Volumn 128, Issue 1, 2002, Pages 30-39

Achieving multiple project objectives through contingency management

Author keywords

Budgeting; Contingency; Cost control; Project management

Indexed keywords

CONTINGENCY; COST CONTROL; DYNAMIC INFORMATION PROCESSING MODEL; PROJECT PLANNING;

EID: 3943069302     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0733-9364(2002)128:1(30)     Document Type: Article
Times cited : (61)

References (34)
  • 5
    • 83755202997 scopus 로고
    • Naval ship production: A claim settled and a framework built
    • Cooper, K. G. (1980). "Naval ship production: A claim settled and a framework built." Interfaces, 10(6), 20-36.
    • (1980) Interfaces , vol.10 , Issue.6 , pp. 20-36
    • Cooper, K.G.1
  • 7
    • 0002858039 scopus 로고    scopus 로고
    • Mental model concepts for system dynamics research
    • Doyle, J. K., and Ford, D. N. (1998). "Mental model concepts for system dynamics research." System Dynamics Review, 14(1), 3-29.
    • (1998) System Dynamics Review , vol.14 , Issue.1 , pp. 3-29
    • Doyle, J.K.1    Ford, D.N.2
  • 9
    • 0002132859 scopus 로고    scopus 로고
    • Modeling dynamic development processes
    • Ford, D. N., and Sterman, J. D. (1998). "Modeling dynamic development processes." System Dynamics Review, 14(1), 31-68.
    • (1998) System Dynamics Review , vol.14 , Issue.1 , pp. 31-68
    • Ford, D.N.1    Sterman, J.D.2
  • 16
    • 0343826814 scopus 로고    scopus 로고
    • Using risk analysis to determine construction project contingencies
    • Mak, S., and Picken, D. (2000). "Using risk analysis to determine construction project contingencies." J. Constr. Eng. Manage., 126(2), 130-136.
    • (2000) J. Constr. Eng. Manage. , vol.126 , Issue.2 , pp. 130-136
    • Mak, S.1    Picken, D.2
  • 17
    • 43949159614 scopus 로고
    • Determinants of new product performance: A review and met-analysis
    • Montoya-Weiss, M., and Calantone, R. (1994). "Determinants of new product performance: A review and met-analysis." Journal of Product Innovation Management, 11(5), 397-417.
    • (1994) Journal of Product Innovation Management , vol.11 , Issue.5 , pp. 397-417
    • Montoya-Weiss, M.1    Calantone, R.2
  • 18
    • 13944264117 scopus 로고
    • Project reserves: A key to managing cost risks
    • Murray, J. W., and Ramsaur, W. F. (1983), "Project reserves: A key to managing cost risks." Project Management Quarterly, 14(3), 15-25.
    • (1983) Project Management Quarterly , vol.14 , Issue.3 , pp. 15-25
    • Murray, J.W.1    Ramsaur, W.F.2
  • 19
    • 13944252344 scopus 로고    scopus 로고
    • Cost estimating guidelines
    • Washington, D.C.
    • National Aeronautics and Space Administration (NASA). (1996). "Cost estimating guidelines." Parameter Cost Estimating Reference Manual, Washington, D.C.
    • (1996) Parameter Cost Estimating Reference Manual
  • 20
    • 0017135463 scopus 로고
    • Designing to reduce construction costs
    • Paulson, B. (1976). "Designing to reduce construction costs." J. Constr. Div. 102(4), 587-592.
    • (1976) J. Constr. Div. , vol.102 , Issue.4 , pp. 587-592
    • Paulson, B.1
  • 21
    • 0001761824 scopus 로고    scopus 로고
    • Budgets as dynamic gatekeepers
    • Pollack, H., and Zeckhauser, R. (1996). "Budgets as dynamic gatekeepers." Manage. Sci., 42(5), 642-58.
    • (1996) Manage. Sci. , vol.42 , Issue.5 , pp. 642-658
    • Pollack, H.1    Zeckhauser, R.2
  • 22
    • 0041010783 scopus 로고    scopus 로고
    • A dynamic model of resource allocation in multi-project research and development systems
    • Repenning, N. (2000). "A dynamic model of resource allocation in multi-project research and development systems." System Dynamics Review, 16(3), 173-212.
    • (2000) System Dynamics Review , vol.16 , Issue.3 , pp. 173-212
    • Repenning, N.1
  • 23
    • 0002640192 scopus 로고    scopus 로고
    • Getting quality the old-fashioned way: Self-confirming attributions in the dynamics of process improvement
    • R. Scott and R. Cole, eds., Sage, Newbury Park, Calif.
    • Repenning, N., and Sterman, J. D. (2000). "Getting quality the old-fashioned way: Self-confirming attributions in the dynamics of process improvement." The quality movement and organizational theory, R. Scott and R. Cole, eds., Sage, Newbury Park, Calif.
    • (2000) The Quality Movement and Organizational Theory
    • Repenning, N.1    Sterman, J.D.2
  • 25
    • 13944257133 scopus 로고
    • Managing design-to-cost engineering projects
    • Ruskin, A. (1995). "Managing design-to-cost engineering projects." Project Management Journal, 26(3), 12-6.
    • (1995) Project Management Journal , vol.26 , Issue.3 , pp. 12-16
    • Ruskin, A.1
  • 26
    • 13944255240 scopus 로고
    • Monitoring and contingency allowances: Complimentary aspects of project control
    • Ruskin, A. M. (1981). "Monitoring and contingency allowances: Complimentary aspects of project control." Project Management Quarterly, 12(4), 49-50.
    • (1981) Project Management Quarterly , vol.12 , Issue.4 , pp. 49-50
    • Ruskin, A.M.1
  • 29
    • 0033099726 scopus 로고    scopus 로고
    • Small to medium contractor contingency and assumption of risk
    • Smith, G. R., and Bohn, C. M. (1999). "Small to medium contractor contingency and assumption of risk." J. Constr. Eng. Manage., 125(2), 101-108.
    • (1999) J. Constr. Eng. Manage. , vol.125 , Issue.2 , pp. 101-108
    • Smith, G.R.1    Bohn, C.M.2
  • 30
    • 84982732856 scopus 로고
    • Learning in about complex systems
    • Sterman, J. D. (1994). "Learning in about complex systems." System Dynamics Review, 10(2-3), 291-330.
    • (1994) System Dynamics Review , vol.10 , Issue.2-3 , pp. 291-330
    • Sterman, J.D.1
  • 32
    • 0029377979 scopus 로고
    • Fast track pros and cons: Considerations for industrial projects
    • Williams, G. V. (1995). "Fast track pros and cons: Considerations for industrial projects." J. Manage. Eng., 11(5), 24-32.
    • (1995) J. Manage. Eng. , vol.11 , Issue.5 , pp. 24-32
    • Williams, G.V.1
  • 33
    • 0025503588 scopus 로고
    • Risks, classification of estimates, and contingency management
    • Yeo, K. T. (1990). "Risks, classification of estimates, and contingency management." J. Manage. Eng., 6(4), 458-470.
    • (1990) J. Manage. Eng. , vol.6 , Issue.4 , pp. 458-470
    • Yeo, K.T.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.