Achieving lean design process: Improvement methodology

Author keywords

Construction industry; Design; Project management

Indexed keywords

ARCHITECTURAL DESIGN; EVALUATION; INFORMATION ANALYSIS; INFORMATION TECHNOLOGY; PRODUCT DEVELOPMENT; PROJECT MANAGEMENT; STANDARDIZATION; STRUCTURAL ANALYSIS; TECHNOLOGY TRANSFER;

EID: 13944263231     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0733-9364(2002)128:3(248)     Document Type: Article
Times cited : (129)

References (15)
  • 2
    • 4243316676 scopus 로고    scopus 로고
    • Training field personnel to identify waste and improvement opportunities
    • L. F. Alarcón, ed., Balkema, Rotterdam, The Netherlands
    • Alarcón, L. F. (1997). "Training field personnel to identify waste and improvement opportunities." Lean construction, L. F. Alarcón, ed., Balkema, Rotterdam, The Netherlands, 391-401.
    • (1997) Lean Construction , pp. 391-401
    • Alarcón, L.F.1
  • 3
    • 33744885201 scopus 로고
    • Manipulating the flow of design information to improve the programming of building design
    • Austin, S., Baldwin, A., and Newton, A. (1994). "Manipulating the flow of design information to improve the programming of building design." Constr. Manage. Econom., London, 12(5), 445-455.
    • (1994) Constr. Manage. Econom., London , vol.12 , Issue.5 , pp. 445-455
    • Austin, S.1    Baldwin, A.2    Newton, A.3
  • 4
    • 0040974637 scopus 로고
    • Northern California Construction Institute, Monterey, Calif.
    • Ballard, G. (1994). The last planner, Northern California Construction Institute, Monterey, Calif.
    • (1994) The Last Planner
    • Ballard, G.1
  • 5
    • 11644288742 scopus 로고    scopus 로고
    • Shielding production: Essential step in production control
    • Ballard, G., and Howell, G. (1998). "Shielding production: Essential step in production control." 7. Constr. Eng. Manage., 124(1), 11-17.
    • (1998) 7. Constr. Eng. Manage. , vol.124 , Issue.1 , pp. 11-17
    • Ballard, G.1    Howell, G.2
  • 6
    • 13944251405 scopus 로고    scopus 로고
    • On the agenda of design management research
    • International Group for Lean Construction
    • Ballard, G., and Koskela, L. (1998). "On the agenda of design management research." Proc., 6th Annual Conf., Int. Group for Lean Construction, International Group for Lean Construction, available at 〈http://www.ce.berkeley.edu/~tommelein/IGLC-6/BallardAndKoskela.pdf〉.
    • (1998) Proc., 6th Annual Conf., Int. Group for Lean Construction
    • Ballard, G.1    Koskela, L.2
  • 8
    • 13944273436 scopus 로고    scopus 로고
    • Developing a protocol for managing the design process in the building industry
    • International Group for Lean Construction
    • Formoso, C., Tzortzopoulos, P., Jobin, M., and Liedtke, R. (1998). "Developing a protocol for managing the design process in the building industry." Proc., 6th Annual Conf. Int. Group for Lean Construction, International Group for Lean Construction, available at 〈http://www.ce. berkeley.edu/~tommelein/IGLC-6/FormosoTzotzopoulosJobimLeidtke.pdf〉.
    • (1998) Proc., 6th Annual Conf. Int. Group for Lean Construction
    • Formoso, C.1    Tzortzopoulos, P.2    Jobin, M.3    Liedtke, R.4
  • 10
    • 0004573260 scopus 로고    scopus 로고
    • Fast or concurrent: The art of getting construction improved
    • L. F. Alarcón, ed., Balkema, Rotterdam, The Netherlands
    • Huovila, P., Koskela, L., and Lautanala, M. (1997). "Fast or concurrent: The art of getting construction improved." Lean construction, L. F. Alarcón, ed., Balkema, Rotterdam, The Netherlands, 143-159.
    • (1997) Lean Construction , pp. 143-159
    • Huovila, P.1    Koskela, L.2    Lautanala, M.3
  • 11
    • 8844258003 scopus 로고    scopus 로고
    • Towards lean design management
    • International Group for Lean Construction
    • Koskela, L., Ballard, G., and Tanhuanpaa, V. (1997). "Towards lean design management." Proc., 5th Annual Conf., Int. Group for Lean Construction, International Group for Lean Construction, 1-12, available at 〈http://www.web.bham.ac.uk/d.j.crook/lean/iglc5/lauri/lauri.htm〉.
    • (1997) Proc., 5th Annual Conf., Int. Group for Lean Construction , pp. 1-12
    • Koskela, L.1    Ballard, G.2    Tanhuanpaa, V.3
  • 12
    • 0002076415 scopus 로고    scopus 로고
    • On foundations of concurrent engineering
    • C. Anumba and N. Evbuomwan, eds., Institute of Structural Engineers, London
    • Koskela, L., and Huovila, P. (1997). "On foundations of concurrent engineering." Concurrent Engineering in Construction, CEC '97, C. Anumba and N. Evbuomwan, eds., Institute of Structural Engineers, London, 22-32.
    • (1997) Concurrent Engineering in Construction, CEC '97 , pp. 22-32
    • Koskela, L.1    Huovila, P.2
  • 15
    • 13944267560 scopus 로고    scopus 로고
    • Considerations on application of lean construction principles to design management
    • International Group for Lean Construction
    • Tzortzopoulos, P., and Formoso, C. (1999). "Considerations on application of lean construction principles to design management." Proc., 7th Annual Conf., Int. Group for Lean Construction, International Group for Lean Construction, 335-344, available at 〈http://www.ce.berkeley.edu/ ~tommelein/IGLC-7/PDF/Tzortzopoulos&Formoso.pdf〉.
    • (1999) Proc., 7th Annual Conf., Int. Group for Lean Construction , pp. 335-344
    • Tzortzopoulos, P.1    Formoso, C.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.