-
2
-
-
0035381985
-
The non-stationary staff planning problem with business cycle and learning effects
-
Anderson E.G. The non-stationary staff planning problem with business cycle and learning effects. Management Science. 47(6):2001;817-832.
-
(2001)
Management Science
, vol.47
, Issue.6
, pp. 817-832
-
-
Anderson, E.G.1
-
4
-
-
83755202997
-
Naval ship production: A claim settled and a framework built
-
Cooper K.G. Naval ship production: A claim settled and a framework built. Interfaces. 10(6):1980;20-36.
-
(1980)
Interfaces
, vol.10
, Issue.6
, pp. 20-36
-
-
Cooper, K.G.1
-
5
-
-
0001906688
-
The rework cycle: Benchmarks for the project manager
-
Cooper K.G. The rework cycle: Benchmarks for the project manager. Project Management Journal. 24(1):1993;17-22.
-
(1993)
Project Management Journal
, vol.24
, Issue.1
, pp. 17-22
-
-
Cooper, K.G.1
-
6
-
-
0001975372
-
The $2,000 hour: How managers influence project performance through the rework cycle
-
Cooper K.G. The $2,000 hour: How managers influence project performance through the rework cycle. Project Management Journal. 25(1):1994;11-24.
-
(1994)
Project Management Journal
, vol.25
, Issue.1
, pp. 11-24
-
-
Cooper, K.G.1
-
7
-
-
0003317524
-
Swords and Plowshares: The rework cycle of defense and commercial software development projects
-
Cooper K.G., Mullen T.W. Swords and Plowshares: The rework cycle of defense and commercial software development projects. American Programmer. 6(5):1993;41-54.
-
(1993)
American Programmer
, vol.6
, Issue.5
, pp. 41-54
-
-
Cooper, K.G.1
Mullen, T.W.2
-
8
-
-
11144299339
-
A model-based method for organising tasks in product development
-
Eppinger S.D., Whitney D.E., Smith R.P., Gebala D.A. A model-based method for organising tasks in product development. Research in Engineering Design. 6(1):1994;1-13.
-
(1994)
Research in Engineering Design
, vol.6
, Issue.1
, pp. 1-13
-
-
Eppinger, S.D.1
Whitney, D.E.2
Smith, R.P.3
Gebala, D.A.4
-
9
-
-
3943069302
-
Achieving multiple project objectives through contingency management
-
Ford D. Achieving multiple project objectives through contingency management. ASCE Journal of Construction Engineering and Management. 128(1):2002;1-10.
-
(2002)
ASCE Journal of Construction Engineering and Management
, vol.128
, Issue.1
, pp. 1-10
-
-
Ford, D.1
-
10
-
-
0000505381
-
Expert knowledge elicitation for improving formal and mental models
-
Ford D., Sterman J. Expert knowledge elicitation for improving formal and mental models. System Dynamics Review. 14(4):1998;309-340.
-
(1998)
System Dynamics Review
, vol.14
, Issue.4
, pp. 309-340
-
-
Ford, D.1
Sterman, J.2
-
11
-
-
0002132859
-
Modeling dynamic development processes
-
Ford D., Sterman J. Modeling dynamic development processes. System Dynamics Review. 14(1):1998;31-68.
-
(1998)
System Dynamics Review
, vol.14
, Issue.1
, pp. 31-68
-
-
Ford, D.1
Sterman, J.2
-
12
-
-
0242301115
-
Iteration management for reduced cycle time in concurrent development projects
-
in press
-
Ford, D., Sterman, J., 2003a. Iteration management for reduced cycle time in concurrent development projects, Concurrent Engineering Research and Applications, in press.
-
(2003)
Concurrent Engineering Research and Applications
-
-
Ford, D.1
Sterman, J.2
-
15
-
-
0031238092
-
Planning information technology - Knowledge worker systems
-
Gaimon C. Planning information technology - knowledge worker systems. Management Science. 43(9):1997;1308-1328.
-
(1997)
Management Science
, vol.43
, Issue.9
, pp. 1308-1328
-
-
Gaimon, C.1
-
16
-
-
0012349684
-
Beyond PM 101: Lessons for managing large development programs
-
Graham A.K. Beyond PM 101: Lessons for managing large development programs. Project Management Journal. 31(4):2000;7-18.
-
(2000)
Project Management Journal
, vol.31
, Issue.4
, pp. 7-18
-
-
Graham, A.K.1
-
17
-
-
0024606840
-
The time-cost trade off in research and development: A review
-
Graves S.B. The time-cost trade off in research and development: A review. Engineering Costs and Production Economics. 16:1989;1-9.
-
(1989)
Engineering Costs and Production Economics
, vol.16
, pp. 1-9
-
-
Graves, S.B.1
-
18
-
-
0022741221
-
A tactical planning model for a job shop
-
Graves S.C. A tactical planning model for a job shop. Operations Research. 34:1986;522-533.
-
(1986)
Operations Research
, vol.34
, pp. 522-533
-
-
Graves, S.C.1
-
19
-
-
0039210129
-
The labour assignment decisions: An application of work flow structure information
-
Holstein W.K., Berry W.L. The labour assignment decisions: An application of work flow structure information. Management Science. 18(7):1972;390-400.
-
(1972)
Management Science
, vol.18
, Issue.7
, pp. 390-400
-
-
Holstein, W.K.1
Berry, W.L.2
-
20
-
-
0005142414
-
A linear decision rule for production and employment scheduling
-
Holt C.C., Modigliani F., Simon H.A. A linear decision rule for production and employment scheduling. Management Science. 2(1):1955;1-30.
-
(1955)
Management Science
, vol.2
, Issue.1
, pp. 1-30
-
-
Holt, C.C.1
Modigliani, F.2
Simon, H.A.3
-
21
-
-
3943085118
-
Automation usage pattern during complex electro mechanical product development
-
prepared under contract number F33615-94-C-4429 from the US Air Force Research Laboratory (US-AFRL), Cambridge, MA
-
Joglekar, N.R., Whitney, D.E., 1999. Automation Usage Pattern during Complex Electro Mechanical Product Development, MIT Center for Technology Policy and Industrial Development report, prepared under contract number F33615-94-C-4429 from the US Air Force Research Laboratory (US-AFRL), Cambridge, MA.
-
(1999)
MIT Center for Technology Policy and Industrial Development Report
-
-
Joglekar, N.R.1
Whitney, D.E.2
-
22
-
-
0035707626
-
Performance of coupled product development activities with a deadline
-
Joglekar N.R., Yassine A., Eppinger S.D., Whitney D.E. Performance of coupled product development activities with a deadline. Management Science. 47(12):2001;1605-1620.
-
(2001)
Management Science
, vol.47
, Issue.12
, pp. 1605-1620
-
-
Joglekar, N.R.1
Yassine, A.2
Eppinger, S.D.3
Whitney, D.E.4
-
23
-
-
0005648655
-
-
NISTIR - National Institute of Standards and Technology, Gaithersburg, MD
-
Jones, A., Rabelo, L.C., 1998. Survey of job shop scheduling techniques, NISTIR - National Institute of Standards and Technology, Gaithersburg, MD.
-
(1998)
Survey of Job Shop Scheduling Techniques
-
-
Jones, A.1
Rabelo, L.C.2
-
24
-
-
0015681904
-
An economic evaluation of job shop dispatching rules
-
Jones C.H. An economic evaluation of job shop dispatching rules. Management Science. 20(3):1973;293-307.
-
(1973)
Management Science
, vol.20
, Issue.3
, pp. 293-307
-
-
Jones, C.H.1
-
25
-
-
0030147006
-
Managing the simultaneous execution of coupled phases in concurrent product development
-
Krishnan V. Managing the simultaneous execution of coupled phases in concurrent product development. IEEE Transactions on Engineering Management. 43(2):1996;210-217.
-
(1996)
IEEE Transactions on Engineering Management
, vol.43
, Issue.2
, pp. 210-217
-
-
Krishnan, V.1
-
26
-
-
0031108561
-
A model-based framework to overlap product development activities
-
Krishnan V., Eppinger S.D., Whitney D.E. A model-based framework to overlap product development activities. Management Science. 43:1997;437-451.
-
(1997)
Management Science
, vol.43
, pp. 437-451
-
-
Krishnan, V.1
Eppinger, S.D.2
Whitney, D.E.3
-
30
-
-
0032026099
-
Tools and teams: Competing models of integrated product development project performance
-
Moffatt L.K. Tools and teams: Competing models of integrated product development project performance. Journal of Engineering Technology and Management. 15:1998;55-85.
-
(1998)
Journal of Engineering Technology and Management
, vol.15
, pp. 55-85
-
-
Moffatt, L.K.1
-
32
-
-
0031672864
-
System dynamics in project management: Assessing the impacts of client behavior on project performance
-
Rodrigues A., Williams T.M. System dynamics in project management: Assessing the impacts of client behavior on project performance. Journal of the Operational Research Society. 49:1997;2-15.
-
(1997)
Journal of the Operational Research Society
, vol.49
, pp. 2-15
-
-
Rodrigues, A.1
Williams, T.M.2
-
33
-
-
0034313848
-
Time-cost trade off in overlapped product development
-
Roemer T.A., Ahmadi R.H., Wang R.H. Time-cost trade off in overlapped product development. Operations Research. 48(6):2000;858-865.
-
(2000)
Operations Research
, vol.48
, Issue.6
, pp. 858-865
-
-
Roemer, T.A.1
Ahmadi, R.H.2
Wang, R.H.3
-
35
-
-
0031199079
-
A predictive model of sequential iteration in engineering design
-
Smith R.P., Eppinger S.D. A predictive model of sequential iteration in engineering design. Management Science. 43(8):1997;1104-1120.
-
(1997)
Management Science
, vol.43
, Issue.8
, pp. 1104-1120
-
-
Smith, R.P.1
Eppinger, S.D.2
-
36
-
-
0031084622
-
Identifying controlling features of engineering design iteration
-
Smith R.P., Eppinger S.D. Identifying controlling features of engineering design iteration. Management Science. 43(3):1997;276-293.
-
(1997)
Management Science
, vol.43
, Issue.3
, pp. 276-293
-
-
Smith, R.P.1
Eppinger, S.D.2
|