메뉴 건너뛰기




Volumn 22, Issue 1, 2006, Pages 51-71

Tipping point failure and robustness in single development projects

Author keywords

[No Author keywords available]

Indexed keywords

PRODUCT DEVELOPMENT; PROJECT MANAGEMENT;

EID: 33646499160     PISSN: 08837066     EISSN: 10991727     Source Type: Journal    
DOI: 10.1002/sdr.330     Document Type: Article
Times cited : (64)

References (35)
  • 1
    • 0040057968 scopus 로고
    • The dynamics of software development project management: An integrative system dynamics perspective
    • Doctoral thesis, Massachusetts Institute of Technology, Cambridge, MA
    • Abdel-Hamid TK. 1984. The dynamics of software development project management: an integrative system dynamics perspective. Doctoral thesis, Massachusetts Institute of Technology, Cambridge, MA.
    • (1984)
    • Abdel-Hamid, T.K.1
  • 3
    • 0003307134 scopus 로고    scopus 로고
    • Why firefighting is never enough: Preserving high-quality product development
    • Black L, Repenning N. 2001. Why firefighting is never enough: preserving high-quality product development. System Dynamics Review 17(1): 33-62.
    • (2001) System Dynamics Review , vol.17 , Issue.1 , pp. 33-62
    • Black, L.1    Repenning, N.2
  • 5
    • 83755202997 scopus 로고
    • Naval ship production: A claim settled and a framework built
    • Cooper K. 1980. Naval ship production: a claim settled and a framework built. Interfaces 10(6): 20-36.
    • (1980) Interfaces , vol.10 , Issue.6 , pp. 20-36
    • Cooper, K.1
  • 6
    • 0003285499 scopus 로고
    • The rework cycle: Why projects are mismanaged
    • February: 5-7
    • Cooper K. 1993a. The rework cycle: why projects are mismanaged. PM Network February: 5-7.
    • (1993) PM Network
    • Cooper, K.1
  • 7
    • 0346051307 scopus 로고
    • The rework cycle: How it really works...and reworks
    • February: 25-28
    • Cooper K. 1993b. The rework cycle: how it really works...and reworks. PM Network February: 25-28.
    • (1993) PM Network
    • Cooper, K.1
  • 8
    • 0001906688 scopus 로고
    • The rework cycle: Benchmarks for the project managers
    • Cooper K. 1993c. The rework cycle: benchmarks for the project managers. Project Management Journal 14(1): 17-21.
    • (1993) Project Management Journal , vol.14 , Issue.1 , pp. 17-21
    • Cooper, K.1
  • 9
    • 0001975372 scopus 로고
    • The $2,000 hour: How managers influence project performance through the rework cycle
    • Cooper K. 1994. The $2,000 hour: how managers influence project performance through the rework cycle. Project Management Journal 15(1): 11-24.
    • (1994) Project Management Journal , vol.15 , Issue.1 , pp. 11-24
    • Cooper, K.1
  • 11
    • 84898572077 scopus 로고    scopus 로고
    • Overdue and over budget, over and over again; project management
    • Evans M. 2005. Overdue and over budget, over and over again; project management. The Economist 375(8430): 66.
    • (2005) The Economist , vol.375 , Issue.8430 , pp. 66
    • Evans, M.1
  • 12
    • 0003821310 scopus 로고
    • The dynamics of project management: An investigation of the impacts of project process and coordination on performance
    • Doctoral thesis, Massachusetts Institute of Technology, Cambridge, MA
    • Ford D. 1995. The dynamics of project management: an investigation of the impacts of project process and coordination on performance. Doctoral thesis, Massachusetts Institute of Technology, Cambridge, MA.
    • (1995)
    • Ford, D.1
  • 13
    • 0346405507 scopus 로고    scopus 로고
    • A behavioral approach to feedback loop dominance analysis
    • Ford D. 1999. A behavioral approach to feedback loop dominance analysis. System Dynamics Review 15(1): 3-36.
    • (1999) System Dynamics Review , vol.15 , Issue.1 , pp. 3-36
    • Ford, D.1
  • 14
    • 0002132859 scopus 로고    scopus 로고
    • Modeling dynamic development processes
    • Ford D, Sterman J. 1998. Modeling dynamic development processes. System Dynamics Review 14(1): 31-68.
    • (1998) System Dynamics Review , vol.14 , Issue.1 , pp. 31-68
    • Ford, D.1    Sterman, J.2
  • 15
    • 0242269387 scopus 로고    scopus 로고
    • The liar's club: Impacts of concealment in concurrent development projects
    • Ford D, Sterman J. 2003a. The liar's club: impacts of concealment in concurrent development projects. Concurrent Engineering Research and Applications 111(3): 211-219.
    • (2003) Concurrent Engineering Research and Applications , vol.111 , Issue.3 , pp. 211-219
    • Ford, D.1    Sterman, J.2
  • 16
    • 0242301115 scopus 로고    scopus 로고
    • Overcoming the 90% syndrome: Iteration management in concurrent development projects
    • Ford D, Sterman J. 2003b. Overcoming the 90% syndrome: iteration management in concurrent development projects. Concurrent Engineering Research and Applications 111(3): 177-186.
    • (2003) Concurrent Engineering Research and Applications , vol.111 , Issue.3 , pp. 177-186
    • Ford, D.1    Sterman, J.2
  • 18
    • 0012349684 scopus 로고    scopus 로고
    • Beyond PM 101: Lessons for managing large development programs
    • Graham A. 2000. Beyond PM 101: lessons for managing large development programs. Project Management Journal 31(4): 7-18.
    • (2000) Project Management Journal , vol.31 , Issue.4 , pp. 7-18
    • Graham, A.1
  • 21
    • 0001446357 scopus 로고    scopus 로고
    • Strategic management of complex projects: A case study using system dynamics
    • Lyneis F, Cooper K, Els S. 2001. Strategic management of complex projects: a case study using system dynamics. System Dynamics Review 17(3): 237-260.
    • (2001) System Dynamics Review , vol.17 , Issue.3 , pp. 237-260
    • Lyneis, F.1    Cooper, K.2    Els, S.3
  • 24
    • 33646509128 scopus 로고    scopus 로고
    • It's your move
    • Paul L. 2005. It's your move. PM Network 19(4): 34-38.
    • (2005) PM Network , vol.19 , Issue.4 , pp. 34-38
    • Paul, L.1
  • 26
    • 0035445043 scopus 로고    scopus 로고
    • Understanding fire fighting in new product development
    • Repenning N. 2001. Understanding fire fighting in new product development. Journal of Product Innovation Management 18: 265-300.
    • (2001) Journal of Product Innovation Management , vol.18 , pp. 265-300
    • Repenning, N.1
  • 27
    • 0031672864 scopus 로고    scopus 로고
    • System dynamics in project management: Assessing the impacts of client behavior on project performance
    • Rodrigues A, Williams TM. 1997. System dynamics in project management: assessing the impacts of client behavior on project performance. Journal of the Operational Research Society 49: 2-15.
    • (1997) Journal of the Operational Research Society , vol.49 , pp. 2-15
    • Rodrigues, A.1    Williams, T.M.2
  • 29
    • 15544381242 scopus 로고    scopus 로고
    • Exploring robust design capabilities, their role in creating global products, and their relationship to firm performance
    • Swan K, Kotabe M, Allred B. 2005. Exploring robust design capabilities, their role in creating global products, and their relationship to firm performance. The Journal of Product Innovation Management 22: 144-164.
    • (2005) The Journal of Product Innovation Management , vol.22 , pp. 144-164
    • Swan, K.1    Kotabe, M.2    Allred, B.3
  • 31
    • 33646531093 scopus 로고    scopus 로고
    • When good projects go bad, tipping point dynamics in development projects
    • Boston, MA, 17-21 July
    • Taylor T, Ford D, Johnson S. 2005. When good projects go bad, tipping point dynamics in development projects. In 2005 International System Dynamics Conference, Boston, MA, 17-21 July.
    • (2005) 2005 International System Dynamics Conference
    • Taylor, T.1    Ford, D.2    Johnson, S.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.