-
1
-
-
0030530698
-
Management fashion
-
Abrahamson, E. (1996), "Management fashion", Academy of Management Review, Vol. 21 No. 1, pp. 254-85.
-
(1996)
Academy of Management Review
, vol.21
, Issue.1
, pp. 254-85
-
-
Abrahamson, E.1
-
2
-
-
0013115080
-
-
Alarcón, L. A.A. Balkema Publishers Rotterdam
-
Alarcón, L. (Ed.) (1997), Lean Construction, A.A. Balkema Publishers, Rotterdam.
-
(1997)
Lean Construction
-
-
-
3
-
-
84866122553
-
-
"Assessing the impacts of implementing lean construction", Proceedings of the 13th Annual Conference of the International Group for Lean Construction (IGLC-13), Sydney, July, pp. 387-393
-
Alarcón, L., Diethelm, S., Rojo, O. and Calderon, R. (2005), "Assessing the impacts of implementing lean construction", Proceedings of the 13th Annual Conference of the International Group for Lean Construction (IGLC-13), Sydney, July, pp. 387-393.
-
(2005)
-
-
Alarcón, L.1
Diethelm, S.2
Rojo, O.3
Calderon, R.4
-
4
-
-
47249131479
-
-
"Simulation of buffering and batching practices in the interface detailing-fabrication - installation of hvac ductwork", Proceedings of the 12th Annual Conference of The International Group for Lean Construction, Elsinore, Denmark
-
Alves, T.C.L. and Tommelein, I.D. (2004), "Simulation of buffering and batching practices in the interface detailing-fabrication - installation of hvac ductwork", Proceedings of the 12th Annual Conference of The International Group for Lean Construction, Elsinore, Denmark.
-
(2004)
-
-
Alves, T.C.L.1
Tommelein, I.D.2
-
5
-
-
0037366641
-
Value stream analysis of a re-engineered construction supply chain
-
Arbulu, R.J., Tommelein, I.D., Walsh, K.D. and Hershauer, J.C. (2003), "Value stream analysis of a re-engineered construction supply chain", Building Research & Information, Vol. 31 No. 2, pp. 161-71.
-
(2003)
Building Research & Information
, vol.31
, Issue.2
, pp. 161-71
-
-
Arbulu, R.J.1
Tommelein, I.D.2
Walsh, K.D.3
Hershauer, J.C.4
-
6
-
-
47249084549
-
-
"Lean construction and EPC performance improvement", 1st International Workshop on Lean Construction, Espoo, Finland (reprinted in Alarcón, L., 1997, pp. 79-91)
-
Ballard, G. (1993), "Lean construction and EPC performance improvement", 1st International Workshop on Lean Construction, Espoo, Finland (reprinted in Alarcón, L., 1997, pp. 79-91).
-
(1993)
-
-
Ballard, G.1
-
7
-
-
47249147840
-
-
"The last planner system of production control", PhD thesis, University of Birmingham, Birmingham
-
Ballard, G. (2000), "The last planner system of production control", PhD thesis, University of Birmingham, Birmingham.
-
(2000)
-
-
Ballard, G.1
-
8
-
-
84993044173
-
Managing work flow on design projects: A case study
-
Ballard, G. (2002), "Managing work flow on design projects: a case study", Engineering, Construction and Architectural Management, Vol. 9 No. 3, pp. 284-91.
-
(2002)
Engineering, Construction and Architectural Management
, vol.9
, Issue.3
, pp. 284-91
-
-
Ballard, G.1
-
9
-
-
47249162281
-
-
"Construction: one type of project-based production system", Proceedings SCRI Forum Event Lean Construction: The Next Generation, January 19th, SCRI, University of Salford
-
Ballard, G. (2005), "Construction: one type of project-based production system", Proceedings SCRI Forum Event Lean Construction: The Next Generation, January 19th, SCRI, University of Salford.
-
(2005)
-
-
Ballard, G.1
-
10
-
-
11644288742
-
Shielding production: Essential step in production control
-
Ballard, G. and Howell, G. (1998), "Shielding production: essential step in production control", Journal of Construction Engineering and Management, Vol. 124 No. 1, pp. 11-17.
-
(1998)
Journal of Construction Engineering and Management
, vol.124
, Issue.1
, pp. 11-17
-
-
Ballard, G.1
Howell, G.2
-
11
-
-
0037362304
-
Lean project management
-
Ballard, G. and Howell, G.A. (2003a), "Lean project management", Building Research and Information, Vol. 31 No. 2, pp. 119-33.
-
(2003)
Building Research and Information
, vol.31
, Issue.2
, pp. 119-33
-
-
Ballard, G.1
Howell, G.A.2
-
12
-
-
47249153035
-
-
"An update on last planner", in Proceeding For the 11th Annual Conference of the International Group for Lean Construction (IGLC-11), Blacksburg, VA, USA, July 2003
-
Ballard, G. and Howell, G.A. (2003b), "An update on last planner", in Proceeding For the 11th Annual Conference of the International Group for Lean Construction (IGLC-11), Blacksburg, VA, USA, July 2003.
-
(2003)
-
-
Ballard, G.1
Howell, G.A.2
-
13
-
-
3242706628
-
Learning to see work flow: Application of lean production concepts to precast concrete fabrication
-
Ballard, G., Harper, N. and Zabelle, T. (2003), "Learning to see work flow: application of lean production concepts to precast concrete fabrication", Journal of Engineering, Construction and Architectural Management, Vol. 10 No. 1, pp. 6-14.
-
(2003)
Journal of Engineering, Construction and Architectural Management
, vol.10
, Issue.1
, pp. 6-14
-
-
Ballard, G.1
Harper, N.2
Zabelle, T.3
-
14
-
-
18744375222
-
-
"Discussion of 'improving labor flow reliability for better productivity as lean construction principle' by H. Randolph Thomas, Michael J. Horman, R. Edward Minchin Jr and Dong Chen", Discussion and Closures in the Journal of Construction Engineering and Management, May, pp. 615-16
-
Ballard, G., Koskela, L., Howell, G.A. and Tommelein, I.D. (2005), "Discussion of 'improving labor flow reliability for better productivity as lean construction principle' by H. Randolph Thomas, Michael J. Horman, R. Edward Minchin Jr and Dong Chen", Discussion and Closures in the Journal of Construction Engineering and Management, May, pp. 615-16.
-
(2005)
-
-
Ballard, G.1
Koskela, L.2
Howell, G.A.3
Tommelein, I.D.4
-
15
-
-
85053272542
-
Lean construction tools and techniques
-
Hellingsworth, B. Best, R. de Valence, G. Elsevier
-
Ballard, G., Tommelein, I., Koskela, L. and Howell, G. (2002), "Lean construction tools and techniques", in Hellingsworth, B., Best, R. and de Valence, G. (Eds), Design and Construction: Building in Value, Elsevier, pp. 227-55.
-
(2002)
Design and Construction: Building in Value
, pp. 227-55
-
-
Ballard, G.1
Tommelein, I.2
Koskela, L.3
Howell, G.4
-
16
-
-
0005179648
-
Tricks and trucks: A case study of organization concepts at work
-
Benders, J. (1999), "Tricks and trucks: a case study of organization concepts at work", The International Journal of Human Resource Management, Vol. 10 No. 4, pp. 624-37.
-
(1999)
The International Journal of Human Resource Management
, vol.10
, Issue.4
, pp. 624-37
-
-
Benders, J.1
-
17
-
-
0034019007
-
Leaning on lean: The reception of a management fashion in Germany
-
Benders, J. and van Bijsterveld, M. (2000), "Leaning on lean: the reception of a management fashion in Germany", New Technology, Work and Employment, Vol. 15 No. 1, pp. 50-64.
-
(2000)
New Technology, Work and Employment
, vol.15
, Issue.1
, pp. 50-64
-
-
Benders, J.1
Van Bijsterveld, M.2
-
19
-
-
21144461252
-
Lean production - The end of history?
-
Berggren, C. (1993), "Lean production - the end of history?", Work, Employment and Society, Vol. 7 No. 2, pp. 163-88.
-
(1993)
Work, Employment and Society
, vol.7
, Issue.2
, pp. 163-88
-
-
Berggren, C.1
-
21
-
-
0001811705
-
The Japanese at work: Illusions of the ideal
-
Briggs, P. (1988), "The Japanese at work: illusions of the ideal", Industrial Relations Journal, Vol. 19 No. 1, pp. 24-30.
-
(1988)
Industrial Relations Journal
, vol.19
, Issue.1
, pp. 24-30
-
-
Briggs, P.1
-
22
-
-
47249110538
-
-
Benchmarking of Labor-Intensive Construction Activities: Lean Construction and Fundamental Principles of Workforce Management, CIB Publication 276 (by Thomas, R., Horman, M., de Souza, U.E.L. and Zavrski, I.), International Council for Research and Innovation in Building and Construction (CIB), Rotterdam
-
CIB (2002), Benchmarking of Labor-Intensive Construction Activities: Lean Construction and Fundamental Principles of Workforce Management, CIB Publication 276 (by Thomas, R., Horman, M., de Souza, U.E.L. and Zavrski, I.), International Council for Research and Innovation in Building and Construction (CIB), Rotterdam.
-
(2002)
-
-
Cib1
-
23
-
-
47249133614
-
-
Application of Lean Manufacturing Principles to Construction. A Report to the Construction Industry Institute (CII no. 191), Diekmann, J., Krewedl, M., Balonick, J., Stewart, T. and Won, S. The University of Texas at Austin, TX
-
CII (2004), Application of Lean Manufacturing Principles to Construction. A Report to the Construction Industry Institute (CII no. 191), Diekmann, J., Krewedl, M., Balonick, J., Stewart, T. and Won, S. The University of Texas at Austin, TX.
-
(2004)
-
-
Cii1
-
24
-
-
1642587221
-
DePlan: A tool for integrated design management
-
Choo, H.J., Hammond, J., Tommelein, I.D., Austin, S.A. and Ballard, G. (2004), "DePlan: a tool for integrated design management", Automation in Construction, Vol. 13, pp. 313-26.
-
(2004)
Automation in Construction
, vol.13
, pp. 313-26
-
-
Choo, H.J.1
Hammond, J.2
Tommelein, I.D.3
Austin, S.A.4
Ballard, G.5
-
25
-
-
0036035970
-
Is 'lean' a universal production system?: Batch production in the automotive industry
-
Cooney, R. (2002), "Is 'lean' a universal production system?: Batch production in the automotive industry", International Journal of Operations & Production Management, Vol. 22 No. 10, pp. 1130-47.
-
(2002)
International Journal of Operations & Production Management
, vol.22
, Issue.10
, pp. 1130-47
-
-
Cooney, R.1
-
26
-
-
47249158382
-
-
Supply Chain Development for the Lean Enterprise, The Institute of Management Accountants Foundation for Applied Research, Montvale, NJ, Productivity Press, Portland, OR
-
Cooper, R. and Slagmulder, R. (1999), Supply Chain Development for the Lean Enterprise, The Institute of Management Accountants Foundation for Applied Research, Montvale, NJ, Productivity Press, Portland, OR.
-
(1999)
-
-
Cooper, R.1
Slagmulder, R.2
-
28
-
-
0003732501
-
-
Department of the Environment, Transportation and the Regions London
-
DETR (1998), Rethinking Construction, Department of the Environment, Transportation and the Regions, London.
-
(1998)
Rethinking Construction
-
-
Detr1
-
29
-
-
84977228549
-
From 'Fordism' to 'Toyotism'?
-
Dohse, K., Jürgens, U. and Malsch, T. (1985), "From 'Fordism' to 'Toyotism'?", The Social Organization of the Labor Process in the Japanese Automobile Industry, Politics and Society, Vol. 14 No. 2, pp. 115-46.
-
(1985)
The Social Organization of the Labor Process in the Japanese Automobile Industry, Politics and Society
, vol.14
, Issue.2
, pp. 115-46
-
-
Dohse, K.1
Jürgens, U.2
Malsch, T.3
-
30
-
-
33644599725
-
Consequences of competitive bidding in project-based production
-
Elfving, J.A., Tommelein, I.D. and Ballard, G. (2005), "Consequences of competitive bidding in project-based production", Journal of Purchasing & Supply Management, Vol. 11 No. 4, pp. 173-81.
-
(2005)
Journal of Purchasing & Supply Management
, vol.11
, Issue.4
, pp. 173-81
-
-
Elfving, J.A.1
Tommelein, I.D.2
Ballard, G.3
-
31
-
-
34547355105
-
Exploring change in construction: Supply chain management
-
Fernie, S. and Thorpe, A. (2007), "Exploring change in construction: supply chain management", Engineering, Construction and Architectural Management, Vol. 14 No. 4, pp. 319-33.
-
(2007)
Engineering, Construction and Architectural Management
, vol.14
, Issue.4
, pp. 319-33
-
-
Fernie, S.1
Thorpe, A.2
-
32
-
-
13944263231
-
Achieving lean design process: Improvement methodology
-
Freire, J. and Alarcón, L.F. (2002), "Achieving lean design process: improvement methodology", Journal of Construction Engineering and Management, Vol. 128 No. 3, pp. 248-56.
-
(2002)
Journal of Construction Engineering and Management
, vol.128
, Issue.3
, pp. 248-56
-
-
Freire, J.1
Alarcón, L.F.2
-
33
-
-
2342444152
-
An exploratory study on the applicability of process transparency in construction sites
-
Formoso, C.T., dos Santos, A. and Powell, J.A. (2002a), "An exploratory study on the applicability of process transparency in construction sites", Journal of Construction Research, Vol. 3 No. 1, pp. 35-54.
-
(2002)
Journal of Construction Research
, vol.3
, Issue.1
, pp. 35-54
-
-
Formoso, C.T.1
Dos Santos, A.2
Powell, J.A.3
-
34
-
-
1842699306
-
Material waste in building industry: Main causes and prevention
-
Formoso, C.T., Soibelman, L., De Cesare, C. and Isatto, E.L. (2002b), "Material waste in building industry: main causes and prevention", Journal of Construction Engineering and Management, July/August, pp. 316-25.
-
(2002)
Journal of Construction Engineering and Management
, pp. 316-25
-
-
Formoso, C.T.1
Soibelman, L.2
De Cesare, C.3
Isatto, E.L.4
-
35
-
-
15944418637
-
Embodying product and process flexibility to cope with challenging project deliveries
-
Gil, N., Tommelein, I.D., Stout, A. and Garrett, T. (2005), "Embodying product and process flexibility to cope with challenging project deliveries", Journal of Construction Engineering and Management, ASCE, April, pp. 439-48.
-
(2005)
Journal of Construction Engineering and Management, ASCE
, pp. 439-48
-
-
Gil, N.1
Tommelein, I.D.2
Stout, A.3
Garrett, T.4
-
36
-
-
0001641892
-
The missing arguments of lean construction
-
Green, S.D. (1999a), "The missing arguments of lean construction", Construction Management and Economics, Vol. 17, pp. 133-7.
-
(1999)
Construction Management and Economics
, vol.17
, pp. 133-7
-
-
Green, S.D.1
-
37
-
-
47249127513
-
-
"The dark side of lean construction: exploitation and ideology", Proceedings for the 7th Annual Conference of the International Group for Lean Construction (IGLC-7), Berkeley, CA
-
Green, S.D. (1999b), "The dark side of lean construction: exploitation and ideology", Proceedings for the 7th Annual Conference of the International Group for Lean Construction (IGLC-7), Berkeley, CA.
-
(1999)
-
-
Green, S.D.1
-
38
-
-
47249108830
-
-
"The future of lean construction - a brave new world", Proceedings for the 8th Annual Conference on Lean Construction (IGLC-8), Brighton
-
Green, S.D. (2000), "The future of lean construction - a brave new world", Proceedings for the 8th Annual Conference on Lean Construction (IGLC-8), Brighton.
-
(2000)
-
-
Green, S.D.1
-
39
-
-
33644516436
-
The human resource management implications of lean construction: Critical perspectives and conceptual chasms
-
Green, S.D. (2002), "The human resource management implications of lean construction: critical perspectives and conceptual chasms", Journal of Construction Research, Vol. 3 No. 1, pp. 147-66.
-
(2002)
Journal of Construction Research
, vol.3
, Issue.1
, pp. 147-66
-
-
Green, S.D.1
-
40
-
-
27344432024
-
Lean construction: Arenas of enactment, models of diffusion and the meaning of 'leanness'
-
Green, S.D. and May, S.C. (2005), "Lean construction: arenas of enactment, models of diffusion and the meaning of 'leanness'", Building Research & Information, Vol. 33 No. 6, pp. 498-511.
-
(2005)
Building Research & Information
, vol.33
, Issue.6
, pp. 498-511
-
-
Green, S.D.1
May, S.C.2
-
41
-
-
8844263039
-
Learning to evolve; A review of contemporary lean thinking
-
Hines, P., Holweg, M. and Rich, N. (2004), "Learning to evolve; a review of contemporary lean thinking", International Journal of Operations & Production Management, Vol. 24 No. 10, pp. 994-1011.
-
(2004)
International Journal of Operations & Production Management
, vol.24
, Issue.10
, pp. 994-1011
-
-
Hines, P.1
Holweg, M.2
Rich, N.3
-
42
-
-
47249126049
-
-
"Bringing light to the dark side of lean construction: a response to Stuart Green", Proceedings for the 7th Annual Conference of the International Group for Lean Construction (IGLC-7), Berkeley, CA
-
Howell, G. and Ballard, G. (1999), "Bringing light to the dark side of lean construction: a response to Stuart Green", Proceedings for the 7th Annual Conference of the International Group for Lean Construction (IGLC-7), Berkeley, CA.
-
(1999)
-
-
Howell, G.1
Ballard, G.2
-
43
-
-
13944253291
-
-
"Discussion of 'reducing varibility to improve performance as a lean construction principle', by H. Randolph Thomas, Michael J. Horman, Ubiraci Espinelli Lemes de Souza, and Ivica Zavrski", Discussion and Closures in the Journal of Construction Engineering and Management, March/April, pp. 299-300
-
Howell, G.A., Ballard, G., Tommelein, I.D. and Koskela, L. (2004), "Discussion of 'reducing varibility to improve performance as a lean construction principle', by H. Randolph Thomas, Michael J. Horman, Ubiraci Espinelli Lemes de Souza, and Ivica Zavrski", Discussion and Closures in the Journal of Construction Engineering and Management, March/April, pp. 299-300.
-
(2004)
-
-
Howell, G.A.1
Ballard, G.2
Tommelein, I.D.3
Koskela, L.4
-
44
-
-
47249158381
-
-
"Implementing lean: UK culture and system change, Proceedings for the 12th Annual Conference of the International Group for Lean Construction (IGLC-12), Elsinore, August
-
Johansen, E., Porter, G. and Greenwood, D. (2004), "Implementing lean: UK culture and system change, Proceedings for the 12th Annual Conference of the International Group for Lean Construction (IGLC-12), Elsinore, August.
-
(2004)
-
-
Johansen, E.1
Porter, G.2
Greenwood, D.3
-
45
-
-
47249156609
-
-
"Integrating lean design and lean construction: processes and methods", PhD thesis, Department of Civil Engineering, Technical University of Denmark, Lynyby, p. 286
-
Jørgensen, B. (2006), "Integrating lean design and lean construction: processes and methods", PhD thesis, Department of Civil Engineering, Technical University of Denmark, Lynyby, p. 286.
-
(2006)
-
-
Jørgensen, B.1
-
46
-
-
47249153804
-
Investigating the implementation of design and construction from a 'lean' perspective
-
Jørgensen, B. and Emmitt, S. (2008), "Investigating the implementation of design and construction from a 'lean' perspective", Construction Innovation: Information, Process, Management, Vol. 8 No. 2.
-
(2008)
Construction Innovation: Information, Process, Management
, vol.8
, Issue.2
-
-
Jørgensen, B.1
Emmitt, S.2
-
47
-
-
0005179649
-
Lean production in Japan: Myth and reality
-
Littek, W. Charles, T. Walter de Gruyter New York, NY
-
Jürgens, U. (1995), "Lean production in Japan: myth and reality", in Littek, W. and Charles, T. (Eds), The New Division of Labour: Emerging Forms of Work Organisation in International Perspective, Walter de Gruyter, New York, NY, pp. 349-66.
-
(1995)
The New Division of Labour: Emerging Forms of Work Organisation in International Perspective
, pp. 349-66
-
-
Jürgens, U.1
-
48
-
-
0030556322
-
Lean production in a changing competitive world: A Japanese perspective
-
Katayama, H. and Bennett, D. (1996), "Lean production in a changing competitive world: a Japanese perspective", International Journal of Operations & Production Management, Vol. 16 No. 2, pp. 8-23.
-
(1996)
International Journal of Operations & Production Management
, vol.16
, Issue.2
, pp. 8-23
-
-
Katayama, H.1
Bennett, D.2
-
49
-
-
47249136333
-
-
"Project micromanagement: practical site planning and management of work flow", Proceedings for the 12th Annual Conference of the International Group for Lean Construction (IGLC-12), Elsinore, August
-
Kenley, R. (2004), "Project micromanagement: practical site planning and management of work flow", Proceedings for the 12th Annual Conference of the International Group for Lean Construction (IGLC-12), Elsinore, August.
-
(2004)
-
-
Kenley, R.1
-
50
-
-
0005584387
-
Rhetoric and myth in management fashion
-
Kieser, A. (1997), "Rhetoric and myth in management fashion", Organization, Vol. 4 No. 1, pp. 49-74.
-
(1997)
Organization
, vol.4
, Issue.1
, pp. 49-74
-
-
Kieser, A.1
-
52
-
-
47249154204
-
-
"Lean production in construction", 1st International Workshop on Lean Construction, Espoo, Finland (reprinted in Alarcón, L., 1997, pp. 1-9)
-
Koskela, L. (1993), "Lean production in construction", 1st International Workshop on Lean Construction, Espoo, Finland (reprinted in Alarcón, L., 1997, pp. 1-9).
-
(1993)
-
-
Koskela, L.1
-
54
-
-
47249121119
-
-
"On new footnotes to shingo", Proceedings for the 9th Annual Conference of the International Group for Lean Construction (IGLC-9), Singapore
-
Koskela, L. (2001), "On new footnotes to shingo", Proceedings for the 9th Annual Conference of the International Group for Lean Construction (IGLC-9), Singapore.
-
(2001)
-
-
Koskela, L.1
-
55
-
-
33644516041
-
Should project management be based on theories of economics or production?
-
Koskela, L. and Ballard, G. (2006), "Should project management be based on theories of economics or production?", Building Research and Information, Vol. 34 No. 2, pp. 154-63.
-
(2006)
Building Research and Information
, vol.34
, Issue.2
, pp. 154-63
-
-
Koskela, L.1
Ballard, G.2
-
56
-
-
47249135886
-
-
"Project management reconceived from a production perspective", Proceedings, CIB World Congress, Toronto
-
Koskela, L., Ballard, G. and Howell, G. (2004), "Project management reconceived from a production perspective", Proceedings, CIB World Congress, Toronto.
-
(2004)
-
-
Koskela, L.1
Ballard, G.2
Howell, G.3
-
57
-
-
47249095231
-
-
"Towards lean design management", Proceedings for the 5th Annual Conference of the International Group for Lean Construction (IGLC-5), Gold Coast, Australia
-
Koskela, L., Ballard, G. and Tanhuanpää, V.P. (1997), "Towards lean design management", Proceedings for the 5th Annual Conference of the International Group for Lean Construction (IGLC-5), Gold Coast, Australia.
-
(1997)
-
-
Koskela, L.1
Ballard, G.2
Tanhuanpää, V.P.3
-
58
-
-
85056052718
-
The foundations of lean construction
-
Hellingsworth, B. Best, R. de Valence, G. Elsevier
-
Koskela, L., Howell, G., Ballard, G. and Tommelein, I. (2002), "The foundations of lean construction", in Hellingsworth, B., Best, R. and de Valence, G. (Eds), Design and Construction: Building in Value, Elsevier, pp. 211-26.
-
(2002)
Design and Construction: Building in Value
, pp. 211-26
-
-
Koskela, L.1
Howell, G.2
Ballard, G.3
Tommelein, I.4
-
59
-
-
42149148259
-
-
"On the metaphysics of production", Proceedings of the 13th Annual Conference of the International Group for Lean Construction, Sydney, July
-
Koskela, L. and Kagioglou, M. (2005), "On the metaphysics of production", Proceedings of the 13th Annual Conference of the International Group for Lean Construction, Sydney, July.
-
(2005)
-
-
Koskela, L.1
Kagioglou, M.2
-
60
-
-
33748796091
-
Lean processes for sustainable project delivery
-
Lapinski, A.R., Horman, M.J. and Riley, D.R. (2006), "Lean processes for sustainable project delivery", Journal of Construction Engineering and Management, ASCE, October, pp. 1083-91.
-
(2006)
Journal of Construction Engineering and Management, ASCE
, pp. 1083-91
-
-
Lapinski, A.R.1
Horman, M.J.2
Riley, D.R.3
-
62
-
-
84970395482
-
The transfer of management innovations from Japan
-
Lillrank, P. (1995), "The transfer of management innovations from Japan", Organization Studies, Vol. 16 No. 6, pp. 971-89.
-
(1995)
Organization Studies
, vol.16
, Issue.6
, pp. 971-89
-
-
Lillrank, P.1
-
63
-
-
8644251543
-
Harmonization between main contractors and subcontractors: A prerequisite for lean construction?
-
Miller, C.J.M., Packham, G.A. and Thomas, B.C. (2002), "Harmonization between main contractors and subcontractors: a prerequisite for lean construction?", Journal of Construction Research, Vol. 3 No. 1, pp. 67-82.
-
(2002)
Journal of Construction Research
, vol.3
, Issue.1
, pp. 67-82
-
-
Miller, C.J.M.1
Packham, G.A.2
Thomas, B.C.3
-
64
-
-
0009189392
-
The transfer of japanese management to alien institutional environments
-
Morris, J. and Wilkinson, B. (1995), "The transfer of japanese management to alien institutional environments", Journal of Management Studies, Vol. 32 No. 6, pp. 719-30.
-
(1995)
Journal of Management Studies
, vol.32
, Issue.6
, pp. 719-30
-
-
Morris, J.1
Wilkinson, B.2
-
66
-
-
17744374988
-
Moving from lean manufacturing to lean construction: Towards a common sociotechnological framework
-
Paez, O., Salem, S., Solomon, J. and Genaidy, A. (2005), "Moving from lean manufacturing to lean construction: towards a common sociotechnological framework", Human Factors and Ergonomics in Manufacturing, Vol. 15 No. 2, pp. 233-45.
-
(2005)
Human Factors and Ergonomics in Manufacturing
, vol.15
, Issue.2
, pp. 233-45
-
-
Paez, O.1
Salem, S.2
Solomon, J.3
Genaidy, A.4
-
67
-
-
47249084102
-
-
"Application of flow principles in the production management of construction sites", PhD thesis, School of Construction and Property Management, University of Salford, Salford
-
dos Santos, A. (1999), "Application of flow principles in the production management of construction sites", PhD thesis, School of Construction and Property Management, University of Salford, Salford.
-
(1999)
-
-
Dos Santos, A.1
-
70
-
-
84968099635
-
Japanese management philosophies: From the vacuous to the brilliant
-
Sullivan, J.J. (1992), "Japanese management philosophies: from the vacuous to the brilliant", California Management Review, Vol. 34 No. 2, pp. 66-87.
-
(1992)
California Management Review
, vol.34
, Issue.2
, pp. 66-87
-
-
Sullivan, J.J.1
-
71
-
-
47249091639
-
-
"New tools for lean construction", 1st International Workshop on Lean Construction. Espoo, Finlan (reprinted in Alarcón, L., 1997, pp. 335-41)
-
Tanskanen, K., Wegelius, T. and Nyman, H. (1993), "New tools for lean construction", 1st International Workshop on Lean Construction. Espoo, Finlan (reprinted in Alarcón, L., 1997, pp. 335-41).
-
(1993)
-
-
Tanskanen, K.1
Wegelius, T.2
Nyman, H.3
-
72
-
-
13944264322
-
Reducing variability to improve performance as a lean construction principle
-
Thomas, H.R., Horman, M.J., de Souza, U.E.L. and Zavrski, I. (2002), "Reducing variability to improve performance as a lean construction principle", Journal of Construction Engineering and Management, ASCE, March/April, pp. 144-54.
-
(2002)
Journal of Construction Engineering and Management, ASCE
, pp. 144-54
-
-
Thomas, H.R.1
Horman, M.J.2
De Souza, U.E.L.3
Zavrski, I.4
-
73
-
-
12344327099
-
Improving labor flow reliability for better productivity as lean construction principle
-
Thomas, H.R., Horman, M.J., Minchin, R.E. Jr and Chen, D. (2003), "Improving labor flow reliability for better productivity as lean construction principle", Journal of Construction Engineering and Management, ASCE, May/June, pp. 251-61.
-
(2003)
Journal of Construction Engineering and Management, ASCE
, pp. 251-61
-
-
Thomas, H.R.1
Horman, M.J.2
Jr, E.M.R.3
Chen, D.4
-
74
-
-
47249108829
-
-
Closure to "Reducing varibility to improve performance as a lean construction principle", by H. Thomas, H.R., Horman, M.J., de Souza, U.E.L. and Zavrski, I., Discussion and Closures in the Journal of Construction Engineering and Management, ASCE, March/April, pp. 300-301
-
Thomas, H.R., Horman, M.J., de Souza, U.E.L. and Zavrski, I. (2004), Closure to "Reducing varibility to improve performance as a lean construction principle", by H. Thomas, H.R., Horman, M.J., de Souza, U.E.L. and Zavrski, I., Discussion and Closures in the Journal of Construction Engineering and Management, ASCE, March/April, pp. 300-301.
-
(2004)
-
-
Thomas, H.R.1
Horman, M.J.2
De Souza, U.E.L.3
Zavrski, I.4
-
75
-
-
47249095607
-
-
"Closure to 'Reducing varibility to improve performance as a lean construction principle' by H. Randolph Thomas, Michael J. Horman, Ubiraci Espinelli Lemes de Souza, and Ivica Zavrski", Discussion and Closures in the Journal of Construction Engineering and Management, May, pp. 616-7
-
Thomas, H.R., Horman, M.J., Minchin, R.E. Jr and Chen, D. (2005), "Closure to 'Reducing varibility to improve performance as a lean construction principle' by H. Randolph Thomas, Michael J. Horman, Ubiraci Espinelli Lemes de Souza, and Ivica Zavrski", Discussion and Closures in the Journal of Construction Engineering and Management, May, pp. 616-7.
-
(2005)
-
-
Thomas, H.R.1
Horman, M.J.2
Jr, E.M.R.3
Chen, D.4
-
76
-
-
47249157955
-
Lean construction experiments using discrete-event simulation: Techniques and tools for process re-engineering?
-
Special issue on Construction Process Re-engineering
-
Tommelein, I.D. (1999), "Lean construction experiments using discrete-event simulation: techniques and tools for process re-engineering? ", International Journal of Computer-Integrated Design and Construction, CIDAC, Special issue on Construction Process Re-engineering, Vol. 1 No. 2, pp. 53-63.
-
(1999)
International Journal of Computer-Integrated Design and Construction, CIDAC
, vol.1
, Issue.2
, pp. 53-63
-
-
Tommelein, I.D.1
-
77
-
-
0032645520
-
Parade game: Impact of flow variability on trade performance
-
Tommelein, I.D., Riley, D.R. and Howell, G.A. (1999), "Parade game: impact of flow variability on trade performance", Journal of Construction Engineering and Management, Vol. 125 No. 5, pp. 304-10.
-
(1999)
Journal of Construction Engineering and Management
, vol.125
, Issue.5
, pp. 304-10
-
-
Tommelein, I.D.1
Riley, D.R.2
Howell, G.A.3
-
78
-
-
47249134872
-
-
"Use of work structuring to increase performance of project-based production systems", PhD thesis, University of California, Berkeley, CA
-
Tsao, C. (2005), "Use of work structuring to increase performance of project-based production systems", PhD thesis, University of California, Berkeley, CA.
-
(2005)
-
-
Tsao, C.1
-
79
-
-
13944269909
-
Work structuring to achieve integrated product-process design
-
Tsao, C., Tommelein, I., Swanlund, E. and Howell, A. (2004), "Work structuring to achieve integrated product-process design", Journal of Construction Engineering and Management, Vol. 130 No. 6, pp. 780-9.
-
(2004)
Journal of Construction Engineering and Management
, vol.130
, Issue.6
, pp. 780-9
-
-
Tsao, C.1
Tommelein, I.2
Swanlund, E.3
Howell, A.4
-
80
-
-
47249097344
-
-
"The design and implementation of product development process models in construction companies", PhD thesis, University of Salford, Salford
-
Tzortzopoulos, P. (2004), "The design and implementation of product development process models in construction companies", PhD thesis, University of Salford, Salford.
-
(2004)
-
-
Tzortzopoulos, P.1
-
81
-
-
47249144588
-
-
"Roles of supply chain management in construction", in Proceedings for the 7th Annual Conference of The International Group for Lean Construction (IGLC-7), Berkeley, CA
-
Vrijhoef, R. and Koskela, L. (1999), "Roles of supply chain management in construction", in Proceedings for the 7th Annual Conference of The International Group for Lean Construction (IGLC-7), Berkeley, CA.
-
(1999)
-
-
Vrijhoef, R.1
Koskela, L.2
-
82
-
-
0034391514
-
The four roles of supply chain management in construction
-
Vrijhoef, R. and Koskela, L. (2000), "The four roles of supply chain management in construction", European Journal of Purchasing & Supply Management, Vol. 6 Nos 3-4, pp. 169-78.
-
(2000)
European Journal of Purchasing & Supply Management
, vol.6
, Issue.34
, pp. 169-78
-
-
Vrijhoef, R.1
Koskela, L.2
-
83
-
-
47249147839
-
-
"A critical review of construction as a project-based industry: identifying paths towards a project-independent approach to construction", Proceedings of the CIB Joint Symposium, "Combining Forces - Advancing Facilities Management and Construction through Innovation", VTT, Helsinki
-
Vrijhoef, R. and Koskela, L. (2005), "A critical review of construction as a project-based industry: identifying paths towards a project-independent approach to construction", Proceedings of the CIB Joint Symposium, "Combining Forces - Advancing Facilities Management and Construction through Innovation", VTT, Helsinki.
-
(2005)
-
-
Vrijhoef, R.1
Koskela, L.2
-
84
-
-
47249122423
-
-
"Understanding construction supply chains: a multiple theoretical approach to inter-organizational relationships in construction", Proceedings for the 11th Annual Conference of the International Group for Lean Construction (IGLC-11), Blacksburg, Virginia, USA
-
Vrijhoef, R., Koskela, L. and Voordijk, H. (2003), "Understanding construction supply chains: a multiple theoretical approach to inter-organizational relationships in construction", Proceedings for the 11th Annual Conference of the International Group for Lean Construction (IGLC-11), Blacksburg, Virginia, USA.
-
(2003)
-
-
Vrijhoef, R.1
Koskela, L.2
Voordijk, H.3
-
85
-
-
85015160103
-
The iron fist in the velvet glove: Management and organization in Japanese manufacturing transplants in Wales
-
Wilkinson, B., Morris, J. and Munday, M. (1995), "The iron fist in the velvet glove: management and organization in Japanese manufacturing transplants in Wales", Journal of Management Studies, Vol. 32 No. 6, pp. 819-30.
-
(1995)
Journal of Management Studies
, vol.32
, Issue.6
, pp. 819-30
-
-
Wilkinson, B.1
Morris, J.2
Munday, M.3
-
86
-
-
84980272411
-
Power, control and the kanban
-
Wilkinson, B. and Oliver, N. (1989), "Power, control and the kanban", Journal of Management Studies, Vol. 26 No. 1, pp. 47-58.
-
(1989)
Journal of Management Studies
, vol.26
, Issue.1
, pp. 47-58
-
-
Wilkinson, B.1
Oliver, N.2
-
87
-
-
84973758350
-
Management practice or structural factors: The case of America versus Japan in the car industry
-
Williams, K., Haslam, C., Johal, S., Williams, J., Adcroft, A. and Willis, R. (1995), "Management practice or structural factors: the case of America versus Japan in the car industry", Economic and Industrial Democracy, Vol. 16 No. 1, pp. 9-37.
-
(1995)
Economic and Industrial Democracy
, vol.16
, Issue.1
, pp. 9-37
-
-
Williams, K.1
Haslam, C.2
Johal, S.3
Williams, J.4
Adcroft, A.5
Willis, R.6
-
88
-
-
27344446805
-
Construction as production by projects
-
Kazi, S. VTT Helsinki
-
Winch, G.M. (2005), "Construction as production by projects", in Kazi, S. (Ed.), Learning from Experience: New Challenges, Theories and Practices in Construction, in Proceedings of the CIB Joint Symposium, "Combining Forces - Advancing Facilities Management and Construction through Innovation", Vol. 7, VTT, Helsinki, pp. 25-41.
-
(2005)
Learning from Experience: New Challenges, Theories and Practices in Construction, in Proceedings of the CIB Joint Symposium, "combining Forces - Advancing Facilities Management and Construction Through Innovation"
, vol.7
, pp. 25-41
-
-
Winch, G.M.1
-
89
-
-
33644549419
-
Towards a theory of construction as production by projects
-
Winch, G.M. (2006), "Towards a theory of construction as production by projects", Building Research and Information, Vol. 34 No. 2, pp. 164-74.
-
(2006)
Building Research and Information
, vol.34
, Issue.2
, pp. 164-74
-
-
Winch, G.M.1
-
91
-
-
0003463029
-
-
Harper Business New York, NY
-
Womack, J.P., Jones, D.T. and Roos, D. (1990), The Machine That Changed the World: The Story of Lean Production, Harper Business, New York, NY.
-
(1990)
The Machine That Changed the World: The Story of Lean Production
-
-
Womack, J.P.1
Jones, D.T.2
Roos, D.3
|