-
1
-
-
0003903703
-
-
Harvard Business School Press, Cambridge, MA
-
Amran, M. and Kulatilaka, N. (1999). Real options, managing strategic investment in an uncertain world, Harvard Business School Press, Cambridge, MA.
-
(1999)
Real Options, Managing Strategic Investment in an Uncertain World
-
-
Amran, M.1
Kulatilaka, N.2
-
5
-
-
83755202997
-
Naval ship production: A claim settled and a framework built
-
Cooper, K. G. (1980). "Naval ship production: A claim settled and a framework built." Interfaces, 10(6), 20-36.
-
(1980)
Interfaces
, vol.10
, Issue.6
, pp. 20-36
-
-
Cooper, K.G.1
-
6
-
-
13944278238
-
Risk management in capital projects
-
Austin, Tex.
-
Diekmann, J. E., Sewester, E. E., and Taher, K. (1988). "Risk management in capital projects." Construction Industry Institute Source Document 41. Austin, Tex.
-
(1988)
Construction Industry Institute Source Document
, vol.41
-
-
Diekmann, J.E.1
Sewester, E.E.2
Taher, K.3
-
7
-
-
0002858039
-
Mental model concepts for system dynamics research
-
Doyle, J. K., and Ford, D. N. (1998). "Mental model concepts for system dynamics research." System Dynamics Review, 14(1), 3-29.
-
(1998)
System Dynamics Review
, vol.14
, Issue.1
, pp. 3-29
-
-
Doyle, J.K.1
Ford, D.N.2
-
9
-
-
0002132859
-
Modeling dynamic development processes
-
Ford, D. N., and Sterman, J. D. (1998). "Modeling dynamic development processes." System Dynamics Review, 14(1), 31-68.
-
(1998)
System Dynamics Review
, vol.14
, Issue.1
, pp. 31-68
-
-
Ford, D.N.1
Sterman, J.D.2
-
13
-
-
0003921398
-
-
Prentice Hall, Englewood Cliffs, N.J.
-
Hendrickson, C., and Au, T. (1989). Project management for construction, Prentice Hall, Englewood Cliffs, N.J.
-
(1989)
Project Management for Construction
-
-
Hendrickson, C.1
Au, T.2
-
14
-
-
0022241179
-
The why and how of contingency management
-
Denver, Colo.
-
Jackson, R. L., Kinsey, J. W., Cotton, W. E., and Moore, S. K. (1985). "The why and how of contingency management." Transactions, AACE 9th Annual Meeting. Denver, Colo., N.O.1-N.O.5.
-
(1985)
Transactions, AACE 9th Annual Meeting
-
-
Jackson, R.L.1
Kinsey, J.W.2
Cotton, W.E.3
Moore, S.K.4
-
15
-
-
0030127453
-
Worth the risk?
-
Lockhart, C. W., and Roberds, W. J. (1996). "Worth the Risk?" Civil Engineering, 66(4), 62-64.
-
(1996)
Civil Engineering
, vol.66
, Issue.4
, pp. 62-64
-
-
Lockhart, C.W.1
Roberds, W.J.2
-
16
-
-
0343826814
-
Using risk analysis to determine construction project contingencies
-
Mak, S., and Picken, D. (2000). "Using risk analysis to determine construction project contingencies." J. Constr. Eng. Manage., 126(2), 130-136.
-
(2000)
J. Constr. Eng. Manage.
, vol.126
, Issue.2
, pp. 130-136
-
-
Mak, S.1
Picken, D.2
-
17
-
-
43949159614
-
Determinants of new product performance: A review and met-analysis
-
Montoya-Weiss, M., and Calantone, R. (1994). "Determinants of new product performance: A review and met-analysis." Journal of Product Innovation Management, 11(5), 397-417.
-
(1994)
Journal of Product Innovation Management
, vol.11
, Issue.5
, pp. 397-417
-
-
Montoya-Weiss, M.1
Calantone, R.2
-
18
-
-
13944264117
-
Project reserves: A key to managing cost risks
-
Murray, J. W., and Ramsaur, W. F. (1983), "Project reserves: A key to managing cost risks." Project Management Quarterly, 14(3), 15-25.
-
(1983)
Project Management Quarterly
, vol.14
, Issue.3
, pp. 15-25
-
-
Murray, J.W.1
Ramsaur, W.F.2
-
19
-
-
13944252344
-
Cost estimating guidelines
-
Washington, D.C.
-
National Aeronautics and Space Administration (NASA). (1996). "Cost estimating guidelines." Parameter Cost Estimating Reference Manual, Washington, D.C.
-
(1996)
Parameter Cost Estimating Reference Manual
-
-
-
20
-
-
0017135463
-
Designing to reduce construction costs
-
Paulson, B. (1976). "Designing to reduce construction costs." J. Constr. Div. 102(4), 587-592.
-
(1976)
J. Constr. Div.
, vol.102
, Issue.4
, pp. 587-592
-
-
Paulson, B.1
-
21
-
-
0001761824
-
Budgets as dynamic gatekeepers
-
Pollack, H., and Zeckhauser, R. (1996). "Budgets as dynamic gatekeepers." Manage. Sci., 42(5), 642-58.
-
(1996)
Manage. Sci.
, vol.42
, Issue.5
, pp. 642-658
-
-
Pollack, H.1
Zeckhauser, R.2
-
22
-
-
0041010783
-
A dynamic model of resource allocation in multi-project research and development systems
-
Repenning, N. (2000). "A dynamic model of resource allocation in multi-project research and development systems." System Dynamics Review, 16(3), 173-212.
-
(2000)
System Dynamics Review
, vol.16
, Issue.3
, pp. 173-212
-
-
Repenning, N.1
-
23
-
-
0002640192
-
Getting quality the old-fashioned way: Self-confirming attributions in the dynamics of process improvement
-
R. Scott and R. Cole, eds., Sage, Newbury Park, Calif.
-
Repenning, N., and Sterman, J. D. (2000). "Getting quality the old-fashioned way: Self-confirming attributions in the dynamics of process improvement." The quality movement and organizational theory, R. Scott and R. Cole, eds., Sage, Newbury Park, Calif.
-
(2000)
The Quality Movement and Organizational Theory
-
-
Repenning, N.1
Sterman, J.D.2
-
25
-
-
13944257133
-
Managing design-to-cost engineering projects
-
Ruskin, A. (1995). "Managing design-to-cost engineering projects." Project Management Journal, 26(3), 12-6.
-
(1995)
Project Management Journal
, vol.26
, Issue.3
, pp. 12-16
-
-
Ruskin, A.1
-
26
-
-
13944255240
-
Monitoring and contingency allowances: Complimentary aspects of project control
-
Ruskin, A. M. (1981). "Monitoring and contingency allowances: Complimentary aspects of project control." Project Management Quarterly, 12(4), 49-50.
-
(1981)
Project Management Quarterly
, vol.12
, Issue.4
, pp. 49-50
-
-
Ruskin, A.M.1
-
29
-
-
0033099726
-
Small to medium contractor contingency and assumption of risk
-
Smith, G. R., and Bohn, C. M. (1999). "Small to medium contractor contingency and assumption of risk." J. Constr. Eng. Manage., 125(2), 101-108.
-
(1999)
J. Constr. Eng. Manage.
, vol.125
, Issue.2
, pp. 101-108
-
-
Smith, G.R.1
Bohn, C.M.2
-
30
-
-
84982732856
-
Learning in about complex systems
-
Sterman, J. D. (1994). "Learning in about complex systems." System Dynamics Review, 10(2-3), 291-330.
-
(1994)
System Dynamics Review
, vol.10
, Issue.2-3
, pp. 291-330
-
-
Sterman, J.D.1
-
32
-
-
0029377979
-
Fast track pros and cons: Considerations for industrial projects
-
Williams, G. V. (1995). "Fast track pros and cons: Considerations for industrial projects." J. Manage. Eng., 11(5), 24-32.
-
(1995)
J. Manage. Eng.
, vol.11
, Issue.5
, pp. 24-32
-
-
Williams, G.V.1
-
33
-
-
0025503588
-
Risks, classification of estimates, and contingency management
-
Yeo, K. T. (1990). "Risks, classification of estimates, and contingency management." J. Manage. Eng., 6(4), 458-470.
-
(1990)
J. Manage. Eng.
, vol.6
, Issue.4
, pp. 458-470
-
-
Yeo, K.T.1
|