메뉴 건너뛰기




Volumn 52, Issue 5, 2005, Pages 443-458

A concave-cost production planning problem with remanufacturing options

Author keywords

Heuristics; Production planning; Remanufacturing

Indexed keywords

CONCAVE-COST VERSION; HEURISTICS; PRODUCTION PLANNING; REMANUFACTURING;

EID: 24144492367     PISSN: 0894069X     EISSN: None     Source Type: Journal    
DOI: 10.1002/nav.20089     Document Type: Review
Times cited : (45)

References (26)
  • 1
    • 0001233812 scopus 로고
    • Improved algorithm for economic lot size problems
    • A. Aggarwal and J.K. Park, Improved algorithm for economic lot size problems, Oper Res 41 (1993), 549-571.
    • (1993) Oper Res , vol.41 , pp. 549-571
    • Aggarwal, A.1    Park, J.K.2
  • 2
    • 0022581408 scopus 로고
    • Approximation formulations for the single-product capacitated lot size problem
    • G.R. Bitran and H. Matsuo, Approximation formulations for the single-product capacitated lot size problem, Oper Res 34 (1986), 63-74.
    • (1986) Oper Res , vol.34 , pp. 63-74
    • Bitran, G.R.1    Matsuo, H.2
  • 3
    • 0020194024 scopus 로고
    • Computational complexity of the capacitated lot size problem
    • G.R. Bitran and H.H. Yanasse, Computational complexity of the capacitated lot size problem, Management Sci 28 (1982), 1174-1186.
    • (1982) Management Sci , vol.28 , pp. 1174-1186
    • Bitran, G.R.1    Yanasse, H.H.2
  • 4
    • 0026208005 scopus 로고
    • A simple forward algorithm to solve general dynamic lot sizing models with n periods in O(n log n) or O(n) time
    • A. Federgruen and M. Tzur, A simple forward algorithm to solve general dynamic lot sizing models with n periods in O(n log n) or O(n) time, Management Sci 37 (1991), 909-925.
    • (1991) Management Sci , vol.37 , pp. 909-925
    • Federgruen, A.1    Tzur, M.2
  • 6
    • 0002144134 scopus 로고
    • Deterministic production planning with concave costs and capacity constraints
    • M. Florian and M. Klein, Deterministic production planning with concave costs and capacity constraints, Management Sci 18 (1971), 12-20.
    • (1971) Management Sci , vol.18 , pp. 12-20
    • Florian, M.1    Klein, M.2
  • 7
    • 0019032810 scopus 로고
    • Deterministic production planning: Algorithm and complexity
    • M. Florian, J.K. Lenstra, and A.H.G. Rinnooy Kan, Deterministic production planning: Algorithm and complexity, Management Sci 26 (1980), 669-679.
    • (1980) Management Sci , vol.26 , pp. 669-679
    • Florian, M.1    Lenstra, J.K.2    Kan, A.H.G.R.3
  • 8
    • 0025213699 scopus 로고
    • A fully polynomial approximation scheme for single product scheduling in a finite capacity facility
    • B. Gavish and R.E. Johnson, A fully polynomial approximation scheme for single product scheduling in a finite capacity facility, Oper Res 38 (1990), 70-83.
    • (1990) Oper Res , vol.38 , pp. 70-83
    • Gavish, B.1    Johnson, R.E.2
  • 9
    • 0035501881 scopus 로고    scopus 로고
    • Economic lot-sizing with remanufacturing options
    • B. Golany, J. Yang, and G. Yu, Economic lot-sizing with remanufacturing options, HE Trans 33 (2001), 995-1003.
    • (2001) HE Trans , vol.33 , pp. 995-1003
    • Golany, B.1    Yang, J.2    Yu, G.3
  • 10
    • 0033738099 scopus 로고    scopus 로고
    • Production planning and control for remanufacturing: Industry practice and research needs
    • V.D.R. Guide, Production planning and control for remanufacturing: Industry practice and research needs, J Oper Management 18 (2000), 467-483.
    • (2000) J Oper Management , vol.18 , pp. 467-483
    • Guide, V.D.R.1
  • 11
    • 0003232375 scopus 로고    scopus 로고
    • Supply chain management for recoverable manufacturing systems
    • V.D.R. Guide, V. Jayaraman, R. Srivastava, and W.C. Benton, Supply chain management for recoverable manufacturing systems, Interfaces 30 (2000), 125-142.
    • (2000) Interfaces , vol.30 , pp. 125-142
    • Guide, V.D.R.1    Jayaraman, V.2    Srivastava, R.3    Benton, W.C.4
  • 12
    • 0037431664 scopus 로고    scopus 로고
    • Optimal control of one product recovery system with lead-times
    • G.P. Kiesmüller, Optimal control of one product recovery system with lead-times, Int J Prod Econom 81-82 (2003), 333-340.
    • (2003) Int J Prod Econom , vol.81-82 , pp. 333-340
    • Kiesmüller, G.P.1
  • 13
    • 0033889945 scopus 로고    scopus 로고
    • Remanufacturing planning for the reverse Wagner/Whitin models
    • K. Richter and M. Sombrutzki, Remanufacturing planning for the reverse Wagner/Whitin models, European J Oper Res 121 (2000), 304-315.
    • (2000) European J Oper Res , vol.121 , pp. 304-315
    • Richter, K.1    Sombrutzki, M.2
  • 14
    • 0035815837 scopus 로고    scopus 로고
    • The reverse Wagner/Whitin model with variable manufacturing and remanufacturing cost
    • K. Richter and J. Weber, The reverse Wagner/Whitin model with variable manufacturing and remanufacturing cost, Int J Prod Econom 71 (2001), 447-456.
    • (2001) Int J Prod Econom , vol.71 , pp. 447-456
    • Richter, K.1    Weber, J.2
  • 15
    • 0017948545 scopus 로고
    • Optimum solution structure for a repairable inventory problem
    • V.P. Simpson, Optimum solution structure for a repairable inventory problem, Oper Res 26 (1978), 270-281.
    • (1978) Oper Res , vol.26 , pp. 270-281
    • Simpson, V.P.1
  • 16
    • 0035449015 scopus 로고    scopus 로고
    • Economic ordering quantities for recoverable item inventory systems
    • R.H. Teunter, Economic ordering quantities for recoverable item inventory systems, Naval Res Logist 48 (2001), 484-495.
    • (2001) Naval Res Logist , vol.48 , pp. 484-495
    • Teunter, R.H.1
  • 17
    • 0001228726 scopus 로고    scopus 로고
    • Inventory management of remanufacturable products
    • L.B. Toktay, L.M. Wein, and S.A. Zenios, Inventory management of remanufacturable products, Management Sci 46 (2000), 1412-1426.
    • (2000) Management Sci , vol.46 , pp. 1412-1426
    • Toktay, L.B.1    Wein, L.M.2    Zenios, S.A.3
  • 18
    • 0031251420 scopus 로고    scopus 로고
    • Production planning and inventory control with remanufacturing and disposal
    • E. van der Laan and M. Salomon, Production planning and inventory control with remanufacturing and disposal, European J Oper Res 102 (1997), 264-278.
    • (1997) European J Oper Res , vol.102 , pp. 264-278
    • Van Der Laan, E.1    Salomon, M.2
  • 19
    • 0345253867 scopus 로고    scopus 로고
    • Investigation of lead-time effects in manufacturing/remanufacturing sys tems under simple PUSH and PULL control strategies
    • E. van der Laan, M. Salomon, and R. Dekker, Investigation of lead-time effects in manufacturing/remanufacturing sys tems under simple PUSH and PULL control strategies, European J Oper Res 115 (1999), 195-214.
    • (1999) European J Oper Res , vol.115 , pp. 195-214
    • Van Der Laan, E.1    Salomon, M.2    Dekker, R.3
  • 21
    • 0001491020 scopus 로고    scopus 로고
    • 3) algorithm for the economic lot sizing problem with constant capacities
    • 3) algorithm for the economic lot sizing problem with constant capacities, Management Sci 42 (1996), 142-150.
    • (1996) Management Sci , vol.42 , pp. 142-150
    • Van Hoesel, C.P.M.1    Wagelmans, A.P.M.2
  • 22
    • 0035351621 scopus 로고    scopus 로고
    • Fully polynomial approximation schemes for single-item capacitated economic lot-sizing problems
    • C.P.M. van Hoesel and A.P.M. Wagelmans, Fully polynomial approximation schemes for single-item capacitated economic lot-sizing problems, Math Oper Res 26 (2001), 339-357.
    • (2001) Math Oper Res , vol.26 , pp. 339-357
    • Van Hoesel, C.P.M.1    Wagelmans, A.P.M.2
  • 23
    • 0000495984 scopus 로고
    • An O(n log n) algorithm that runs in linear time in the Wagner-Whitin case
    • A.P.M. Wagelmans, S. van Hoesel, and A. Kolen, An O(n log n) algorithm that runs in linear time in the Wagner-Whitin case, Oper Res 40 (1992), S145-S156.
    • (1992) Oper Res , vol.40
    • Wagelmans, A.P.M.1    Van Hoesel, S.2    Kolen, A.3
  • 24
    • 0040913946 scopus 로고
    • A postscript to "Dynamic problems in the theory of the firm,"
    • H.M. Wagner, A postscript to "Dynamic problems in the theory of the firm," Naval Res Logist Quart 7 (1960), 7-12.
    • (1960) Naval Res Logist Quart , vol.7 , pp. 7-12
    • Wagner, H.M.1
  • 25
    • 0001962762 scopus 로고
    • Dynamic version of the economic lot size model
    • H.M. Wagner and T.M. Whitin, Dynamic version of the economic lot size model, Management Sci 5 (1959), 89-96.
    • (1959) Management Sci , vol.5 , pp. 89-96
    • Wagner, H.M.1    Whitin, T.M.2
  • 26
    • 0000631024 scopus 로고
    • A backlogging model and a multiechelon model of a dynamic economic lot size production system - A network approach
    • W.I. Zangwill, A backlogging model and a multiechelon model of a dynamic economic lot size production system - a network approach, Management Sci 15 (1969), 506-527.
    • (1969) Management Sci , vol.15 , pp. 506-527
    • Zangwill, W.I.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.