-
1
-
-
0035528752
-
Optimization of inspection intervals based on cost
-
Badía, F.G., Berrade, M.D. and Campos, C.A. (2001) Optimization of inspection intervals based on cost. Journal of Applied Probability, 38(4), 872-881.
-
(2001)
Journal of Applied Probability
, vol.38
, Issue.4
, pp. 872-881
-
-
Badía, F.G.1
Berrade, M.D.2
Campos, C.A.3
-
2
-
-
0036604622
-
Self-correcting inspection procedure under inspection errors
-
Ben-Gal, I., Herer, Y.T. and Raz, T. (2002). Self-correcting inspection procedure under inspection errors. IIE Transactions, 34, 529-540.
-
(2002)
IIE Transactions
, vol.34
, pp. 529-540
-
-
Ben-Gal, I.1
Herer, Y.T.2
Raz, T.3
-
3
-
-
0039065608
-
-
Ph.D. thesis, Graduate School of Business, Stanford University, Stanford, CA, USA
-
Fine, C.H. (1983) Quality control and learning in productive systems. Ph.D. thesis, Graduate School of Business, Stanford University, Stanford, CA, USA.
-
(1983)
Quality Control and Learning in Productive Systems
-
-
Fine, C.H.1
-
4
-
-
0004517006
-
A dichotomous search for a geometric random variable
-
Hassin, R. (1984) A dichotomous search for a geometric random variable. Operations Research, 32, 423-439.
-
(1984)
Operations Research
, vol.32
, pp. 423-439
-
-
Hassin, R.1
-
5
-
-
0042852880
-
Optimal inspection order when process failure rate is constant
-
He, Q.M., Gerchak, Y. and Grosfeld-Nir, A. (1996) Optimal inspection order when process failure rate is constant. International Journal of Reliability, Quality and Safety Engineering, 3(1), 25-41.
-
(1996)
International Journal of Reliability, Quality and Safety Engineering
, vol.3
, Issue.1
, pp. 25-41
-
-
He, Q.M.1
Gerchak, Y.2
Grosfeld-Nir, A.3
-
6
-
-
0342955672
-
Optimal amount of parallel inspection for finding the first nonconforming unit in a batch - An information theoretic approach
-
Herer, Y.T. and Raz, T. (2000) Optimal amount of parallel inspection for finding the first nonconforming unit in a batch - an information theoretic approach. Management Science, 46, 845-857.
-
(2000)
Management Science
, vol.46
, pp. 845-857
-
-
Herer, Y.T.1
Raz, T.2
-
7
-
-
0035340520
-
Optimal production run length and inspection schedules in a deteriorating production process
-
Kim, C.H., Hong, Y.S. and Chang, S.Y. (2001) Optimal production run length and inspection schedules in a deteriorating production process. IIE Transactions, 33(5), 421-426.
-
(2001)
IIE Transactions
, vol.33
, Issue.5
, pp. 421-426
-
-
Kim, C.H.1
Hong, Y.S.2
Chang, S.Y.3
-
8
-
-
0023412314
-
Simultaneous determination of production cycle and inspection schedules in a production system
-
Lee, H.L. and Rosenblatt, M.J. (1987) Simultaneous determination of production cycle and inspection schedules in a production system. Management Science, 33(9), 1125-1136.
-
(1987)
Management Science
, vol.33
, Issue.9
, pp. 1125-1136
-
-
Lee, H.L.1
Rosenblatt, M.J.2
-
9
-
-
0034149011
-
Economic optimization of off-line inspection
-
Raz, T., Herer, Y.T. and Grosfeld-Nir, A. (2000) Economic optimization of off-line inspection. IIE Transactions, 32, 205-217.
-
(2000)
IIE Transactions
, vol.32
, pp. 205-217
-
-
Raz, T.1
Herer, Y.T.2
Grosfeld-Nir, A.3
|