Volumn 130, Issue 1, 2004, Pages 33-42

Managing constructibility reviews to reduce highway project durations

Author keywords

Constructibility; Design build; Highway construction; Project management; Scheduling; Simulation

Indexed keywords

CONSTRUCTIBILITY; DESIGN/BUILD; HIGHWAY CONSTRUCTION; PROJECT COSTS;

EID: 13944265622     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0733-9364(2004)130:1(33)     Document Type: Article
Times cited : (28)

References (32)
  • 1
    • 0001318558 scopus 로고
    • Understanding the '90% syndrome' in software project management: A simulation-based case study
    • Abdel-Hamid, T. (1988). "Understanding the '90% Syndrome' in Software Project Management: A Simulation-Based Case Study." J. Syst. Softw., 8, 319-330.
    • (1988) J. Syst. Softw. , vol.8 , pp. 319-330
    • Abdel-Hamid, T.1
  • 2
    • 13944271132 scopus 로고    scopus 로고
    • Final draft, July 31, 2000
    • American Association of State and Highway Transportation Officials (AASHTO). (2000). Constructibility review best practices guide, Final draft, July 31, 2000.
    • (2000) Constructibility Review Best Practices Guide
  • 3
  • 5
    • 0033131708 scopus 로고    scopus 로고
    • Constructibility issues for highway projects
    • Anderson, S., Fisher, D., and Rahman, S. (1999). "Constructibility issues for highway projects." J. Manage. Eng., 15(3), 60-68.
    • (1999) J. Manage. Eng. , vol.15 , Issue.3 , pp. 60-68
    • Anderson, S.1    Fisher, D.2    Rahman, S.3
  • 6
    • 44449165065 scopus 로고
    • Concepts and methods of schedule compression
    • The University of Texas at Austin, Austin, Tex.
    • Construction Industry Institute (CII). (1989). "Concepts and methods of schedule compression." Construction Industry Institute Publication No. 6-7, The University of Texas at Austin, Austin, Tex.
    • (1989) Construction Industry Institute Publication No. 6-7 , vol.6-7
  • 7
    • 13944270763 scopus 로고
    • Constructibility implementation guide
    • The University of Texas at Austin, Austin, Tex.
    • Construction Industry Institute (CII). (1993). "Constructibility implementation guide." Construction Industry Institute Publication No. 34-1, The University of Texas at Austin, Austin, Tex.
    • (1993) Construction Industry Institute Publication No. 34-1 , vol.34 , Issue.1
  • 8
    • 85023827777 scopus 로고
    • Schedule reduction
    • The University of Texas at Austin, Austin, Tex.
    • Construction Industry Institute (CII). (1995). "Schedule reduction." Construction Industry Institute Publication No. 41-1, The University of Texas at Austin, Austin, Tex.
    • (1995) Construction Industry Institute Publication No. 41-1 , vol.41 , Issue.1
  • 9
    • 83755202997 scopus 로고
    • Naval ship production: A claim settled and a framework built
    • Cooper, K. G. (1980). "Naval ship production: A claim settled and a framework built." Interfaces, 10(6), 20-36.
    • (1980) Interfaces , vol.10 , Issue.6 , pp. 20-36
    • Cooper, K.G.1
  • 10
    • 0001906688 scopus 로고
    • The change cycle: Benchmarks for the project manager
    • Cooper, K. G. (1993). "The change cycle: Benchmarks for the project manager." Proj. Manage J., 24(1), 17-22.
    • (1993) Proj. Manage J. , vol.24 , Issue.1 , pp. 17-22
    • Cooper, K.G.1
  • 11
    • 13944267640 scopus 로고    scopus 로고
    • Presentation to the AASHTO Subcommittee on Construction, August 1-5
    • DeWitt, S. D. (1999). "Subcommittee Constructibility survey." Presentation to the AASHTO Subcommittee on Construction, August 1-5.
    • (1999) Subcommittee Constructibility Survey
    • DeWitt, S.D.1
  • 12
    • 0344712409 scopus 로고    scopus 로고
    • An investigation of schedule reduction techniques for the engineering and construction industry
    • The University of Texas at Austin, Austin, Tex.
    • Eldin, N. (1996). "An investigation of schedule reduction techniques for the engineering and construction industry." Construction Industry Institute Research Rep. No. 41-11, The University of Texas at Austin, Austin, Tex.
    • (1996) Construction Industry Institute Research Rep. No. 41-11 , vol.41 , Issue.11
    • Eldin, N.1
  • 13
    • 0342374781 scopus 로고
    • Rep. No. FL/DOT/RMC/99700-7557-119, Florida Department of Transportation, Tallahassee, Fla.
    • Ellis, R. D., Kumar, A., and Ahmed, Q. A. (1992). "Life cycle reconstructibility." Rep. No. FL/DOT/RMC/99700-7557-119, Florida Department of Transportation, Tallahassee, Fla.
    • (1992) Life Cycle Reconstructibility
    • Ellis, R.D.1    Kumar, A.2    Ahmed, Q.A.3
  • 14
    • 84860080521 scopus 로고
    • U.S. Department of Transportation
    • Federal Highway Administration. (1995). "Special experimental project No. 14." U.S. Department of Transportation, (http://www.fhwa.dot. gov/////programadmin/contracts/050495.htm)
    • (1995) Special Experimental Project No. 14 , vol.14
  • 15
    • 3142693458 scopus 로고    scopus 로고
    • U.S. Department of Transportation
    • Federal Highway Administration. (2002). "Federal Highway Administration." U.S. Department of Transportation, 〈http://www.fhwa. dot.gov/〉
    • (2002) Federal Highway Administration
  • 16
    • 0030318089 scopus 로고    scopus 로고
    • Automated constructibility analysis of work-zone traffic-control planning
    • Fisher, D. J., and Rajan, N. (1996). "Automated Constructibility Analysis of Work-Zone Traffic-Control Planning." J. Constr. Eng. Manage., 122(1), 36-43.
    • (1996) J. Constr. Eng. Manage. , vol.122 , Issue.1 , pp. 36-43
    • Fisher, D.J.1    Rajan, N.2
  • 18
    • 0002132859 scopus 로고    scopus 로고
    • Dynamic modeling of product development processes
    • 36-43
    • Ford, 36-43, David, N., and Sterman, J. D. (1998). "Dynamic modeling of product development processes." Syst. Dyn. Rev., 14(1), 31-68.
    • (1998) Syst. Dyn. Rev. , vol.14 , Issue.1 , pp. 31-68
    • Ford, D.N.1    Sterman, J.D.2
  • 19
    • 0242269387 scopus 로고    scopus 로고
    • The liar's club: Concealing rework in concurrent development
    • Ford, David N., and Sterman, J. D. (2003). "The liar's club: Concealing rework in concurrent development." Concurrent Eng. Res. Appl., 111(3), 211-219.
    • (2003) Concurrent Eng. Res. Appl. , vol.111 , Issue.3 , pp. 211-219
    • Ford, D.N.1    Sterman, J.D.2
  • 20
  • 21
    • 0000545232 scopus 로고
    • Tests for building confidence in system dynamics models
    • Monograph No. 14
    • Forrester, Jay, and Senge, Peter (1980). "Tests for building confidence in system dynamics models." TIMS Studies in the Management Sciences, Monograph No. 14, 209-228.
    • (1980) TIMS Studies in the Management Sciences , pp. 209-228
    • Forrester, J.1    Senge, P.2
  • 22
    • 13944265133 scopus 로고
    • Highway construct* ability guide. Investigation of highway project constructability improvement
    • The Center for Transportation Research, The University of Texas at Austin
    • Hugo, F., O'Connor, J. T., and Ward, W. V. (1990). "Highway construct* ability guide. Investigation of highway project constructability improvement." Research Project No. 3-6-88-1149, The Center for Transportation Research, The University of Texas at Austin.
    • (1990) Research Project No. 3-6-88-1149
    • Hugo, F.1    O'Connor, J.T.2    Ward, W.V.3
  • 24
    • 0001446357 scopus 로고    scopus 로고
    • Strategic management of complex projects: A case study using system dynamics
    • Lyneis, J. M., Cooper, K., and Els, S. A. (2001). "Strategic management of complex projects: a case study using system dynamics." Syst. Dyn. Rev., 17(3), 237-260.
    • (2001) Syst. Dyn. Rev. , vol.17 , Issue.3 , pp. 237-260
    • Lyneis, J.M.1    Cooper, K.2    Els, S.A.3
  • 25
    • 0031146036 scopus 로고    scopus 로고
    • The constructibility review process: A constructor's perspective
    • Mendelsohn, R. (1997). "The constructibility review process: A constructor's perspective." J. Manage. Eng., 13(3), 17-19.
    • (1997) J. Manage. Eng. , vol.13 , Issue.3 , pp. 17-19
    • Mendelsohn, R.1
  • 26
    • 0026169343 scopus 로고
    • Improving highway specifications for constructibility
    • O'Connor, J. T., Hugo, F., and Stamm, E. M. (1991). "Improving highway specifications for constructibility." J. Constr. Eng, Manage., 117(2), 242-258.
    • (1991) J. Constr. Eng, Manage. , vol.117 , Issue.2 , pp. 242-258
    • O'Connor, J.T.1    Hugo, F.2    Stamm, E.M.3
  • 27
    • 0031672864 scopus 로고    scopus 로고
    • System dynamics in project management: Assessing the impacts of client behavior on project performance
    • Rodrigues, A., and Williams, T. M. (1997). "System dynamics in project management: assessing the impacts of client behavior on project performance." J. Oper. Res., 49, 2-15.
    • (1997) J. Oper. Res. , vol.49 , pp. 2-15
    • Rodrigues, A.1    Williams, T.M.2
  • 32
    • 0002533915 scopus 로고
    • The second Toyota paradox: How delaying decisions can make better cars faster
    • Ward, A., Liker, J., Cristiano, J., and Sobek, D. (1995). "The second Toyota paradox: how delaying decisions can make better cars faster." Sloon Manage. Rev., 36(3), 43-61.
    • (1995) Sloon Manage. Rev. , vol.36 , Issue.3 , pp. 43-61
    • Ward, A.1    Liker, J.2    Cristiano, J.3    Sobek, D.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.