. 84-92
-
-
Dayhoff, J.E.1
Atherton, R.W.2
-
13
-
-
0010353627
-
An integrated system for controlling shop loading and work flow
-
Enns S.T. An integrated system for controlling shop loading and work flow. International Journal of Production Research. 33(10):1995;2801-2820.
-
(1995)
International Journal of Production Research
, vol.33
, Issue.10
, pp. 2801-2820
-
-
Enns, S.T.1
-
16
-
-
0024102409
-
A scheduling rule for job shop release in semiconductor fabrication
-
Glassey C.R., Resende M.G.C. A scheduling rule for job shop release in semiconductor fabrication. Operations Research Letters. 7(5):1988b;213-217.
-
(1988)
Operations Research Letters
, vol.7
, Issue.5
, pp. 213-217
-
-
Glassey, C.R.1
Resende, M.G.C.2
-
21
-
-
0026944363
-
Control of batch processing systems in semiconductor wafer fabrication facilities
-
Gurnani, H., Anupindi, R., Akella, R., 1992. Control of batch processing systems in semiconductor wafer fabrication facilities. IEEE Transactions on Semiconductor Manufacturing 5 (4), 319-327.
-
(1992)
IEEE Transactions on Semiconductor Manufacturing
, vol.5
, Issue.4
, pp. 319-327
-
-
Gurnani, H.1
Anupindi, R.2
Akella, R.3
-
23
-
-
0001930641
-
Jobshop-like queueing systems
-
Jackson J.R. Jobshop-like queueing systems. Management Science. 10(1):1963;131-142.
-
(1963)
Management Science
, vol.10
, Issue.1
, pp. 131-142
-
-
Jackson, J.R.1
-
24
-
-
84985801774
-
Repetitive lots: Flow-time reductions through sequencing and dynamic batch sizing
-
Jacobs F.R., Bragg D.J. Repetitive lots: Flow-time reductions through sequencing and dynamic batch sizing. Decision Sciences. 19:1988;281-294.
-
(1988)
Decision Sciences
, vol.19
, pp. 281-294
-
-
Jacobs, F.R.1
Bragg, D.J.2
-
25
-
-
0022128589
-
Lotsizing in multi-item multi-machine job shops
-
Karmarkar U.S., Kekre S., Kekre S. Lotsizing in multi-item multi-machine job shops. IIE Transactions. 17(3):1985;290-297.
-
(1985)
IIE Transactions
, vol.17
, Issue.3
, pp. 290-297
-
-
Karmarkar, U.S.1
Kekre, S.2
Kekre, S.3
-
28
-
-
0003834102
-
-
Prentice-Hall, Englewood Cliffs, NJ
-
Lazowaska, E.D., Zahorjan, J., Graham, G.S., Sevcik, K.C., 1984. Quantitative System Performance. Prentice-Hall, Englewood Cliffs, NJ.
-
(1984)
Quantitative System Performance
-
-
Lazowaska, E.D.1
Zahorjan, J.2
Graham, G.S.3
Sevcik, K.C.4
-
29
-
-
0001744740
-
Optimal control rules for scheduling job shops
-
Lou S.X.C. Optimal control rules for scheduling job shops. Annals of Operations Research. 17:1989;233-248.
-
(1989)
Annals of Operations Research
, vol.17
, pp. 233-248
-
-
Lou, S.X.C.1
-
32
-
-
0013588699
-
Waiting time distribution in a Poisson queue with a general bulk service rule
-
Medhi J. Waiting time distribution in a Poisson queue with a general bulk service rule. Management Science. 21(7):1975;777-782.
-
(1975)
Management Science
, vol.21
, Issue.7
, pp. 777-782
-
-
Medhi, J.1
-
33
-
-
84976808911
-
Simulation of a semiconductor manufacturing line
-
Miller D.J. Simulation of a semiconductor manufacturing line. Communications of the ACM. 33(10):1990;99-108.
-
(1990)
Communications of the ACM
, vol.33
, Issue.10
, pp. 99-108
-
-
Miller, D.J.1
-
34
-
-
0000688623
-
A general class of bulk queues with Poisson input
-
Neuts M.F. A general class of bulk queues with Poisson input. Annals of Mathematical Statistics. 38(3):1967;759-770.
-
(1967)
Annals of Mathematical Statistics
, vol.38
, Issue.3
, pp. 759-770
-
-
Neuts, M.F.1
-
35
-
-
0003463572
-
-
Wiley, New York
-
Montgomery, D.C., Peck, E.A., 1992. Introduction to Linear Regression Analysis, second ed. Wiley, New York.
-
(1992)
Introduction to Linear Regression Analysis, Second Ed.
-
-
Montgomery, D.C.1
Peck, E.A.2
-
36
-
-
0029341463
-
The use of upstream and downstream information in scheduling semiconductor batch operations
-
Robinson J.K., Flower J.W., Bard J.F. The use of upstream and downstream information in scheduling semiconductor batch operations. International Journal of Production Research. 33(7):1995;1849-1869.
-
(1995)
International Journal of Production Research
, vol.33
, Issue.7
, pp. 1849-1869
-
-
Robinson, J.K.1
Flower, J.W.2
Bard, J.F.3
-
40
-
-
0026859945
-
Push and pull production systems: Issues and comparisons
-
Spearman M.L., Zazanis M.A. Push and pull production systems: Issues and comparisons. Operational Research. 40(3):1992;521-532.
-
(1992)
Operational Research
, vol.40
, Issue.3
, pp. 521-532
-
-
Spearman, M.L.1
Zazanis, M.A.2
-
41
-
-
21844517678
-
From CAN-Q to MPX: Evolution of queuing software for manufacturing
-
Suri R., Diehl G.W.W., Treville S., Tomsicek M.J. From CAN-Q to MPX: Evolution of queuing software for manufacturing. Interfaces. 25(5):1995;128-150.
-
(1995)
Interfaces
, vol.25
, Issue.5
, pp. 128-150
-
-
Suri, R.1
Diehl, G.W.W.2
Treville, S.3
Tomsicek, M.J.4
-
42
-
-
84952240555
-
A review of production planning and scheduling models in the semiconductor industry. Part I: System characteristics, performance evalution and production planning
-
Uzsoy R., Lee C.Y., Martin-Vega L.A. A review of production planning and scheduling models in the semiconductor industry. Part I: System characteristics, performance evalution and production planning. IIE Transactions. 24(4):1992;47-60.
-
(1992)
IIE Transactions
, vol.24
, Issue.4
, pp. 47-60
-
-
Uzsoy, R.1
Lee, C.Y.2
Martin-Vega, L.A.3
-
43
-
-
0022678143
-
Approximating unreliable queuing networks under the assumption of exponentially
-
Vinod B., Altiok T. Approximating unreliable queuing networks under the assumption of exponentially. Journal of Operational Research Society. 37:1986;309-316.
-
(1986)
Journal of Operational Research Society
, vol.37
, pp. 309-316
-
-
Vinod, B.1
Altiok, T.2
-
45
-
-
0027648685
-
An improved methodology for real-time production decisions at batch-process work stations
-
Weng W.W., Leachman R.C. An improved methodology for real-time production decisions at batch-process work stations. IEEE Transactions on Semiconductor Manufacturing. 6(3):1993;219-225.
-
(1993)
IEEE Transactions on Semiconductor Manufacturing
, vol.6
, Issue.3
, pp. 219-225
-
-
Weng, W.W.1
Leachman, R.C.2
-
46
-
-
0020848139
-
The queueing network analyzer
-
Whitt W. The queueing network analyzer. The Bell System Technical Journal. 62(9):1983;2779-2815.
-
(1983)
The Bell System Technical Journal
, vol.62
, Issue.9
, pp. 2779-2815
-
-
Whitt, W.1
-
49
-
-
0030150598
-
Testing the robustness of two-boundary control policies in semiconductor manufacturing
-
Yan H., Lou S., Sethi S., Gardel A., Deosthali P. Testing the robustness of two-boundary control policies in semiconductor manufacturing. IEEE Transactions on Semiconductor Manufacturing. 9(2):1996;285-288.
-
(1996)
IEEE Transactions on Semiconductor Manufacturing
, vol.9
, Issue.2
, pp. 285-288
-
-
Yan, H.1
Lou, S.2
Sethi, S.3
Gardel, A.4
Deosthali, P.5
|