메뉴 건너뛰기




Volumn 13, Issue 3, 2006, Pages 275-289

Project management quality and the value of flexible strategies

Author keywords

Management strategy; Project management; Quality; Risk management

Indexed keywords

CONSTRUCTION INDUSTRY; INDUSTRIAL ECONOMICS; PERFORMANCE; RISK MANAGEMENT; SCHEDULING;

EID: 33745107509     PISSN: 09699988     EISSN: None     Source Type: Journal    
DOI: 10.1108/09699980610669697     Document Type: Article
Times cited : (21)

References (46)
  • 1
    • 0001318558 scopus 로고
    • Understanding the '90% syndrome' in software project management: A simulation-based case study
    • Abdel-Hamid, T. (1988), "Understanding the '90% syndrome' in software project management: a simulation-based case study", The Journal of Systems and Software, Vol. 8, pp. 319-30.
    • (1988) The Journal of Systems and Software , vol.8 , pp. 319-330
    • Abdel-Hamid, T.1
  • 4
    • 0002491956 scopus 로고    scopus 로고
    • Disciplined decisions: Aligning strategy with the financial markets
    • Amram, M. and Kulatilaka, N. (1999b), "Disciplined decisions: aligning strategy with the financial markets", Harvard Business Review, Vol. 77, pp. 95-104.
    • (1999) Harvard Business Review , vol.77 , pp. 95-104
    • Amram, M.1    Kulatilaka, N.2
  • 5
    • 2342444876 scopus 로고    scopus 로고
    • paper presented at Construction Research 2003, Winds of Change: Integration and Innovation of Construction, Construction Research Congress, Honolulu, HI, March 19-21
    • Bender, W. (2003), "Case study of construction project delivery types", paper presented at Construction Research 2003, Winds of Change: Integration and Innovation of Construction, Construction Research Congress, Honolulu, HI, March 19-21.
    • (2003) Case Study of Construction Project Delivery Types
    • Bender, W.1
  • 6
    • 33745081435 scopus 로고    scopus 로고
    • Master's thesis, Department of Civil Engineering, Texas A&M University, College Station, TX
    • Bhargav, S. (2004), "Impacts of project management on real option values", Master's thesis, Department of Civil Engineering, Texas A&M University, College Station, TX.
    • (2004) Impacts of Project Management on Real Option Values
    • Bhargav, S.1
  • 8
    • 0001975372 scopus 로고
    • The $2,000 hour: How managers influence project performance through the rework cycle
    • Cooper, K.G. (1994), "The $2,000 hour: how managers influence project performance through the rework cycle", Project Management Journal, Vol. 15 No. 1, pp. 11-24.
    • (1994) Project Management Journal , vol.15 , Issue.1 , pp. 11-24
    • Cooper, K.G.1
  • 9
    • 83755202997 scopus 로고
    • Naval ship production: A claim settled and a framework built
    • Cooper, K.G. (1980), "Naval ship production: a claim settled and a framework built", Interfaces, Vol. 10 No. 6, pp. 20-36.
    • (1980) Interfaces , vol.10 , Issue.6 , pp. 20-36
    • Cooper, K.G.1
  • 10
    • 0003317524 scopus 로고
    • Swords and plowshares: The rework cycles of defense and commercial software development projects
    • Cooper, K.G. and Mullen, T. (1993), "Swords and plowshares: the rework cycles of defense and commercial software development projects", American Programmer, Vol. 6 No. 5, pp. 41-51.
    • (1993) American Programmer , vol.6 , Issue.5 , pp. 41-51
    • Cooper, K.G.1    Mullen, T.2
  • 13
    • 0035392410 scopus 로고    scopus 로고
    • Optimum planning of highway construction under A+B bidding method
    • El-Rayes, K. (2001), "Optimum planning of highway construction under A+B bidding method", Journal of Construction Engineering and Management, Vol. 127 No. 4, pp. 261-9.
    • (2001) Journal of Construction Engineering and Management , vol.127 , Issue.4 , pp. 261-269
    • El-Rayes, K.1
  • 15
    • 3943069302 scopus 로고    scopus 로고
    • Achieving multiple project objectives through contingency management
    • Ford, D.N. (2002), "Achieving multiple project objectives through contingency management", ASCE Journal of Construction Engineering and Management, Vol. 128 No. 1, pp. 30-9.
    • (2002) ASCE Journal of Construction Engineering and Management , vol.128 , Issue.1 , pp. 30-39
    • Ford, D.N.1
  • 16
    • 17144364045 scopus 로고    scopus 로고
    • Using options to manage dynamic uncertainty in acquisition projects
    • Ford, D.N. and Ceylan, K. (2002), "Using options to manage dynamic uncertainty in acquisition projects", Acquisition Review Quarterly, Vol. 9 No. 4, pp. 243-58.
    • (2002) Acquisition Review Quarterly , vol.9 , Issue.4 , pp. 243-258
    • Ford, D.N.1    Ceylan, K.2
  • 17
    • 33745099519 scopus 로고    scopus 로고
    • Modeling real options to switch among alternatives in product development
    • Ford, D.N. and Sobek, D. (2005), "Modeling real options to switch among alternatives in product development", IEEE Transactions on Engineering Management, Vol. 52 No. 2, pp. 1-11.
    • (2005) IEEE Transactions on Engineering Management , vol.52 , Issue.2 , pp. 1-11
    • Ford, D.N.1    Sobek, D.2
  • 18
    • 0002132859 scopus 로고    scopus 로고
    • Dynamic modeling of product development processes
    • Ford, D.N. and Sterman, J.D. (1998), "Dynamic modeling of product development processes", System Dynamics Review, Vol. 14 No. 1, pp. 31-68.
    • (1998) System Dynamics Review , vol.14 , Issue.1 , pp. 31-68
    • Ford, D.N.1    Sterman, J.D.2
  • 19
    • 0242269387 scopus 로고    scopus 로고
    • The liar's club: Impacts of concealment in concurrent development projects
    • Ford, D.N. and Sterman, J. (2003a), "The liar's club: impacts of concealment in concurrent development projects", Concurrent Engineering Research and Applications, Vol. 111 No. 3, pp. 211-19.
    • (2003) Concurrent Engineering Research and Applications , vol.111 , Issue.3 , pp. 211-219
    • Ford, D.N.1    Sterman, J.2
  • 20
    • 0242301115 scopus 로고    scopus 로고
    • Overcoming the 90% syndrome: Iteration management in concurrent development projects
    • Ford, D.N. and Sterman, J. (2003b), "Overcoming the 90% syndrome: iteration management in concurrent development projects", Concurrent Engineering Research and Applications, Vol. 11 No. 3, pp. 177-86.
    • (2003) Concurrent Engineering Research and Applications , vol.11 , Issue.3 , pp. 177-186
    • Ford, D.N.1    Sterman, J.2
  • 21
    • 0036604189 scopus 로고    scopus 로고
    • The real options approach to valuing strategic flexibility in uncertain construction projects
    • Ford, D.N., Lander, D. and Voyer, J. (2002), "The real options approach to valuing strategic flexibility in uncertain construction projects", Construction Management and Economics, Vol. 20 No. 4, pp. 343-52.
    • (2002) Construction Management and Economics , vol.20 , Issue.4 , pp. 343-352
    • Ford, D.N.1    Lander, D.2    Voyer, J.3
  • 24
    • 0000545232 scopus 로고
    • Tests for building confidence in system dynamics models
    • Forrester, J. and Senge, P.M. (1980), "Tests for building confidence in system dynamics models", TIMS Series in the Management Sciences, Vol. 14, pp. 209-28.
    • (1980) TIMS Series in the Management Sciences , vol.14 , pp. 209-228
    • Forrester, J.1    Senge, P.M.2
  • 25
    • 2942652733 scopus 로고    scopus 로고
    • Valuation techniques for infrastructure investment decisions
    • Garvin, M.J. and Cheah, C.J. (2004), "Valuation techniques for infrastructure investment decisions", Construction Management Economics, Vol. 22, May, pp. 373-83.
    • (2004) Construction Management Economics , vol.22 , pp. 373-383
    • Garvin, M.J.1    Cheah, C.J.2
  • 26
    • 0029532894 scopus 로고
    • A+B bidding method - Hidden success story for highway construction
    • Herbsman, Z. (1995), "A+B bidding method - hidden success story for highway construction", Journal of Construction Engineering and Management, Vol. 121 No. 4.
    • (1995) Journal of Construction Engineering and Management , vol.121 , Issue.4
    • Herbsman, Z.1
  • 27
    • 3943068380 scopus 로고    scopus 로고
    • Product development resource allocation with foresight
    • Joglekar, N. and Ford, D. (2005), "Product development resource allocation with foresight", European Journal of Operational Research, Vol. 160 No. 1, pp. 72-87.
    • (2005) European Journal of Operational Research , vol.160 , Issue.1 , pp. 72-87
    • Joglekar, N.1    Ford, D.2
  • 29
    • 21344497329 scopus 로고
    • Case studies on real options
    • Kemna, A.G.Z. (1993), "Case studies on real options", Financial Management, Vol. 22 No. 3, pp. 259-70.
    • (1993) Financial Management , vol.22 , Issue.3 , pp. 259-270
    • Kemna, A.G.Z.1
  • 30
    • 0001323268 scopus 로고
    • A pricing method for options based on average asset values
    • Kemna, A.G.Z. and Vorst, A.C.F. (1990), "A pricing method for options based on average asset values", Journal of Banking and Finance, Vol. 14, pp. 113-29.
    • (1990) Journal of Banking and Finance , vol.14 , pp. 113-129
    • Kemna, A.G.Z.1    Vorst, A.C.F.2
  • 31
    • 14744283104 scopus 로고    scopus 로고
    • Exploiting opportunities in uncertainty during the early project phase
    • Kolltveit, B., Karlsen, J. and Grønhaug, K. (2004), "Exploiting opportunities in uncertainty during the early project phase", ASCE Journal of Management in Engineering, Vol. 20 No. 4, pp. 134-40.
    • (2004) ASCE Journal of Management in Engineering , vol.20 , Issue.4 , pp. 134-140
    • Kolltveit, B.1    Karlsen, J.2    Grønhaug, K.3
  • 32
    • 0032324668 scopus 로고    scopus 로고
    • Challenges to the practical implementation of modeling and valuing real options
    • Lander, D.M. and Pinches, G.E. (1998), "Challenges to the practical implementation of modeling and valuing real options", The Quarterly Review of Economics and Finance, Vol. 38, pp. 537-67.
    • (1998) The Quarterly Review of Economics and Finance , vol.38 , pp. 537-567
    • Lander, D.M.1    Pinches, G.E.2
  • 33
    • 0001446357 scopus 로고    scopus 로고
    • Strategic management of complex projects: A case study using system dynamics
    • Lyneis, J., Cooper, K. and Els, S. (2001), "Strategic management of complex projects: a case study using system dynamics", System Dynamics Review, Vol. 17, pp. 237-60.
    • (2001) System Dynamics Review , vol.17 , pp. 237-260
    • Lyneis, J.1    Cooper, K.2    Els, S.3
  • 34
    • 79960065350 scopus 로고    scopus 로고
    • Building governability into project structures
    • Miller, R. Lessard, D.R. MIT Press Cambridge, MA
    • Miller, R. and Floricel, S. (2000), "Building governability into project structures", in Miller, R. and Lessard, D.R. (Eds), The Strategic Management of Large Engineering Projects, MIT Press, Cambridge, MA.
    • (2000) The Strategic Management of Large Engineering Projects
    • Miller, R.1    Floricel, S.2
  • 36
    • 33745071121 scopus 로고    scopus 로고
    • paper presented at the Ports 2001 Conference: America's Ports - Gateway to the Global Economy, Norfolk, VA, April 29-May 2
    • Ritchie, W. (2001), "Alternative project delivery", paper presented at the Ports 2001 Conference: America's Ports - Gateway to the Global Economy, Norfolk, VA, April 29-May 2.
    • (2001) Alternative Project Delivery
    • Ritchie, W.1
  • 37
    • 0031672864 scopus 로고    scopus 로고
    • System dynamics in project management: Assessing the impacts of client behavior on project performance
    • Rodrigues, A. and Williams, T.M. (1997), "System dynamics in project management: assessing the impacts of client behavior on project performance", Journal of the Operational Research Society, Vol. 49, pp. 2-15.
    • (1997) Journal of the Operational Research Society , vol.49 , pp. 2-15
    • Rodrigues, A.1    Williams, T.M.2
  • 38
    • 0032659895 scopus 로고    scopus 로고
    • Optimal bid model for price-time biparameter construction contracts
    • Shen, L., Drew, D. and Zhang, Z. (1999), "Optimal bid model for price-time biparameter construction contracts", Journal of Construction Engineering and Management, Vol. 125 No. 3, pp. 204-9.
    • (1999) Journal of Construction Engineering and Management , vol.125 , Issue.3 , pp. 204-209
    • Shen, L.1    Drew, D.2    Zhang, Z.3
  • 40
    • 33745096128 scopus 로고    scopus 로고
    • Realizing the potential of real options: Does theory meet practice?
    • Triantis, A. (2005), "Realizing the potential of real options: does theory meet practice?", Journal of Applied Corporate Finance, Vol. 17 No. 2, pp. 8-16.
    • (2005) Journal of Applied Corporate Finance , vol.17 , Issue.2 , pp. 8-16
    • Triantis, A.1
  • 41
    • 84903989527 scopus 로고
    • The nature of option interactions and the valuation of investments with multiple real options
    • Trigeorgis, L. (1993a), "The nature of option interactions and the valuation of investments with multiple real options", Journal of Financial and Quantitative Analysis, Vol. 28 No. 1, pp. 1-20.
    • (1993) Journal of Financial and Quantitative Analysis , vol.28 , Issue.1 , pp. 1-20
    • Trigeorgis, L.1
  • 42
    • 21344498048 scopus 로고
    • Real options and interactions with financial flexibility
    • Trigeorgis, L. (1993b), "Real options and interactions with financial flexibility", Financial Management, Vol. 22, Autumn, pp. 202-24.
    • (1993) Financial Management , vol.22 , pp. 202-224
    • Trigeorgis, L.1
  • 43
    • 0003859941 scopus 로고
    • Trigeorgis, L. (Ed.) Praeger New York, NY
    • Trigeorgis, L. (Ed.) (1995), Real Options in Capital Investment, Praeger, New York, NY.
    • (1995) Real Options in Capital Investment
  • 44
    • 14744300277 scopus 로고    scopus 로고
    • Competitive bid versus negotiated bid in commercial construction industry - One contractor's perspective
    • Zelasko, S. and Schexnayder, C. (2003), "Competitive bid versus negotiated bid in commercial construction industry - one contractor's perspective", Practice Periodical on Structural Design and Construction, Vol. 8 No. 2, pp. 118-21.
    • (2003) Practice Periodical on Structural Design and Construction , vol.8 , Issue.2 , pp. 118-121
    • Zelasko, S.1    Schexnayder, C.2
  • 45
    • 0141856372 scopus 로고    scopus 로고
    • Valuing flexibility in infrastructure expansion
    • Zhao, T. and Tseng, C. (2003), "Valuing flexibility in infrastructure expansion", Journal of Infrastructure Systems, Vol. 9 No. 3.
    • (2003) Journal of Infrastructure Systems , vol.9 , Issue.3
    • Zhao, T.1    Tseng, C.2
  • 46
    • 1942538239 scopus 로고    scopus 로고
    • Highway development decision-making under uncertainty: A real options approach
    • Zhao, T., Sundararajan, S.K. and Tseng, C. (2004), "Highway development decision-making under uncertainty: a real options approach", Journal of Infrastructure Systems, Vol. 10 No. 1.
    • (2004) Journal of Infrastructure Systems , vol.10 , Issue.1
    • Zhao, T.1    Sundararajan, S.K.2    Tseng, C.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.