-
1
-
-
0040057968
-
The dynamics of software development project management: An integrative system dynamics perspective
-
Doctoral thesis, Massachusetts Institute of Technology, Cambridge, MA
-
Abdel-Hamid TK. 1984. The dynamics of software development project management: an integrative system dynamics perspective. Doctoral thesis, Massachusetts Institute of Technology, Cambridge, MA.
-
(1984)
-
-
Abdel-Hamid, T.K.1
-
3
-
-
0003307134
-
Why firefighting is never enough: Preserving high-quality product development
-
Black L, Repenning N. 2001. Why firefighting is never enough: preserving high-quality product development. System Dynamics Review 17(1): 33-62.
-
(2001)
System Dynamics Review
, vol.17
, Issue.1
, pp. 33-62
-
-
Black, L.1
Repenning, N.2
-
4
-
-
1942530583
-
Projects, pathogens, and incubation periods
-
Busby S, Hughes E. 2004. Projects, pathogens, and incubation periods. International Journal of Project Management 22(2): 425-434.
-
(2004)
International Journal of Project Management
, vol.22
, Issue.2
, pp. 425-434
-
-
Busby, S.1
Hughes, E.2
-
5
-
-
83755202997
-
Naval ship production: A claim settled and a framework built
-
Cooper K. 1980. Naval ship production: a claim settled and a framework built. Interfaces 10(6): 20-36.
-
(1980)
Interfaces
, vol.10
, Issue.6
, pp. 20-36
-
-
Cooper, K.1
-
6
-
-
0003285499
-
The rework cycle: Why projects are mismanaged
-
February: 5-7
-
Cooper K. 1993a. The rework cycle: why projects are mismanaged. PM Network February: 5-7.
-
(1993)
PM Network
-
-
Cooper, K.1
-
7
-
-
0346051307
-
The rework cycle: How it really works...and reworks
-
February: 25-28
-
Cooper K. 1993b. The rework cycle: how it really works...and reworks. PM Network February: 25-28.
-
(1993)
PM Network
-
-
Cooper, K.1
-
8
-
-
0001906688
-
The rework cycle: Benchmarks for the project managers
-
Cooper K. 1993c. The rework cycle: benchmarks for the project managers. Project Management Journal 14(1): 17-21.
-
(1993)
Project Management Journal
, vol.14
, Issue.1
, pp. 17-21
-
-
Cooper, K.1
-
9
-
-
0001975372
-
The $2,000 hour: How managers influence project performance through the rework cycle
-
Cooper K. 1994. The $2,000 hour: how managers influence project performance through the rework cycle. Project Management Journal 15(1): 11-24.
-
(1994)
Project Management Journal
, vol.15
, Issue.1
, pp. 11-24
-
-
Cooper, K.1
-
10
-
-
0036532702
-
Learning to learn, from past to future
-
Cooper K, Lyneis J, Bryant B. 2002. Learning to learn, from past to future. International Journal of Project Management 20(3): 213-219.
-
(2002)
International Journal of Project Management
, vol.20
, Issue.3
, pp. 213-219
-
-
Cooper, K.1
Lyneis, J.2
Bryant, B.3
-
11
-
-
84898572077
-
Overdue and over budget, over and over again; project management
-
Evans M. 2005. Overdue and over budget, over and over again; project management. The Economist 375(8430): 66.
-
(2005)
The Economist
, vol.375
, Issue.8430
, pp. 66
-
-
Evans, M.1
-
12
-
-
0003821310
-
The dynamics of project management: An investigation of the impacts of project process and coordination on performance
-
Doctoral thesis, Massachusetts Institute of Technology, Cambridge, MA
-
Ford D. 1995. The dynamics of project management: an investigation of the impacts of project process and coordination on performance. Doctoral thesis, Massachusetts Institute of Technology, Cambridge, MA.
-
(1995)
-
-
Ford, D.1
-
13
-
-
0346405507
-
A behavioral approach to feedback loop dominance analysis
-
Ford D. 1999. A behavioral approach to feedback loop dominance analysis. System Dynamics Review 15(1): 3-36.
-
(1999)
System Dynamics Review
, vol.15
, Issue.1
, pp. 3-36
-
-
Ford, D.1
-
14
-
-
0002132859
-
Modeling dynamic development processes
-
Ford D, Sterman J. 1998. Modeling dynamic development processes. System Dynamics Review 14(1): 31-68.
-
(1998)
System Dynamics Review
, vol.14
, Issue.1
, pp. 31-68
-
-
Ford, D.1
Sterman, J.2
-
15
-
-
0242269387
-
The liar's club: Impacts of concealment in concurrent development projects
-
Ford D, Sterman J. 2003a. The liar's club: impacts of concealment in concurrent development projects. Concurrent Engineering Research and Applications 111(3): 211-219.
-
(2003)
Concurrent Engineering Research and Applications
, vol.111
, Issue.3
, pp. 211-219
-
-
Ford, D.1
Sterman, J.2
-
16
-
-
0242301115
-
Overcoming the 90% syndrome: Iteration management in concurrent development projects
-
Ford D, Sterman J. 2003b. Overcoming the 90% syndrome: iteration management in concurrent development projects. Concurrent Engineering Research and Applications 111(3): 177-186.
-
(2003)
Concurrent Engineering Research and Applications
, vol.111
, Issue.3
, pp. 177-186
-
-
Ford, D.1
Sterman, J.2
-
18
-
-
0012349684
-
Beyond PM 101: Lessons for managing large development programs
-
Graham A. 2000. Beyond PM 101: lessons for managing large development programs. Project Management Journal 31(4): 7-18.
-
(2000)
Project Management Journal
, vol.31
, Issue.4
, pp. 7-18
-
-
Graham, A.1
-
20
-
-
15544370969
-
Design of robust new products under variability: Marketing meets design
-
Luo L, Kannan P, Besharati B, Azram S. 2005. Design of robust new products under variability: marketing meets design. Journal of Product Innovation Management 22(2005): 177-192.
-
(2005)
Journal of Product Innovation Management
, vol.22
, Issue.2005
, pp. 177-192
-
-
Luo, L.1
Kannan, P.2
Besharati, B.3
Azram, S.4
-
21
-
-
0001446357
-
Strategic management of complex projects: A case study using system dynamics
-
Lyneis F, Cooper K, Els S. 2001. Strategic management of complex projects: a case study using system dynamics. System Dynamics Review 17(3): 237-260.
-
(2001)
System Dynamics Review
, vol.17
, Issue.3
, pp. 237-260
-
-
Lyneis, F.1
Cooper, K.2
Els, S.3
-
24
-
-
33646509128
-
It's your move
-
Paul L. 2005. It's your move. PM Network 19(4): 34-38.
-
(2005)
PM Network
, vol.19
, Issue.4
, pp. 34-38
-
-
Paul, L.1
-
26
-
-
0035445043
-
Understanding fire fighting in new product development
-
Repenning N. 2001. Understanding fire fighting in new product development. Journal of Product Innovation Management 18: 265-300.
-
(2001)
Journal of Product Innovation Management
, vol.18
, pp. 265-300
-
-
Repenning, N.1
-
27
-
-
0031672864
-
System dynamics in project management: Assessing the impacts of client behavior on project performance
-
Rodrigues A, Williams TM. 1997. System dynamics in project management: assessing the impacts of client behavior on project performance. Journal of the Operational Research Society 49: 2-15.
-
(1997)
Journal of the Operational Research Society
, vol.49
, pp. 2-15
-
-
Rodrigues, A.1
Williams, T.M.2
-
29
-
-
15544381242
-
Exploring robust design capabilities, their role in creating global products, and their relationship to firm performance
-
Swan K, Kotabe M, Allred B. 2005. Exploring robust design capabilities, their role in creating global products, and their relationship to firm performance. The Journal of Product Innovation Management 22: 144-164.
-
(2005)
The Journal of Product Innovation Management
, vol.22
, pp. 144-164
-
-
Swan, K.1
Kotabe, M.2
Allred, B.3
-
31
-
-
33646531093
-
When good projects go bad, tipping point dynamics in development projects
-
Boston, MA, 17-21 July
-
Taylor T, Ford D, Johnson S. 2005. When good projects go bad, tipping point dynamics in development projects. In 2005 International System Dynamics Conference, Boston, MA, 17-21 July.
-
(2005)
2005 International System Dynamics Conference
-
-
Taylor, T.1
Ford, D.2
Johnson, S.3
|