-
1
-
-
85056064846
-
Considerations for streamlining a vertically integrated company: A case study
-
August, National University of Singapore
-
Akel, N.G., Boyers, J.C., Tommelein, I.D., Walsh, K.D. and Hershauer, J.C. (2001) Considerations for streamlining a vertically integrated company: a case study. In: Proceedings 9th Annual Conference of the International Group for Lean Construction (IGLC-9), 6-8 August, National University of Singapore.
-
(2001)
Proceedings 9Th Annual Conference of the International Group for Lean Construction (IGLC-9)
, pp. 6-8
-
-
Akel, N.G.1
Boyers, J.C.2
Tommelein, I.D.3
Walsh, K.D.4
Hershauer, J.C.5
-
6
-
-
0004011301
-
-
PhD Dissertation, Dept. of Civil Engineering, University of Birmingham, U.K
-
Ballard, G. (2000b) Last Planner System of Production Control. PhD Dissertation, Dept. of Civil Engineering, University of Birmingham, U.K. www.leanconstruction.org
-
(2000)
Last Planner System of Production Control
-
-
Ballard, G.1
-
7
-
-
2342418968
-
Implementing lean construction: Stabilizing work flow
-
Pontificia University Catolica de Chile, Santiago, September
-
Ballard, G. and Howell, G. (1994) Implementing lean construction: stabilizing work flow. In: Proceedings 2nd Annual Conference on Lean Construction. Pontificia University Catolica de Chile, Santiago, September. www.vtt.fi/rte/lean/santiago.htm
-
(1994)
Proceedings 2Nd Annual Conference on Lean Construction
-
-
Ballard, G.1
Howell, G.2
-
8
-
-
11644288742
-
Shielding production: Essential step in production control
-
ASCE
-
Ballard, G. and Howell, G. (1998) Shielding production: essential step in production control. Journal of Construction Engineering and Management, ASCE, 124 (1), 11-17.
-
(1998)
Journal of Construction Engineering and Management
, vol.124
, Issue.1
, pp. 11-17
-
-
Ballard, G.1
Howell, G.2
-
9
-
-
78649562455
-
Production system design in construction
-
6-8 August, National University of Singapore
-
Ballard, G., Koskela, L., Howell, G. and Zabelle, T. (2001) Production system design in construction. In: Proceedings 9th Annual Conference of the International Group for Lean Construction, 6-8 August, National University of Singapore. www.leanconstruction.org
-
(2001)
Proceedings 9Th Annual Conference of the International Group for Lean Construction
-
-
Ballard, G.1
Koskela, L.2
Howell, G.3
Zabelle, T.4
-
13
-
-
85018939326
-
Studies, standards and strategies in the Danish construction industry implementation of the lean principles
-
Lean Construction Institute, August, Berkeley, CA
-
Bertelsen, S., Christoffersen, A.K., Jensen, L.B. and Sander, D. (2001) Studies, standards and strategies in the Danish construction industry implementation of the lean principles. In: Getting it Started Keeping it Going, Proceedings of the 3rd Annual Lean Construction Congress, Lean Construction Institute, August, Berkeley, CA.
-
(2001)
Getting It Started Keeping It Going, Proceedings of the 3Rd Annual Lean Construction Congress
-
-
Bertelsen, S.1
Christoffersen, A.K.2
Jensen, L.B.3
Sander, D.4
-
14
-
-
84862306173
-
WorkMovePlan: Database for distributed planning and coordination
-
(IGLC-8), 17-19 July, Brighton, UK
-
Choo, H.J. and Tommelein, I.D. (2000) WorkMovePlan: database for distributed planning and coordination. In: Proceedings 8th Annual Conference of the International Group for Lean Construction (IGLC-8), 17-19 July, Brighton, UK. www.sussex.ac.uk/spru/imichair/iglc8/08.pdf
-
(2000)
Proceedings 8Th Annual Conference of the International Group for Lean Construction
-
-
Choo, H.J.1
Tommelein, I.D.2
-
16
-
-
0027805668
-
Interaction between subcycles: One key to improved methods
-
ASCE
-
Howell, G., Laufer, A. and Ballard, G. (1993) Interaction between subcycles: one key to improved methods. Journal of Construction Engineering and Management, ASCE, 119 (4), 714-28.
-
(1993)
Journal of Construction Engineering and Management
, vol.119
, Issue.4
, pp. 714-728
-
-
Howell, G.1
Laufer, A.2
Ballard, G.3
-
17
-
-
0031629966
-
The LAST DESIGNER’S Database-CAD for sourcing, procurement and planning
-
ASCE
-
Sadonio, M., Tommelein, I.D. and Zabelle, T.R. (1998) The LAST DESIGNER’S Database-CAD for sourcing, procurement and planning. In: Proceedings of Computing Congress’98, ASCE, pp. 364-75.
-
(1998)
Proceedings of Computing Congress’98
, pp. 364-375
-
-
Sadonio, M.1
Tommelein, I.D.2
Zabelle, T.R.3
-
18
-
-
0001817489
-
Toyota’s principles of set-based concurrent engineering
-
Winter
-
Sobek, D.K., Ward, A.C. and Liker, J.K. (1999) Toyota’s principles of set-based concurrent engineering. Sloan Management Review, Winter, 40 (2), 67-83.
-
(1999)
Sloan Management Review
, vol.40
, Issue.2
, pp. 67-83
-
-
Sobek, D.K.1
Ward, A.C.2
Liker, J.K.3
-
19
-
-
0000012732
-
Pull-driven scheduling for pipe-spool installation: Simulation of lean construction technique
-
ASCE
-
Tommelein, I.D. (1998) Pull-driven scheduling for pipe-spool installation: simulation of lean construction technique. Journal of Construction Engineering and Management, ASCE, 124 (4), 279-88.
-
(1998)
Journal of Construction Engineering and Management
, vol.124
, Issue.4
, pp. 279-288
-
-
Tommelein, I.D.1
-
20
-
-
0002372299
-
Just-in-time concrete delivery: Mapping alternatives for vertical supply chain integration
-
July, Berkeley, CA
-
Tommelein, I.D. and Li, A.E.Y. (1999) Just-in-time concrete delivery: mapping alternatives for vertical supply chain integration. Proceedings 7th Annual Conference of the International Group for Lean Construction (IGLC-7), 26-8 July, Berkeley, CA, pp. 97-108.
-
(1999)
Proceedings 7Th Annual Conference of the International Group for Lean Construction (IGLC-7)
, vol.8-26
, pp. 97-108
-
-
Tommelein, I.D.1
Li, A.E.Y.2
-
21
-
-
0032645520
-
Parade game: Impact of work flow variability on trade performance
-
ASCE
-
Tommelein, I.D., Riley, D. and Howell, G.A. (1999) Parade game: impact of work flow variability on trade performance. Journal of Construction Engineering and Management, ASCE, 125 (5), 304-10.
-
(1999)
Journal of Construction Engineering and Management
, vol.125
, Issue.5
, pp. 304-310
-
-
Tommelein, I.D.1
Riley, D.2
Howell, G.A.3
-
23
-
-
69949094691
-
Case study for work structuring: Installation of metal door frames
-
University of Sussex, Brighton, UK
-
Tsao, C.C.Y., Tommelein, I.D. and Howell, G. (2000) Case study for work structuring: installation of metal door frames. In: Proceedings 8th Annual Conference of the International Group for Lean Construction, University of Sussex, Brighton, UK.
-
(2000)
Proceedings 8Th Annual Conference of the International Group for Lean Construction
-
-
Tsao, C.C.Y.1
Tommelein, I.D.2
Howell, G.3
-
25
-
-
2242430168
-
Understanding construction supply chains: An alternative interpretation
-
August, National University of Singapore
-
Vrijhoef, R., Koskela, L. and Howell, G. (2001) Understanding construction supply chains: an alternative interpretation. In: Proceedings 9th Annual Conference of the International Group for Lean Construction (IGLC-9), 6-8 August, National University of Singapore.
-
(2001)
Proceedings 9Th Annual Conference of the International Group for Lean Construction (IGLC-9)
, pp. 6-8
-
-
Vrijhoef, R.1
Koskela, L.2
Howell, G.3
-
26
-
-
0002533915
-
The second Toyota paradox: How delaying decisions can make better cars faster
-
Spring
-
Ward, A., Liker, J.K., Cristiano, J.J. and Sobek, D.K. II (1995). The second Toyota paradox: how delaying decisions can make better cars faster. Sloan Management Review, Spring, 36 (3), 43-61.
-
(1995)
Sloan Management Review
, vol.36
, Issue.3
, pp. 43-61
-
-
Ward, A.1
Liker, J.K.2
Cristiano, J.J.3
Sobek, D.K.4
|